DV4 Enterprise · UK public procurement notice

Official notice

Authority: Scottish Water

Framework agreement2 lotsWorksNegotiated procedure with prior call for competitionMax 1 lot to bid
Framework ceiling (notional)£9,000,000,000total for 2 lots · framework ceiling, not attributable revenue
Submissions closed 6 Jan 2025awarded 19 Mar 2026
Lots 2max 1 to bid

What is being bought2 lots · detail below

Published requirement description

Scottish Water is seeking to appoint suitably experienced Asset Delivery Partners and Primary Designer(s) and to deliver our SR27 and SR33 programme of capital works. SR27 is the regulatory period spanning from April 2027 until March 2033. SR33 is the regulatory period spanning from April 2033 until March 2039. Scottish Water aim to award this procurement by March 2026. It will run for a fixed period of seven years until March 2033 with an option to extend for a further six years until March 2039. <br/><br/>The Construction, Design and Management (CDM) 2015 Regulations will apply. Successful bidders will be required to utilise Scottish Waters Supply Chain and Specialist Frameworks. <br/><br/>To deliver the Capital Investment Programme SW is creating an Enterprise, an advanced partnering supply chain model which includes Asset Delivery Partners (ADP) and Primary Designer(s) (PD) working together in high performing integrated teams to deliver programmes of work. <br/><br/>The Enterprise model will have a dynamic outcome-based set of measures, with partners incentivised against service sub-programme and Enterprise outcomes and SW will have embedded resources within the Enterprise. There will also be minimum business performance thresholds in the form of KPI’s.<br/><br/>The Enterprise will incorporate enhanced partnering capabilities and a behavioural environment supporting closer resource integration, combined with a trading environment that also supports this approach. This will deliver affordability to support our investment targets, whilst also being adaptable and flexible enough to support changing requirements. <br/><br/>There will be collective focus on Beyond Zero Harm which helps us drive towards improving health, safety and wellbeing and partners will support Scottish Waters Beyond Net Zero ambitions.<br/><br/>This enterprise model procurement will be structured into two Lots: Lot 1 Primary Designer/s, Lot 2 Asset Delivery Partners

CPV: Construction work for water projects · Engineering design services · Engineering works and construction works

How this framework works

From the published notice
Bids received
9 bids on the busiest of 2 lots · 7 suppliers appointed

Lots and requirements (2)Procurement structure

2 lots · all with a published value · a supplier may bid for at most 1 of them
Lot #1Primary Designer(s)CancelledRenewalPublished value£1,300,000,000

Scottish Water is seeking to appoint a strategic partner(s) for the provision of Primary Designer services. This will provide assistance with the Strategic programme development, design and delivery of its Investment Programme and will cover improvement works associated with all Water and Wastewater assets across Scotland. This may include new assets, renewals, modification, maintenance, refurbishments, extensions and enhancements to existing assets. It is a requirement that bidders must be capable to act as the Principal Designer role under the Construction, Design and Management (CDM) 2015 Regulations, this includes pre construction responsibilities. <br/><br/>Estimated contract value across the framework for a 13 year period, expected to commence April 2026 is in the range of £600 million to £1.3bn. <br/>The Primary Designer will be engaged to provide strategic support, studies, design and technical services at pre, during and post construction, ensuring successful delivery of infrastructure and non-infrastructure programs. They will enhance and maintain a standard design and product library driving process engineering, Nature Based Solutions (NBS) and low carbon products and processes. The Primary Designer will maximise the use of repeatable designs and processes to deliver projects ensuring successful delivery of infrastructure and non-infrastructure programmes of work.<br/>The appointed primary designer(s) is expected to work with Scottish Water and Enterprise Partners over the duration of this agreement to develop effective collaboration, which may include the negotiation of incentive mechanisms, sharing of risk, co-location with multi-agency teams and secondment.<br/><br/>SW Primary designer will be required to support the Enterprises end to end processes, the Partner(s) that will provide Scottish Water’s Primary Designer services will support:<br/><br/>

