Official UK procurement notice
EEAST - Accident Repairs · UK public procurement notice
Authority: East of England Ambulance Service NHS Trust (Central government)
What is being bought6 lots · detail below
Published requirement descriptionFor the provision of a recovery and repair service for damaged vehicles leased to the Contracting Authority, the property of, or in the custody or control of the Contracting Authority for all six (6) Lots as detailed below:
Lot 1 - Bedfordshire
Lot 2 - Cambridgeshire
Lot 3 - Hertfordshire
Lot 4 - Norfolk
Lot 5 - Suffolk
Lot 6 - Essex
The contract will run from 1st November 2025 to 31st October 2028 with the option to extend for two (2) x further periods of up to twelve (12) months.
- The authority expects to re-tender this requirement around 1 Aug 2030, 23:59 BST.
- No preliminary market engagement: Renewal of current service
CPV: Vehicle-fleet-support services
Lots and requirements (6)Procurement structure
6 lots · all with a published value (£1,500,000 together) · a supplier may bid for at most 1 and win at most 1 of them · same evaluation weights on every lotLot #1BedfordshireAwardedRenewalPublished value£250,000
The Authority is seeking a Supplier to provide a recovery and repair service within Bedfordshire for damaged vehicles leased to the Authority, the property of, or in the custody or control of the Authority.
This also includes Third Party vehicles where it is determined that the Authority are at fault for the damage and where the Authority is requested by the Third-Party vehicle owner to action the repairs
The repair service shall include all inspection, adjustment, restoration and replacement of assemblies and components used to construct a complete vehicle.
The Supplier is required to provide a 24/7 Roadside Recovery Service. Upon notification of the accident repair requirement, the Supplier shall:
•Attend the roadside and recover the vehicle within 2 hours (24/7)
•Attend the Authority’s premises and recover the vehicle within 4 hours (24/7)
The Supplier is to complete the repair service within twenty (20) working days from receipt of authorisation to proceed with the works., However, to reduce the Authority’s Vehicle Off Road (VOR) rate, the repairs must be completed as soon as practically possible.
Upon confirmation of the completion of the works, the vehicle must be returned to the Authority within four (4) working hours to the destination specified by the Authority. The destination could be at any of the Authority’s locations within Bedfordshire. Should the Authority have capacity, we will collect the vehicle from site upon confirmation of the completion of the works, but this is not guaranteed.
If the vehicle, following accident repair works, is with the Supplier for a duration of time that falls within the planned maintenance regime of the vehicle, the Supplier will be required to undertake the planned service/ maintenance on the vehicle following approval from the Authority representative
Lot #2CambridgeshireAwardedRenewalPublished value£250,000
The Authority is seeking a Supplier to provide a recovery and repair service within Cambridgeshire for damaged vehicles leased to the Authority, the property of, or in the custody or control of the Authority.
This also includes Third Party vehicles where it is determined that the Authority are at fault for the damage and where the Authority is requested by the Third-Party vehicle owner to action the repairs
The repair service shall include all inspection, adjustment, restoration and replacement of assemblies and components used to construct a complete vehicle.
The Supplier is required to provide a 24/7 Roadside Recovery Service. Upon notification of the accident repair requirement, the Supplier shall:
•Attend the roadside and recover the vehicle within 2 hours (24/7)
•Attend the Authority’s premises and recover the vehicle within 4 hours (24/7)
The Supplier is to complete the repair service within twenty (20) working days from receipt of authorisation to proceed with the works., However, to reduce the Authority’s Vehicle Off Road (VOR) rate, the repairs must be completed as soon as practically possible.
Upon confirmation of the completion of the works, the vehicle must be returned to the Authority within four (4) working hours to the destination specified by the Authority. The destination could be at any of the Authority’s locations within Cambridgeshire. Should the Authority have capacity, we will collect the vehicle from site upon confirmation of the completion of the works, but this is not guaranteed.
If the vehicle, following accident repair works, is with the Supplier for a duration of time that falls within the planned maintenance regime of the vehicle, the Supplier will be required to undertake the planned service/ maintenance on the vehicle following approval from the Authority representative
Lot #3HertfordshireAwardedRenewalPublished value£250,000
The Authority is seeking a Supplier to provide a recovery and repair service within Hertfordshire for damaged vehicles leased to the Authority, the property of, or in the custody or control of the Authority.
This also includes Third Party vehicles where it is determined that the Authority are at fault for the damage and where the Authority is requested by the Third-Party vehicle owner to action the repairs
The repair service shall include all inspection, adjustment, restoration and replacement of assemblies and components used to construct a complete vehicle.
The Supplier is required to provide a 24/7 Roadside Recovery Service. Upon notification of the accident repair requirement, the Supplier shall:
•Attend the roadside and recover the vehicle within 2 hours (24/7)
•Attend the Authority’s premises and recover the vehicle within 4 hours (24/7)
The Supplier is to complete the repair service within twenty (20) working days from receipt of authorisation to proceed with the works., However, to reduce the Authority’s Vehicle Off Road (VOR) rate, the repairs must be completed as soon as practically possible.
