Official UK procurement notice
Disabled Adaptations Framework · UK public procurement notice
Authority: Bristol City Council (Local council)
What is being bought4 lots · detail below
Published requirement descriptionThis will be used to undertake Adaptative works, repair works, and maintenance to tenanted properties owned by Bristol City Council.
This is to be split into the below Lots:
- Repairs and minor works,
- Internal conversions /non structural work
- Structural adaptations
- Domestic lift installation
CPV: Building completion work · Building installation work
How this framework works
From the published notice- Type
- Closed framework
- Call-offs
- call-offs may be awarded directly or by further competition
- Bids received
- 6 bids on the busiest of 4 lots · 9 suppliers appointed
- Framework period
- 3 yrs · up to 4 yrs from 1 Nov 2025
Published description of the framework
Awarded Competition on advertised framework.
Lot 1 - Direct Award to 4 supplier, with mini competition of larger projects
Lot 2 - Direct Award to 2 suppliers
Lot 3 - No Award Made
Lot 4 - Direct Award to 2 suppliers, with mini competition of larger projects
Lots and requirements (4)Procurement structure
4 lots · all with a published value · same conditions of participation on every lot · same evaluation weights on every lotLot #1Major Alterations and Renewal of AdaptationsAwardedRenewalPublished value£9,120,000
Major Adaptations and Renewals of Adaptations in BCC owned or leased dwellings Properties with a value above £1,501.
Typical requirements will be for but not restricted to:
Adapted bathing facilities
Level access showers
Accessible low-level step-in shower tray with screens
Over bath showers
Wash /dry toileting
External works
Off road parking
Ramping and paths/ hardstanding
Permanent concrete ramps and steps.
Semi-permanent modular ramping systems.
Handrails.
Grab rails.
Safety fencing.
Accessible patios
Internal reconfigurations
Door widening
Structural alterations/ reconfigurations required to create accessible living space.
Kitchen adaptations including but not limited to carcasses, worktops, rise and fall worktops, electrics, plumbing, ventilation and gas, floor coverings. Complete accessible kitchen.
Partial renewal of kitchen to provide access to cupboards, appliances and worktops.
Safety padding.
Access doors
Widening of doorways
Low level threshold doors.
Automated door entry and intercom systems
Building Regulations
For Fast Track Works or if requested by the Surveyor, the Contractor is expected to submit Building Notice to Building Control for works that require Building Control sign off.
Design of Adaptations
For Fast Track Works only, the Contractor is required to submit the design of the adaptation.
Asbestos Surveys/removal
Where requested by the Surveyor, the Contractor is expected to organise an asbestos survey by an UKAS accredited surveying company.
Where asbestos removal is required, the contractor is expected to organise removal by a licensed asbestos removal Contractor.
- Economic & financial standing
As detailed within published ITT
- Technical & professional ability
As detailed within published ITT
Lot #2Reactive and Planned Repairs to Existing Adaptations.AwardedRenewalPublished value£5,080,000
Typical requirements will be "Reactive" and "Planned" (but not restricted to) repairs as described below:
"Reactive":
Repairs to Bathing Adaptations in BCC Dwellings.
Pump repair.
Repairs to electric care shower.
Repairs to thermostatic mixer showers.
Repairs to or replacement of vinyl safety flooring in bathing adaptations.
Repairs to shower seats, screens, curtains and rails.
"Planned":
Note that "planned repairs" or "rip-ups" cover the repair of defective or broken items and do not include any decorative elements. Planned repairs are issued following the receipt, assessment and approval of a Repair (rip up) Report by a Client's representative. If the Client's representative deems the adaptation beyond reasonable repair, a repair purchase order may not be issued and contractor will be asked to invoice for the Repair report fee.
Repairs to Bathing Adaptations in BCC Dwellings.
Repair of a bathing adaptation with a cost of £1,200 or above following approval of a 'Repair Report'. This may include:
Pump repair/ replacement.
Convert pumped waste to gravity where technically feasible.
Electric Care Shower repair/ replacement
Thermostatic mixer showers repair/ replacement.
Repairs to or replacement of vinyl safety flooring in bathing adaptations.
Repairs to shower seats, screens, curtains and rails.
Repairs to wall substrate.
Repairs to Specialised Adaptations or Equipment in BCC Dwellings.