  • Support Scottish Water Scottish Water Strategic Ambitions of; Service excellence, Beyond net zero emissions and Great value and financial sustainability.<br/>
  • The design and development of solutions for delivery by framework delivery partners or tendered contractors.<br/>
  • Create and develop design specifications, drawings, and technical documentation.<br/>
  • Collaborate with internal teams to align designs with operational and maintenance requirements.<br/>
  • Holds end to end accountability for project design.<br/>
  • Ensure compliance with SW requirements, relevant industry standards and regulations.<br/>
  • Manage Scottish Water’s standard products and design library whilst working with the wider SW supply chain.<br/>
  • Integration of Primary Designer outcomes with Common Data Environment (CDE) as required ensuring compliance with key areas e.g. file locations, file integrity, format etc<br/>
  • Drive standardisation in design and design management, low carbon products and processes and innovation across programmes and supply chains.<br/>
  • The study, investigation, data collection, modelling and identification of water and wastewater service related performance improvement requirements. <br/>
  • The provision of modelling support to inform the design and development of solutions.<br/>
  • The auditing and assessment of water and wastewater models developed by others.<br/>
  • Project management support and resources<br/>
  • The development and assessment of traditional and innovative asset and operational based solutions, feasibility studies, and investment appraisals to support decision making by the client.<br/>
  • Technical support<br/>
  • Provide expert technical advice and design support throughout the project lifecycle, from conception to completion providing buildability/delivery plan input and client design assurance. Develop outline plans and requirements to commission the projects being developed and how standard products will be commissioned - standard commissioning.<br/>
  • Provide expertise on an ‘as needed’ basis to ensure knowledge transfer and continuity of design support.<br/>
  • Provide digital handover packages and configure asset information, ensuring lessons learned are recorded.<br/>
  • Supply technically qualified professionals to be seconded to the water utility for defined periods to support in-house teams.<br/>
  • Undertake environmental impact assessments, studies, risk analyses, and technical evaluations as needed.<br/>
  • Evaluate alternative solutions for system upgrades or new infrastructure, providing recommendations based on cost, feasibility, and performance.<br/>
  • Support the client through strategic consultancy advice, including digital engineering / assembly techniques opportunities e.g. digital twin, rehearsal.<br/>
  • Provide expertise to support the understanding of future climate impacts on Scottish Waters assets and environment to ensure that systems and services are resilient to climate change.<br/><br/>The Primary Designer is responsible for design and takes accountability for design across the project lifecycle working with the integrated high performing Enterprise team it is a part of. The Primary Designer assesses the most effective way to deliver outcomes i.e. prioritises no build, less build / alternative solutions, efficient build. The Primary Designer works with the supply chain to identify and develop standardisation and alternative low carbon opportunities and agree Asset Delivery Partner or supply chain led elements of the design. The Primary Designer supports Client with asset planning and asset strategy/policy and standards.
Delivery: Scotland · Pan Scotland
Extensions: The framework will be 7 years initial term with 6 years’ worth of extension options (at the sole discretion of Scottish Water) to 2039 and SW will conduct a mid-point review of the agreement in 2030.Second stage: up to 6 candidates invited to tenderVariant bids: not allowed
Lot #2Asset Delivery PartnersCancelledRenewalPublished value£7,700,000,000

Scottish Water is seeking to appoint Asset Delivery Partners (ADPs) which will be accountable for driving programme/project delivery, liaising with the Enterprise Primary Designer and Integrator functions to perform Design & Build activities, while adhering to standardised designs. The ADP manages day-to-day activities during construction and coordinates the works with Scottish Water Operations until the point of asset handover.<br/><br/>Scottish Water is seeking to appoint suitably experienced Civils, Infrastructure and MEICA (Including Process Engineering capability) Asset Delivery Partners to deliver our SR27 and SR33 programme of capital works under an outcome-based Enterprise model. Works may include new assets and renewals, surveys and inspections, modifications, complex maintenance, refurbishments, extensions, and enhancements to existing assets. More specifically, the programmes of work based on the SR27 forecast include:<br/><br/>Design and construction of complex and non-complex civil engineering, mechanical, electrical, hydraulic, telemetry, control, instrumentation, and commissioning as required. This support will include works associated with new assets, renewals, modification, maintenance, and refurbishment of water and wastewater networks including mains rehabilitation and lining, sewerage networks, pumping stations and process works including mechanical, electrical, instrumentation and commissioning. The programme pipeline in SR27 includes but is not limited to UID and Flooding Network Capital Maintenance, Waste Water Treatments Works (WWTW) Upgrades & Growth, WWTW Capital Maintenance, Water Networks and new and replacement Pipelines, cleaning and maintenance, Water Treatment Works (WTW) upgrades & Capital Maintenance, Treated Water Storage build and repair.<br/><br/>We are looking for bidders who are committed to working in a safe, collaborative, and flexible way, who will support our drive for increased cost, carbon, time and standardisation efficiencies and who hold the appropriate capability and resources to help us deliver our strategic ambitions of Beyond Net Zero, Service Excellence and Great Value and Financial Sustainability. Successful bidders must be able to safely carry out Principal Contractor responsibilities and will be required to evidence their experience and capabilities in design and build activities for large and complex projects as well as operational requirements such as but not limited to; major water bursts, major sewer collapses and leakage support. Bidders must only bid as single entities and not as joint ventures or consortium. <br/><br/>The framework will be awarded from 2026-2033, with extension options, at client discretion based on business requirements, up to 2039. The estimated net value range of this procurement is £4bn - £7.7bn. Ranges are based on 2024 pricing and as such, Scottish Water reserves the right to index these values over the duration of the procurement. Successful partners will get an allocated share of this work as part of the advanced partnering approach. <br/><br/>Scottish Water reserves the right to augment the supply chain during SR27 to support emerging SR33 needs. SR33 is the period from 1st April 2033 until 31st March 2039. To facilitate this, a mid-point review of the SR27 supply chain will be conducted in 2030 and the current supply chain capacity and capability will be assessed at this time to ensure business requirements will be met. Based on the outcome of the review, Scottish Water reserves the right to procure additional/alternative supply chain contractor partners, as required.<br/><br/>The scope of the ADP (Lot 2) will be further divided into three sub-lots:<br/>2a) Civils <br/>