Upon confirmation of the completion of the works, the vehicle must be returned to the Authority within four (4) working hours to the destination specified by the Authority. The destination could be at any of the Authority’s locations within Hertfordshire. Should the Authority have capacity, we will collect the vehicle from site upon confirmation of the completion of the works, but this is not guaranteed.
If the vehicle, following accident repair works, is with the Supplier for a duration of time that falls within the planned maintenance regime of the vehicle, the Supplier will be required to undertake the planned service/ maintenance on the vehicle following approval from the Authority representative
Lot #4NorfolkAwardedRenewalPublished value£250,000
The Authority is seeking a Supplier to provide a recovery and repair service within Norfolk for damaged vehicles leased to the Authority, the property of, or in the custody or control of the Authority.
This also includes Third Party vehicles where it is determined that the Authority are at fault for the damage and where the Authority is requested by the Third-Party vehicle owner to action the repairs
The repair service shall include all inspection, adjustment, restoration and replacement of assemblies and components used to construct a complete vehicle.
The Supplier is required to provide a 24/7 Roadside Recovery Service. Upon notification of the accident repair requirement, the Supplier shall:
•Attend the roadside and recover the vehicle within 2 hours (24/7)
•Attend the Authority’s premises and recover the vehicle within 4 hours (24/7)
The Supplier is to complete the repair service within twenty (20) working days from receipt of authorisation to proceed with the works., However, to reduce the Authority’s Vehicle Off Road (VOR) rate, the repairs must be completed as soon as practically possible.
Upon confirmation of the completion of the works, the vehicle must be returned to the Authority within four (4) working hours to the destination specified by the Authority. The destination could be at any of the Authority’s locations within Norfolk. Should the Authority have capacity, we will collect the vehicle from site upon confirmation of the completion of the works, but this is not guaranteed.
If the vehicle, following accident repair works, is with the Supplier for a duration of time that falls within the planned maintenance regime of the vehicle, the Supplier will be required to undertake the planned service/ maintenance on the vehicle following approval from the Authority representative
Lot #5SuffolkAwardedRenewalPublished value£250,000
The Authority is seeking a Supplier to provide a recovery and repair service within Suffolk for damaged vehicles leased to the Authority, the property of, or in the custody or control of the Authority.
This also includes Third Party vehicles where it is determined that the Authority are at fault for the damage and where the Authority is requested by the Third-Party vehicle owner to action the repairs
The repair service shall include all inspection, adjustment, restoration and replacement of assemblies and components used to construct a complete vehicle.
The Supplier is required to provide a 24/7 Roadside Recovery Service. Upon notification of the accident repair requirement, the Supplier shall:
•Attend the roadside and recover the vehicle within 2 hours (24/7)
•Attend the Authority’s premises and recover the vehicle within 4 hours (24/7)
The Supplier is to complete the repair service within twenty (20) working days from receipt of authorisation to proceed with the works., However, to reduce the Authority’s Vehicle Off Road (VOR) rate, the repairs must be completed as soon as practically possible.
Upon confirmation of the completion of the works, the vehicle must be returned to the Authority within four (4) working hours to the destination specified by the Authority. The destination could be at any of the Authority’s locations within Suffolk. Should the Authority have capacity, we will collect the vehicle from site upon confirmation of the completion of the works, but this is not guaranteed.
If the vehicle, following accident repair works, is with the Supplier for a duration of time that falls within the planned maintenance regime of the vehicle, the Supplier will be required to undertake the planned service/ maintenance on the vehicle following approval from the Authority representative
Lot #6EssexAwardedRenewalPublished value£250,000
The Authority is seeking a Supplier to provide a recovery and repair service within Essex for damaged vehicles leased to the Authority, the property of, or in the custody or control of the Authority.
This also includes Third Party vehicles where it is determined that the Authority are at fault for the damage and where the Authority is requested by the Third-Party vehicle owner to action the repairs
The repair service shall include all inspection, adjustment, restoration and replacement of assemblies and components used to construct a complete vehicle.
The Supplier is required to provide a 24/7 Roadside Recovery Service. Upon notification of the accident repair requirement, the Supplier shall:
•Attend the roadside and recover the vehicle within 2 hours (24/7)
•Attend the Authority’s premises and recover the vehicle within 4 hours (24/7)
The Supplier is to complete the repair service within twenty (20) working days from receipt of authorisation to proceed with the works., However, to reduce the Authority’s Vehicle Off Road (VOR) rate, the repairs must be completed as soon as practically possible.
Upon confirmation of the completion of the works, the vehicle must be returned to the Authority within four (4) working hours to the destination specified by the Authority. The destination could be at any of the Authority’s locations within Essex. Should the Authority have capacity, we will collect the vehicle from site upon confirmation of the completion of the works, but this is not guaranteed.
