DfI Roads and Rivers T-1092 TC for Maintenance and Improvement of Structures 2019
Authority: DfI Transport and Road Asset Management (TRAM) (Central government)
The work involves the maintenance and improvement to structures and associated ancillary works for five contract areas. Refer to MoI Part B 7.3.1.
What is being bought
Published requirement descriptionNo description was published on the notice. See the official documents.
CPV: Construction work · Works for complete or part construction and civil engineering work
The lotProcurement structure
single lot · no lot value publishedLot #1STN1
The work involves the maintenance and improvement to structures and associated ancillary works for five contract areas. Refer to MoI Part B 7.3.1.
Within each contract, the works may include but not be limited to the following principal work activities which are provided by way of example:
A. stonework,
B. sprayed concrete,
C. reinforced concrete repairs,
D. working with services/utilities,
E. vehicle restraint systems installation or repair,
F. reinforced concrete construction,
G. installation of precast beams or box culverts,
H. TTM/dealing with live traffic on Public Roads.
The works may also include but not be limited to the following activities:
- pressure pointing,
- bridge expansion joints,
- structural steel painting,
- structural steelwork,
- temporary works,
- waterproofing,
- demolition,
- emergency response.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
- “DfI Roads and Rivers T-1092 TC for Maintenance and Improvement of…” is a framework: the contest is a place on its panel, not a single contract.
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast1 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.
Contracts
STN1
- Signed
- 15 Oct 2020
- Value
- £9,010,000
- Status
- active
- Change The STN1 contract was modified in April 2022 following the introduction of a Translink requirement for contractors undertaking works on or adjacent to Northern Ireland Railways (NIR) infrastructure to hold £100 million Public Liability Insurance. This enabled STN1 to be utilised for the delivery of NIR-related structures inspections and maintenance activities across Northern Ireland. These additional services were delivered through STN1 from April 2022 until April 2024, at which point responsibility for all rail-related works transferred to the STN2 contract. The present modification does not introduce any further NIR-related services to STN1. It relates solely to the expenditure incurred through STN1 in delivering the additional NIR works between April 2022 and April 2024, with the contract value being adjusted to restore the value utilised in delivering those additional services., Need for additional works, services or supplies by the original contractor/concessionaire: During the period from April 2022 to April 2024, the incumbent STN1 contractor had secured the required £100 million Public Liability Insurance, established the necessary operational procedures, obtained relevant access approvals and developed familiarity with the NIR assets and operational environment. A change of contractor during this period would have required an alternative contractor to establish equivalent insurance, mobilisation, access and operational arrangements. This would have resulted in duplication of costs, delays to service delivery and increased operational risk. Accordingly, use of the incumbent contractor avoided significant inconvenience and duplication of costs associated with procuring and mobilising an alternative contractor for the interim period prior to the transfer of the rail-related works to STN2 in April 2024.
Procedure terms & legal framework
From the official record- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Unspecified in notice
- First published
- 3 Nov 2026, 10:03 GMT
- Last source update
- 3 Nov 2026, 10:03 GMT
- FTS notice number
2026/S 000-104031- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-079630Find a Tender
Contracting authority & participating public bodies
Dispute resolution & review bodies
- The High CourtReview body
Framework contractors & participating bidders
1 commercial party on the notice- Highway Barrier Solutions LtdFramework contractor
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.