Repairs to automated doors and door entry systems including intercom systems.
Repairs to rise and fall kitchen work surfaces.
Repairs and annual servicing to wash dry WCs.
Repairs to fences that have been specifically installed to provide safe areas.
Repairs to patio areas that have been specifically installed to provide access to a garden.
Asbestos Surveys/Removal
Where requested by the Surveyor, the Contractor is expected to organise an Asbestos Survey by an UKAS accredited surveying company.
Where asbestos removal is required, the Contractor is expected to organise removal by a licensed Asbestos removal contractor.
- Economic & financial standing
As detailed within published ITT
- Technical & professional ability
As detailed within published ITT
Lot #3Minor AlterationsAwardedRenewalPublished value£800,000
Typical requirements will be for but not restricted to:
Ramping and paths/ hardstanding
Permanent
Temporary/ modular systems
Handrails ("Kee Klamp")
Stair Rail/ balustrade alterations.
Grab rails - internal and external.
Shower seats.
Safety fencing.
Lever taps.
Key safes.
Bio Bidets.
Additional electrical sockets.
Door intercom systems.
Lighting alterations.
- Economic & financial standing
As detailed within published ITT
- Technical & professional ability
As detailed within published ITT
Lot #4Specialist Access Equipment and WorksAwardedRenewalPublished value£1,800,000
The Works will comprise of the installation of new internal and external Domestic Access Equipment for disabled children and adults in BCC Dwellings within the Bristol City Council boundary.
Typical requirements will be for but not restricted to:
Stairlifts
Straight Stairlifts
Curved Stairlifts
Through Floor Lifts
Fully enclosed
Partially enclosed
Other Lifts
Internal platform lifts.
External platform lifts
External step lifts
External stair lifts
Ancillary work for access equipment
Obsolete equipment - removal and correct disposal.
Carpentry and joinery - e.g. alteration to staircases. Forming of apertures in timber floors
Electrical works- e.g. the diversion of services.
Plumbing and heating works - e.g. the diversion of services.
Making good and decorating disturbed surfaces.
Excavation and groundworks.
Concreting works.
Brick and blockwork.
Asbestos - Where requested by the Surveyor, the Contractor is expected to organise an Asbestos Survey by an UKAS accredited surveying company.
Where asbestos removal is required, the Contractor is expected to organise removal by a licensed Asbestos removal contractor.
Planning Permission - obtaining any statutory approvals.
Building Control - obtaining any statutory approvals and sign offs.
Structural Engineer - reports and calculations necessary to achieve Building Control sign off.
Public Utilities - obtaining relevant permissions for arranging any necessary diversions.
- Economic & financial standing
As detailed within published ITT
- Technical & professional ability
As detailed within published ITT
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published sub-criteria (2)
- Quality & Social Value: 40%
- Price: 60%
Published award criteria (2)
- Price
- Quality & Social Value
- Economic & financial standing
As detailed within published ITT
- Technical & professional ability
As detailed within published ITT
- Price carries 60 of 100 points: a 10% discount moves about 6 points. This one is won on the number: sharpen the price before polishing the prose.
- “Disabled Adaptations Framework” is a framework: the contest is a place on its panel, not a single contract: call-offs may be direct or by further competition.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record- Procedure method
- Open procedure
- Legal basis
- UKPGA · 2023/54 Procurement Act 2023
- Procurement category
- Works
- Notice status
- Awarded
- Procurement threshold
- Above threshold (FTS publication)
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- Unspecified in notice
- First published
- 7 May 2025, 16:36 BST
- Last source update
- 21 Jan 2026, 10:45 GMT
- Award evaluation window
- Submission end – 5 Oct 2025
- Authority reference
DN773799- FTS notice number
2025/S 000-040636- Latest notice
- Contract details notice (UK7)
- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-050e32Find a Tender
How it was run
Official notice- Appointment period ends
- 15 Sept 2025, 12:00 BST
- Clarification deadline
- 27 Aug 2025, 12:00 BST
- Submission channel
- Official e-sourcing portal
- Electronic submission
- Allowed
- Accepted languages
- en
Tenders must be submitted before the advertised deadline via ProContract.
