Unmodified official OCDS data retained by Tenderline for this procurement process.
Complete current OCDS release JSON
{
"id": "032155-2023",
"tag": [
"award",
"contract"
],
"bids": {
"statistics": [
{
"id": "1",
"value": 5,
"measure": "bids",
"relatedLot": "1"
},
{
"id": "2",
"value": 1,
"measure": "smeBids",
"relatedLot": "1"
},
{
"id": "3",
"value": 0,
"measure": "foreignBidsFromEU",
"relatedLot": "1"
},
{
"id": "4",
"value": 1,
"measure": "foreignBidsFromNonEU",
"relatedLot": "1"
},
{
"id": "5",
"value": 5,
"measure": "electronicBids",
"relatedLot": "1"
}
]
},
"date": "2023-10-31T14:31:59Z",
"ocid": "ocds-h6vhtk-03fa54",
"buyer": {
"id": "GB-FTS-91925",
"name": "DfE: The Renewable Electricity Team RET"
},
"awards": [
{
"id": "032155-2023-1-1",
"title": "Contract",
"status": "active",
"suppliers": [
{
"id": "GB-FTS-96742",
"name": "Aurora Energy Research"
}
],
"relatedLots": [
"1"
]
}
],
"tender": {
"id": "ID: 4917719",
"lots": [
{
"id": "1",
"status": "cancelled",
"options": {
"description": "one optional extension of any period up to and including 6 months"
},
"hasOptions": true,
"description": "DfE - Renewable Electricity Team wishes to appoint a “Contractor” who will be responsible for delivering the three key outcomes set out in the specification in order to support DfE in meeting its Energy Strategy Climate Change Act (Northern Ireland) 2022 ambitions. The 3 outcomes include developing a high-level support scheme design, Conducting quantitative modelling exercises and a financial impact assessment. It is anticipated this contract will commence early October 2023 and initially run for 12 months. The Accelerated Open Procedure has been chosen as there is an urgent requirement for the service to be set up. The Executive’s new Energy Strategy - Path to Net Zero Energy was published in December 2021, followed by the Energy Strategy Action Plan in March 2023. Action point 7 of the plan commits the Department for the Economy to publishing the final design of renewable electricity support by the end of the year, along with a pathway and timeline for the support being in place. Delivery of the support scheme design for Northern Ireland cannot occur without a solid evidence base to support policy decisions. There is therefore a need for timely and relevant expert advice in order to shape an incentive scheme to meet current and anticipated levels of demand in Northern Ireland in this new decade and beyond. In order to meet the target set by the 2023 Energy Strategy Action Plan the Renewable Electricity Team requires urgent consultancy support to be completed by early December 2023 at the latest.",
"awardCriteria": {
"criteria": [
{
"name": "Outcome 1: Develop the high-level support scheme design",
"type": "quality",
"description": "17.5"
},
{
"name": "Outcome 2: Modelling",
"type": "quality",
"description": "11.2"
},
{
"name": "Outcome 3 Financial Impact Assessment",
"type": "quality",
"description": "11.2"
},
{
"name": "Key Personnel Experience",
"type": "quality",
"description": "11.2"
},
{
"name": "Social Value: Supporting Health Wellbeing",
"type": "quality",
"description": "10.5"
},
{
"name": "Contract Management",
"type": "quality",
"description": "8.4"
},
{
"name": "Total Contract Price",
"type": "cost",
"description": "30"
}
]
}
}
],
"items": [
{
"id": "1",
"relatedLot": "1",
"deliveryAddresses": [
{
"region": "UKN"
}
],
"additionalClassifications": [
{
"id": "73220000",
"scheme": "CPV",
"description": "Development consultancy services"
},
{
"id": "73210000",
"scheme": "CPV",
"description": "Research consultancy services"
}
]
}
],
"title": "DfE - Renewable Electricity Team - Renewable Electricity Support Scheme Design",
"status": "complete",
"coveredBy": [
"GPA"
],
"procedure": {
"isAccelerated": true,
"acceleratedRationale": "The Accelerated Open Procedure was chosen as there is an urgent requirement for the service to be set up in order to meet the target set by the 2023 Energy Strategy Action Plan. The Renewable Electricity Team requires urgent consultancy support to be completed by early December 2023 at the latest."