  • indicative works include creation of above or below ground civil structures e.g. storm tanks and treated water storage tanks.<br/>2b) Infrastructure<br/>
  • indicative works include installation of new pipework, replacement pipework, refurbished pipework or major repairs of water and sewer pipework, and water pipe lining.<br/>2c) Mechanical, Electrical, Instrumentation, Control and Automation (MEICA) - including Process Engineering, Commissioning Engineering and Smart Technology/Internet of Things (IoT).<br/>
  • Mechanical: This involves the design, installation and maintenance of mechanical systems including pumps, piping and treatment processes.<br/>
  • Electrical: This includes electrical site cabling, motor control centres (MCCs) and other electrical installations.<br/>
  • Instrumentation: This covers the devices and systems used to measure and control variables like flow, temperature, pressure and quality<br/>
  • Control: This includes operational technology, systems and software used to control and automate operational processes.<br/>
  • Automation: This refers to the integration of various systems to automate processes, improving efficiency and reliability including AI and data analytics.<br/>
  • Process Engineering: The includes the design, installation, integration and commissioning of process equipment to treat water and wastewater to the required standards for supply to customers or discharge to the environment.<br/>
  • Commissioning Engineering: Ensures that systems and components are designed, installed, tested, operated, and maintained according to the operational requirements of the client.<br/>
  • Smart Technology / IoT: Ability to design, install and commission smart technologies and IoT systems, including selecting appropriate technology, sensors, devices, and communication protocols. Ensuring these are integrated into site industrial control systems and connected to top-end communication and corporate data platforms.<br/><br/>These lots will be evaluated separately, and bidders are able to bid on one or multiple sub-lots. Bidders may be awarded more than one sub-lot.
Delivery: Scotland · Pan Scotland
Extensions: The framework will be 7 years initial term with 6 years’ worth of extension options (at the sole discretion of Scottish Water) to 2039 and SW will conduct a mid-point review of the agreement in 2030.Second stage: up to 12 candidates invited to tenderVariant bids: not allowed

What it takes to win
i

How this buyer will score bids.

The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).

Evaluation split and conditions of participation as published; the tender pack may add more
Shortlisting
See procurement documents for further information
What this means for your bid
  • “DV4 Enterprise” is a framework: the contest is a place on its panel, not a single contract.

Procedure terms & legal framework

From the official record · publisher note attached
Procedure method
Negotiated procedure with prior call for competition
Legal basis
CELEX · 32014L0025 Utilities Contracts Regulations 2016 (Directive 2014/25/EU)
Procurement category
Works
Notice status
Awarded
Procurement threshold
Unspecified in notice
Regulatory regime
Standard
Commercial structure
Framework agreement
Who may use this agreement
Not stated in the notice; call-off rights may be limited to the establishing authority
Competition type
Competitive procedure
GPA / WTO covered
Yes (GPA)
Recurring procurement
No (one-off requirement)
First published
25 Nov 2024, 16:55 GMT
Last source update
25 Mar 2026, 09:06 GMT
Authority reference
SW24/CON/1480
FTS notice number
2026/S 000-027118
Classification (CPV)
Construction work for water projectsEngineering design servicesEngineering works and construction works
Delivery area
Scotland (UKM)
Official registry OCID
ocds-h6vhtk-04be95 Find a Tender
Contract terms
Electronic trading
e-invoicing allowed · electronic ordering · electronic payment

Publisher note: Scottish Water reserves the right to augment the supply chain during SR27 to support emerging SR33 needs. To facilitate this, a mid-point review of the SR27 supply chain will be conducted in 2030 and the current supply chain capacity and capability will be assessed at this time to ensure business requirements will be met. Based on the outcome of this and subsequent reviews, Scottish Water reserves the right to procure additional/alternative supply chain enterprise partners, as required.<br/><br/>In SR27, Scottish Water will also procure a Domestic Subcontract Network (DSN) and a Tier 2/Regional framework which will be suitable for small/medium enterprises and specialist partners to work with the enterprise and will support capital and operational requirements. Wider frameworks will be procured for materials, plant and specialist water and wastewater equipment that all partners within the supply chain can utilise opening up further opportunities for the market to be part of the SR27 Scottish Water Supply Chain.