Timeline
7 May 2025 → 21 Jan 2026 · 10 dates- Planning notice published7 May 2025, 16:36 BST
- Next notice expected3 Jun 2025, 00:59 BST
- Tender notice published16 Jul 2025, 16:19 BST
- Clarification questions by27 Aug 2025, 12:00 BST
- Admission / appointment period endsperiod end, not a bid countdown15 Sept 2025, 12:00 BST
- Award decision expected by380 days ago5 Oct 2025, 23:59 BST
- Contract starts354 days ago1 Nov 2025
- Assessment summaries sent323 days ago2 Dec 2025
- Standstill ends312 days ago12 Dec 2025, 23:59 GMT
- Latest notice published273 days ago21 Jan 2026, 10:45 GMT
Notice history
10 events · 4 releases on Find a Tender · since 7 May 2025- Pipeline notice published7 May 2025, 16:36 BSTUK1
- Tender notice published16 Jul 2025, 16:19 BSTUK4
- Published value published: £16,800,00016 Jul 2025, 16:19 BST
- Status changed to active16 Jul 2025, 16:19 BST
- Procurement method changed16 Jul 2025, 16:19 BST
- Deadline published: 15 Sept 2025, 12:00 BST16 Jul 2025, 16:19 BST
- Contract award notice published3 Dec 2025, 09:52 GMTUK6
- Status changed to complete3 Dec 2025, 09:52 GMT
- Contract signature expected15 Dec 2025, 23:59 GMTscheduled
- Contract details notice published21 Jan 2026, 10:45 GMTUK7
Routine re-releases (4)
- 2025-05: 1 release · 7 May 2025
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| Lot 1 · Major Alterations and Renewal of Adaptations1 award | |||
| Axis CLC Solutions Limited, D R Jones Yeovil LtdSME, Hudson Plumbing & Heating Services LtdSME, JEFF WAY ELECTRICAL SERVICES LIMITEDSMELot 1 Major Adaptations and Voids over £15004 Jan 2026 – 3 Jan 2029 · up to 3 Jan 2030Extensions: Advertised 1 year extension | £9,120,000 | 1 Dec 2025 | Awarded |
| Lot 2 · Reactive and Planned Repairs to Existing Adaptations.1 award | |||
| Hudson Plumbing & Heating Services LtdSME, Masters Pipeline Services LtdSMELot 2 Repairs to Adaptations and specialist equipment4 Jan 2026 – 3 Jan 2029 · up to 3 Jan 2030Extensions: Advertised 1 year extension | £5,080,000 | 1 Dec 2025 | Awarded |
| Lot 3 · Minor Alterations1 award | |||
| Ashcroft Services LtdSMELot 3 Minor Adaptations below £15004 Jan 2026 – 3 Jan 2029 · up to 3 Jan 2030Extensions: Advertised 1 year extension | £800,000 | 1 Dec 2025 | Awarded |
| Lot 4 · Specialist Access Equipment and Works1 award | |||
| Dolphin Lifts (Western) LtdSME, LIFTECH SOLUTIONS LIMITEDSME, Wessex Lift Co LtdLot 4 Domestic Lift installation and all associated works4 Jan 2026 – 3 Jan 2029 · up to 3 Jan 2030Extensions: Advertised 1 year extension | £1,800,000 | 1 Dec 2025 | Awarded |
Contracts
Contract 4 · Dolphin Lifts (Western) LtdSME, LIFTECH SOLUTIONS LIMITEDSME, Wessex Lift Co Ltd
- Signed
- 21 Dec 2025
- Value
- £1,800,000
- Period
- 4 Jan 2026 – 3 Jan 2029 · up to 3 Jan 2030 with extensions
- Status
- active
- Extensions
- Optional 12 month extension at BCC discretion
3 agreed KPIs: Request for Provisional or Rip Up Report completed on time · Purchase Order completed on time · Respond to and Manage Complaints within Ten Working Days
- Request for Provisional or Rip Up Report completed on time, Request for Provisional or Rip Up Report completed on time
- Purchase Order completed on time, To measure Service Provider performance in completing Purchase Orders within the defined Response Time.
- Respond to and Manage Complaints within Ten Working Days, To measure the Service Provider's performance in managing and responding to complaints within 10 working days, as a quality compliance indicator.