},
"legalBasis": {
"id": "32014L0024",
"scheme": "CELEX"
},
"description": "DfE - Renewable Electricity Team wishes to appoint a “Contractor” who will be responsible for delivering the three key outcomes set out in the specification in order to support DfE in meeting its Energy Strategy Climate Change Act (Northern Ireland) 2022 ambitions. The 3 outcomes include developing a high-level support scheme design, Conducting quantitative modelling exercises and a financial impact assessment. It is anticipated this contract will commence early October 2023 and initially run for 12 months. The Accelerated Open Procedure has been chosen as there is an urgent requirement for the service to be set up. The Executive’s new Energy Strategy - Path to Net Zero Energy was published in December 2021, followed by the Energy Strategy Action Plan in March 2023. Action point 7 of the plan commits the Department for the Economy to publishing the final design of renewable electricity support by the end of the year, along with a pathway and timeline for the support being in place. Delivery of the support scheme design for Northern Ireland cannot occur without a solid evidence base to support policy decisions. There is therefore a need for timely and relevant expert advice in order to shape an incentive scheme to meet current and anticipated levels of demand in Northern Ireland in this new decade and beyond. In order to meet the target set by the 2023 Energy Strategy Action Plan the Renewable Electricity Team requires urgent consultancy support to be completed by early December 2023 at the latest.",
"reviewDetails": "CPD complied with the Public Contracts Regulations 2015 (as amended) and incorporated a standstill period (i.e. a minimum of 10 calendar days) at the point information on the award of contract was communicated to tenderers. That notification provided full information on the award decision. This provided time for the unsuccessful tenderers to challenge the award decision before the contract was entered into",
"classification": {
"id": "73000000",
"scheme": "CPV",
"description": "Research and development services and related consultancy services"
},
"procurementMethod": "open",
"mainProcurementCategory": "services",
"procurementMethodDetails": "Open procedure"
},
"parties": [
{
"id": "GB-FTS-91925",
"name": "DfE: The Renewable Electricity Team RET",
"roles": [
"buyer",
"centralPurchasingBody"
],
"address": {
"region": "UK",
"locality": "BELFAST",
"postalCode": "BT2 8FD",
"countryName": "United Kingdom",
"streetAddress": "Adelaide House, 39-49 Adelaide Street"
},
"details": {
"url": "https://etendersni.gov.uk/epps",
"buyerProfile": "https://etendersni.gov.uk/epps",
"classifications": [
{
"id": "BODY_PUBLIC",
"scheme": "TED_CA_TYPE",
"description": "Body governed by public law"
},
{
"id": "01",
"scheme": "COFOG",
"description": "General public services"
}
]
},
"identifier": {
"legalName": "DfE: The Renewable Electricity Team RET"
},
"contactPoint": {
"name": "SSDAdmin.CPDfinance-ni.gov.uk",
"email": "SSDAdmin@CPDfinance-ni.gov.uk"
}
},
{
"id": "GB-FTS-96742",
"name": "Aurora Energy Research",
"roles": [
"supplier"
],
"address": {
"region": "UK",
"locality": "Oxford",
"postalCode": "OX1 1TP",
"countryName": "United Kingdom",
"streetAddress": "2-3 Cambridge Terrace"
},
"details": {
"url": "https://etendersni.gov.uk/epps",
"scale": "sme"
},
"identifier": {
"legalName": "Aurora Energy Research"
},
"contactPoint": {
"email": "sebastian.just@auroraer.com",
"telephone": "+44 1865952700"
}
},
{
"id": "GB-FTS-20217",
"name": "The UK does not have any such bodies with responsibility for appeal/mediation procedures. Instead; any challenges are dealt with by the High Court, Commercial Division, to which proceedings may be issued regarding alleged breaches of the PCR 2015 as amended.",
"roles": [
"reviewBody"
],
"address": {
"locality": "Belfast",
"countryName": "United Kingdom"
},
"identifier": {
"legalName": "The UK does not have any such bodies with responsibility for appeal/mediation procedures. Instead; any challenges are dealt with by the High Court, Commercial Division, to which proceedings may be issued regarding alleged breaches of the PCR 2015 as amended."