How it was run

Official notice
Run through: Atamis (Health Family) · Who buys & how to bid on Atamis
Supplier login requiredLanguage: EN
Access & registration note: Free · one account PER buying organisation portal · password resets come "from Salesforce.com" (check spam)
Appointment period ends
6 Jan 2025, 12:00 GMT
Submission channel
{"electronicSubmission","written"}
Accepted languages
en
Detailed submission instructions & authority contactsFrom official release

Timeline

6 Jan 2025 → 25 Mar 2026 · 2 dates
  1. Admission / appointment period endsperiod end, not a bid countdown
    6 Jan 2025, 12:00 GMT
  2. Notice published212 days ago
    25 Mar 2026, 09:06 GMT

Notice history

1 event · 2 releases on Find a Tender
  1. Status changed to complete
    25 Mar 2026, 09:06 GMT

Commercial outcome & contract awards

Published awards, contracts and bid statistics, not a forecast
Suppliers appointed 7admitted to the panel · see the list ↓
Bids received 9busiest of 2 lots
Contracts signed 7latest 19 Mar 2026

7 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.

Contracts

All 5 of these contracts carry the same published figure, £1,540,000,000, the framework's maximum for the whole notice, not each contract's own value. They are not eleven separate sums.

  • Lot 1 - Primary Designer(s)

    Signed
    19 Mar 2026
    Value
    £650,000,000
    Status
    active
  • Lot 1 - Primary Designer(s)

    Signed
    19 Mar 2026
    Value
    £650,000,000
    Status
    active
  • Lot 2 - Asset Delivery Partners

    Signed
    19 Mar 2026
    Value
    ceiling above
    Status
    active
  • Lot 2 - Asset Delivery Partners

    Signed
    19 Mar 2026
    Value
    ceiling above
    Status
    active
  • Lot 2 - Asset Delivery Partners

    Signed
    19 Mar 2026
    Value
    ceiling above
    Status
    active
  • Lot 2 - Asset Delivery Partners

    Signed
    19 Mar 2026
    Value
    ceiling above
    Status
    active
  • Lot 2 - Asset Delivery Partners

    Signed
    19 Mar 2026
    Value
    ceiling above
    Status
    active

Bid statistics published by the authority

LotBidsSMEVCSEValid bid range
1 · Primary Designer(s)4bids · 4 electronic0——
2 · Asset Delivery Partners9bids · 9 electronic0——

Contracting authority & participating public bodies

Scottish Water

Contracting authorityWater The Bridge, 6 Buchanan Gate, Stepps, Glasgow, Scotland, G33 6FBContact name, email, phone Published organisation website ↗

Dispute resolution & review bodies

  • Glasgow Sheriff CourtReview body Glasgow

Framework contractors & participating bidders

7 commercial parties on the notice
  • AECOM LimitedFramework contractor01846493 1 Tanfield Edinburgh, EH3 5DA, Edinburgh, Scotland, EH15 1NZ
  • Farrans LimitedFramework contractorNI004078 101 Kingsway Dunmurry Belfast, Belfast, Scotland, BT17 9NS
  • M Group Water (Network Infrastructure) LtdFramework contractor04530602 Abel Smith House, Gunnels Wood Road Stevenage Herts, Stevenage, Scotland, SG1 2ST
  • Mott MacDonald Bentley LtdFramework contractor3827321 Snaygill Industrial Estate, Keighley Road, Skipton, North Yorkshire, Skipton, Scotland, BD232QR
  • Ross-shire Engineering Limited (RSE)Framework contractorSC177939 Mansefield House, Muir Of Ord Industrial Estate, Muir Of Ord, Ross-Shire, IV6 7UA, Ross-Shire, Scotland, EH48 2UP
  • Stantec UK LtdFramework contractor01188070 Kelburn Court, Birchwood, Birchwood, Scotland, WA3 6UT
  • WGM EngineeringFramework contractorSC099834 1 Albion Court,  157 Woodville St Glasgow, Glasgow, Scotland, G51 2RQ

Official documents & specifications (2)

Official links; attachments are not copied

Tender pack and attachments

  • Economic and financial selection criteriatenderEconomic and financial selection criteria
  • Technical selection criteriatenderTechnical selection criteria