Contract 1 · Axis CLC Solutions Limited, D R Jones Yeovil LtdSME, Hudson Plumbing & Heating Services LtdSME, JEFF WAY ELECTRICAL SERVICES LIMITEDSME
- Signed
- 20 Dec 2025
- Value
- £9,120,000
- Period
- 4 Jan 2026 – 3 Jan 2029 · up to 3 Jan 2030 with extensions
- Status
- active
- Extensions
- 12 month advertised extension at the discretion of Bristol City Council
3 agreed KPIs: Request for Provisional or Rip Up Report completed on time · Purchase Order completed on time · Respond to and Manage Complaints within Ten Working Days
- Request for Provisional or Rip Up Report completed on time, To measure Service Provider performance in completing Provisional Reports/Repair Report within the defined Response Time.
- Purchase Order completed on time, To measure Service Provider performance in completing Purchase Orders within the defined Response Time.
- Respond to and Manage Complaints within Ten Working Days, To measure the Service Provider's performance in managing and responding to complaints within 10 working days, as a quality compliance indicator.
Contract 2 · Hudson Plumbing & Heating Services LtdSME, Masters Pipeline Services LtdSME
- Signed
- 20 Dec 2025
- Value
- £5,080,000
- Period
- 4 Jan 2026 – 3 Jan 2029 · up to 3 Jan 2030 with extensions
- Status
- active
- Extensions
- Optional extension at the discretion of BCC
3 agreed KPIs: Request for Provisional or Rip Up Report completed on time · To measure Service Provider performance in completing Purchase Orders within the defined Response Time. · Respond to and Manage Complaints within Ten Working Days
- Request for Provisional or Rip Up Report completed on time, To measure Service Provider performance in completing Provisional Reports/Repair Report within the defined Response Time.
- To measure Service Provider performance in completing Purchase Orders within the defined Response Time., To measure Service Provider performance in completing Purchase Orders within the defined Response Time.
- Respond to and Manage Complaints within Ten Working Days, To measure the Service Provider's performance in managing and responding to complaints within 10 working days, as a quality compliance indicator.
Bid statistics published by the authority
| Lot | Bids | SME | VCSE | Valid bid range |
|---|---|---|---|---|
| 1 · Major Alterations and Renewal of Adaptations | 5final-stage tenders · 11 at stage one | 4 | 0 | — |
| 2 · Reactive and Planned Repairs to Existing Adaptations. | 3final-stage tenders · 6 at stage one | 3 | 0 | — |
| 3 · Minor Alterations | 6final-stage tenders · 7 at stage one | 5 | 0 | — |
| 4 · Specialist Access Equipment and Works | 5final-stage tenders | 4 | 0 | — |
Who bid
- wonC.L.C. CONTRACTORS LIMITED · South East England · 1, 2
- wonD R JONES YEOVIL LTD.SME · South West England · 1
- wonHUDSON PLUMBING & HEATING SERVICES LIMITEDSME · South West England · 1, 2
- wonJEFF WAY ELECTRICAL SERVICES LIMITEDSME · South West England · 1
- wonMasters Pipeline Services LtdSME · South West England · 2
- did not winIAN WILLIAMS LIMITED · South West England · 1
Bidders as named on the Procurement Act 2023 award notice. “Won” means the bidder holds an award on this notice.
Contracting authority & participating public bodies
Framework contractors & participating bidders
10 commercial parties on the notice · 9 awarded- ASHCROFT SERVICES LIMITEDFramework contractor
- C.L.C. CONTRACTORS LIMITEDFramework contractor
- D R JONES YEOVIL LTD.Framework contractor
- DOLPHIN LIFTS (WESTERN) LTDFramework contractor
- HUDSON PLUMBING & HEATING SERVICES LIMITEDFramework contractor
- IAN WILLIAMS LIMITEDBidder / tenderer
- JEFF WAY ELECTRICAL SERVICES LIMITEDFramework contractor
- LIFTECH SOLUTIONS LIMITEDFramework contractor
- Masters Pipeline Services LtdFramework contractor
- WESSEX LIFT CO LTDFramework contractor
Official documents & specifications (10)
Official links; attachments are not copiedTender pack and attachments
- Bidding documents and specifications Documents can be found on ProContract
Notices published for this procedure
- Contract details notice Contract details notice on Find a Tender
- Contract details notice Contract details notice on Find a Tender
- Contract details notice Contract details notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Tender notice Tender notice on Find a Tender
- Pipeline notice Pipeline notice on Find a Tender