}
}
],
"language": "en",
"contracts": [
{
"id": "032155-2023-1-1",
"title": "Contract",
"value": {
"amount": 174989,
"currency": "GBP"
},
"status": "active",
"awardID": "032155-2023-1-1",
"dateSigned": "2023-10-31T00:00:00Z"
}
],
"description": "The successful contractor’s performance on the contract will be regularly monitored. Contractors not delivering on contract requirements is a serious matter. It means the public purse is not getting what it is paying for. If a contractor fails to reach satisfactory levels of contract performance they will be given a specified time to improve. If, after the specified time, they still fail to reach satisfactory levels of contract performance, the matter will be escalated to senior management in CPD for further action. If this occurs and their performance still does not improve to satisfactory levels within the specified period, it may be regarded as an act of grave professional misconduct and they may be issued with a Certificate of Unsatisfactory Performance and the. contract may be terminated. The issue of a Certificate of Unsatisfactory Performance will result in the contractor being excluded from all procurement competitions being undertaken by Centres of Procurement Expertise on behalf of bodies covered by the Northern Ireland Procurement Policy for a period of twelve months from the date of issue of the certificate.",
"initiationType": "tender"
}Complete JSON history (2 releases)
31 Oct 2023 · 032155-2023 · award, contract
{
"id": "032155-2023",
"tag": [
"award",
"contract"
],
"bids": {
"statistics": [
{
"id": "1",
"value": 5,
"measure": "bids",
"relatedLot": "1"
},
{
"id": "2",
"value": 1,
"measure": "smeBids",
"relatedLot": "1"
},
{
"id": "3",
"value": 0,
"measure": "foreignBidsFromEU",
"relatedLot": "1"
},
{
"id": "4",
"value": 1,
"measure": "foreignBidsFromNonEU",
"relatedLot": "1"
},
{
"id": "5",
"value": 5,
"measure": "electronicBids",
"relatedLot": "1"
}
]
},
"date": "2023-10-31T14:31:59Z",
"ocid": "ocds-h6vhtk-03fa54",
"buyer": {
"id": "GB-FTS-91925",
"name": "DfE: The Renewable Electricity Team RET"
},
"awards": [
{
"id": "032155-2023-1-1",
"title": "Contract",
"status": "active",
"suppliers": [
{
"id": "GB-FTS-96742",
"name": "Aurora Energy Research"
}
],
"relatedLots": [
"1"
]
}
],
"tender": {
"id": "ID: 4917719",
"lots": [
{
"id": "1",
"status": "cancelled",
"options": {
"description": "one optional extension of any period up to and including 6 months"
},
"hasOptions": true,
"description": "DfE - Renewable Electricity Team wishes to appoint a “Contractor” who will be responsible for delivering the three key outcomes set out in the specification in order to support DfE in meeting its Energy Strategy Climate Change Act (Northern Ireland) 2022 ambitions. The 3 outcomes include developing a high-level support scheme design, Conducting quantitative modelling exercises and a financial impact assessment. It is anticipated this contract will commence early October 2023 and initially run for 12 months. The Accelerated Open Procedure has been chosen as there is an urgent requirement for the service to be set up. The Executive’s new Energy Strategy - Path to Net Zero Energy was published in December 2021, followed by the Energy Strategy Action Plan in March 2023. Action point 7 of the plan commits the Department for the Economy to publishing the final design of renewable electricity support by the end of the year, along with a pathway and timeline for the support being in place. Delivery of the support scheme design for Northern Ireland cannot occur without a solid evidence base to support policy decisions. There is therefore a need for timely and relevant expert advice in order to shape an incentive scheme to meet current and anticipated levels of demand in Northern Ireland in this new decade and beyond. In order to meet the target set by the 2023 Energy Strategy Action Plan the Renewable Electricity Team requires urgent consultancy support to be completed by early December 2023 at the latest.",
"awardCriteria": {
"criteria": [
{
"name": "Outcome 1: Develop the high-level support scheme design",
"type": "quality",
"description": "17.5"
},
{
"name": "Outcome 2: Modelling",
"type": "quality",
"description": "11.2"
},
{
"name": "Outcome 3 Financial Impact Assessment",
"type": "quality",
"description": "11.2"
},
{
"name": "Key Personnel Experience",
"type": "quality",
"description": "11.2"
},
{
"name": "Social Value: Supporting Health Wellbeing",
"type": "quality",
"description": "10.5"
},
{
"name": "Contract Management",
"type": "quality",
"description": "8.4"
},
{
"name": "Total Contract Price",
"type": "cost",
"description": "30"
}
]
}
}
],
"items": [
{
"id": "1",
"relatedLot": "1",
"deliveryAddresses": [
{
"region": "UKN"
}
],
"additionalClassifications": [
{
"id": "73220000",
"scheme": "CPV",
"description": "Development consultancy services"
},
{
"id": "73210000",
"scheme": "CPV",
"description": "Research consultancy services"
}
]
}
],
"title": "DfE - Renewable Electricity Team - Renewable Electricity Support Scheme Design",
"status": "complete",
"coveredBy": [
"GPA"
],
"procedure": {
"isAccelerated": true,
"acceleratedRationale": "The Accelerated Open Procedure was chosen as there is an urgent requirement for the service to be set up in order to meet the target set by the 2023 Energy Strategy Action Plan. The Renewable Electricity Team requires urgent consultancy support to be completed by early December 2023 at the latest."