If the vehicle, following accident repair works, is with the Supplier for a duration of time that falls within the planned maintenance regime of the vehicle, the Supplier will be required to undertake the planned service/ maintenance on the vehicle following approval from the Authority representative
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published sub-criteria (2)
- Technical Envelope: 50%
- Commercial Documents: 50%
Published award criteria (2)
- Technical Envelope: See invitation to tender documents
- Commercial Documents: See invitation to tender documents
- Price carries 50 of 100 points: a 10% discount moves about 5 points. This one is won on the number: sharpen the price before polishing the prose.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record- Procedure method
- Open procedure
- Legal basis
- UKPGA · 2023/54 Procurement Act 2023
- Procurement category
- Services
- Notice status
- Awarded
- Procurement threshold
- Above threshold (FTS publication)
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Yes · next expected 1 Aug 2030
- First published
- 11 Aug 2025, 17:17 BST
- Last source update
- 10 Nov 2025, 12:31 GMT
- Award evaluation window
- Submission end – 22 Sept 2025
- Authority reference
25-T05- FTS notice number
2025/S 000-047782- Latest notice
- Contract details notice (UK7)
- Classification (CPV)
- Delivery area
- Not published
- Official registry OCID
ocds-h6vhtk-058583Find a Tender
How it was run
Official notice- Submission deadline
- 5 Sept 2025, 12:00 BST
- Clarification deadline
- 26 Aug 2025, 17:00 BST
- Submission channel
- Official e-sourcing portal
- Electronic submission
- Allowed
- Accepted languages
- en
Timeline
11 Aug 2025 → 10 Nov 2025 · 8 dates- Tender notice published11 Aug 2025, 17:17 BST
- Clarification questions by26 Aug 2025, 17:00 BST
- Submission deadline5 Sept 2025, 12:00 BST
- Award decision expected by395 days ago22 Sept 2025, 23:59 BST
- Assessment summaries sent373 days ago15 Oct 2025, 00:00 BST
- Standstill ends363 days ago24 Oct 2025, 23:59 BST
- Contract starts356 days ago1 Nov 2025
- Latest notice published347 days ago10 Nov 2025, 12:31 GMT
Notice history
7 events · 5 releases on Find a Tender · since 11 Aug 2025- Tender notice published11 Aug 2025, 17:17 BSTUK4
- Tender notice published11 Aug 2025, 17:23 BSTUK4
- Tender notice published13 Aug 2025, 15:23 BSTUK4
- Contract award notice published15 Oct 2025, 16:09 BSTUK6
- Status changed to complete15 Oct 2025, 16:09 BST
- Contract signature expected27 Oct 2025, 23:59 GMTscheduled
- Contract details notice published10 Nov 2025, 12:31 GMTUK7
Published amendments (2)
Incorrect Weighting criteria
Number of lots the supplier can bid for has been updated
Routine re-releases (5)
- 2025-08: 2 releases · 11 Aug 2025, 11 Aug 2025
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| Across several lots1 award | |||
| Full Circle Enterprise LimitedSME1 Nov 2025 – 31 Oct 2028 · up to 31 Oct 2030Extensions: three (3) year contract with the option to extend for two (2) x further periods of twelve (12) months · Options: three (3) year contract with the option to extend for two (2) x further periods of twelve (12) months | £1,500,000 | 15 Oct 2025 | Awarded |
Contracts
EEAST - Accident Repairs · Full Circle Enterprise LimitedSME
- Signed
- 3 Nov 2025
- Value
- £1,500,000
- Period
- 4 Nov 2025 – 31 Oct 2028 · up to 31 Oct 2030 with extensions
- Status
- active
- Extensions
- three (3) year contract with the option to extend for two (2) x further periods of twelve (12) months
- Options
- three (3) year contract with the option to extend for two (2) x further periods of twelve (12) months
5 agreed KPIs: Repair works · Roadside Recovery Timescale · Station Recovery Timescale …
- Repair works, All vehicles must be fully repaired within Twenty (20) working days from approval of the Estimate to proceed.
- Roadside Recovery Timescale, Attend the roadside location site(s) within two (2) hours and recover the vehicle
- Station Recovery Timescale, Attend the Authority’s site(s) within four (4) hours and recover the vehicle
- Return of repaired vehicle timescale, Return the repaired vehicle back to the trust within four (4) working hours to the destination specified by the Authority
- Supply of costings Estimate, To provide an initial works costing estimate to the Authority representative within one (1) working day from the receival of the vehicle to Supplier’s site
Bid statistics published by the authority
| Lot | Bids | SME | VCSE | Valid bid range |
|---|---|---|---|---|
| 1 · Bedfordshire | 1final-stage tenders | 1 | 0 | — |
| 2 · Cambridgeshire | 1final-stage tenders | 1 | 0 | — |
| 3 · Hertfordshire | 1final-stage tenders | 1 | 0 | — |
| 4 · Norfolk | 1final-stage tenders | 1 | 0 | — |
| 5 · Suffolk | 2final-stage tenders | 1 | 0 | — |
| 6 · Essex | 2final-stage tenders | 1 | 0 | — |
Contracting authority & participating public bodies
Bidders & participating suppliers
1 commercial party on the notice- Full Circle Enterprise LimitedAwarded supplier
Official documents & specifications (5)
Official links; attachments are not copiedNotices published for this procedure
- Contract details notice Contract details notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Tender notice Tender notice on Find a Tender
- Tender notice Tender notice on Find a Tender
- Tender notice Tender notice on Find a Tender