},
"legalBasis": {
"id": "32014L0024",
"scheme": "CELEX"
},
"description": "DfE - Renewable Electricity Team wishes to appoint a “Contractor” who will be responsible for delivering the three key outcomes set out in the specification in order to support DfE in meeting its Energy Strategy Climate Change Act (Northern Ireland) 2022 ambitions. The 3 outcomes include developing a high-level support scheme design, Conducting quantitative modelling exercises and a financial impact assessment. It is anticipated this contract will commence early October 2023 and initially run for 12 months. The Accelerated Open Procedure has been chosen as there is an urgent requirement for the service to be set up. The Executive’s new Energy Strategy - Path to Net Zero Energy was published in December 2021, followed by the Energy Strategy Action Plan in March 2023. Action point 7 of the plan commits the Department for the Economy to publishing the final design of renewable electricity support by the end of the year, along with a pathway and timeline for the support being in place. Delivery of the support scheme design for Northern Ireland cannot occur without a solid evidence base to support policy decisions. There is therefore a need for timely and relevant expert advice in order to shape an incentive scheme to meet current and anticipated levels of demand in Northern Ireland in this new decade and beyond. In order to meet the target set by the 2023 Energy Strategy Action Plan the Renewable Electricity Team requires urgent consultancy support to be completed by early December 2023 at the latest.",
"reviewDetails": "CPD complied with the Public Contracts Regulations 2015 (as amended) and incorporated a standstill period (i.e. a minimum of 10 calendar days) at the point information on the award of contract was communicated to tenderers. That notification provided full information on the award decision. This provided time for the unsuccessful tenderers to challenge the award decision before the contract was entered into",
"classification": {
"id": "73000000",
"scheme": "CPV",
"description": "Research and development services and related consultancy services"
},
"procurementMethod": "open",
"mainProcurementCategory": "services",
"procurementMethodDetails": "Open procedure"
},
"parties": [
{
"id": "GB-FTS-91925",
"name": "DfE: The Renewable Electricity Team RET",
"roles": [
"buyer",
"centralPurchasingBody"
],
"address": {
"region": "UK",
"locality": "BELFAST",
"postalCode": "BT2 8FD",
"countryName": "United Kingdom",
"streetAddress": "Adelaide House, 39-49 Adelaide Street"
},
"details": {
"url": "https://etendersni.gov.uk/epps",
"buyerProfile": "https://etendersni.gov.uk/epps",
"classifications": [
{
"id": "BODY_PUBLIC",
"scheme": "TED_CA_TYPE",
"description": "Body governed by public law"
},
{
"id": "01",
"scheme": "COFOG",
"description": "General public services"
}
]
},
"identifier": {
"legalName": "DfE: The Renewable Electricity Team RET"
},
"contactPoint": {
"name": "SSDAdmin.CPDfinance-ni.gov.uk",
"email": "SSDAdmin@CPDfinance-ni.gov.uk"
}
},
{
"id": "GB-FTS-96742",
"name": "Aurora Energy Research",
"roles": [
"supplier"
],
"address": {
"region": "UK",
"locality": "Oxford",
"postalCode": "OX1 1TP",
"countryName": "United Kingdom",
"streetAddress": "2-3 Cambridge Terrace"
},
"details": {
"url": "https://etendersni.gov.uk/epps",
"scale": "sme"
},
"identifier": {
"legalName": "Aurora Energy Research"
},
"contactPoint": {
"email": "sebastian.just@auroraer.com",
"telephone": "+44 1865952700"
}
},
{
"id": "GB-FTS-20217",
"name": "The UK does not have any such bodies with responsibility for appeal/mediation procedures. Instead; any challenges are dealt with by the High Court, Commercial Division, to which proceedings may be issued regarding alleged breaches of the PCR 2015 as amended.",
"roles": [
"reviewBody"
],
"address": {
"locality": "Belfast",
"countryName": "United Kingdom"
},
"identifier": {
"legalName": "The UK does not have any such bodies with responsibility for appeal/mediation procedures. Instead; any challenges are dealt with by the High Court, Commercial Division, to which proceedings may be issued regarding alleged breaches of the PCR 2015 as amended."
}
}
],
"language": "en",
"contracts": [
{
"id": "032155-2023-1-1",
"title": "Contract",
"value": {
"amount": 174989,
"currency": "GBP"
},
"status": "active",
"awardID": "032155-2023-1-1",
"dateSigned": "2023-10-31T00:00:00Z"
}
],
"description": "The successful contractor’s performance on the contract will be regularly monitored. Contractors not delivering on contract requirements is a serious matter. It means the public purse is not getting what it is paying for. If a contractor fails to reach satisfactory levels of contract performance they will be given a specified time to improve. If, after the specified time, they still fail to reach satisfactory levels of contract performance, the matter will be escalated to senior management in CPD for further action. If this occurs and their performance still does not improve to satisfactory levels within the specified period, it may be regarded as an act of grave professional misconduct and they may be issued with a Certificate of Unsatisfactory Performance and the. contract may be terminated. The issue of a Certificate of Unsatisfactory Performance will result in the contractor being excluded from all procurement competitions being undertaken by Centres of Procurement Expertise on behalf of bodies covered by the Northern Ireland Procurement Policy for a period of twelve months from the date of issue of the certificate.",
"initiationType": "tender"
}6 Sept 2023 · 026283-2023 · tender
{
"id": "026283-2023",
"tag": [
"tender"
],
"date": "2023-09-06T09:58:42+01:00",
"ocid": "ocds-h6vhtk-03fa54",
"buyer": {
"id": "GB-FTS-91925",
"name": "DfE: The Renewable Electricity Team RET"
},
"tender": {
"id": "ID 4917719",
"lots": [
{
"id": "1",
"value": {
"amount": 200000,
"currency": "GBP"
},
"status": "active",
"options": {
"description": "A contract extension for a further 6-month period may be applicable as a contingency measure, in order to address unforeseen delays or to allow the Contractor to address comments by the Client on any of the draft deliverables. During the course of the contract, should additional work within the core scope of this tender specification be identified, the 6-month contract extension may also be used to allow for such work to be conducted."
},
"hasOptions": true,
"hasRenewal": false,
"description": "DfE - Renewable Electricity Team wishes to appoint a “Contractor” who will be responsible for delivering the three key outcomes set out in the specification in order to support DfE in meeting its Energy Strategy Climate Change Act (Northern Ireland) 2022 ambitions. The 3 outcomes include developing a high-level support scheme design, Conducting quantitative modelling exercises and a financial impact assessment. It is anticipated this contract will commence early October 2023 and initially run for 12 months. The Accelerated Open Procedure has been chosen as there is an urgent requirement for the service to be set up. The Executive’s new Energy Strategy - Path to Net Zero Energy was published in December 2021, followed by the Energy Strategy Action Plan in March 2023. Action point 7 of the plan commits the Department for the Economy to publishing the final design of renewable electricity support by the end of the year, along with a pathway and timeline for the support being in place. Delivery of the support scheme design for Northern Ireland cannot occur without a solid evidence base to support policy decisions. There is therefore a need for timely and relevant expert advice in order to shape an incentive scheme to meet current and anticipated levels of demand in Northern Ireland in this new decade and beyond. In order to meet the target set by the 2023 Energy Strategy Action Plan the Renewable Electricity Team requires urgent consultancy support to be completed by early December 2023 at the latest. Additional information: The Accelerated Open Procedure has been chosen as there is an urgent requirement for the service to be set up. The Executive’s new Energy Strategy - Path to Net Zero Energy was published in December 2021, followed by the Energy Strategy Action Plan in March 2023. Action point 7 of the plan commits the Department for the Economy to publishing the final design of renewable electricity support by the end of the year, along with a pathway and timeline for the support being in place. Delivery of the support scheme design for Northern Ireland cannot occur without a solid evidence base to support policy decisions. There is therefore a need for timely and relevant expert advice in order to shape an incentive scheme to meet current and anticipated levels of demand in Northern Ireland in this new decade and beyond. In order to meet the target set by the 2023 Energy Strategy Action Plan the Renewable Electricity Team requires urgent consultancy support to be completed by December 2023 at the latest.",
"awardCriteria": {
"criteria": [
{
"name": "Outcome 1: Develop the high-level support scheme design",
"type": "quality",
"description": "17.5"
},
{
"name": "Outcome 2: Modelling",
"type": "quality",
"description": "11.2"
},
{
"name": "Outcome 3 Financial Impact Assessment",
"type": "quality",
"description": "11.2"
},
{
"name": "Key Personnel Experience",
"type": "quality",
"description": "11.2"
},
{
"name": "Contract Management",
"type": "quality",
"description": "8.4"
},
{
"name": "Social Value: Supporting Health & Wellbeing",
"type": "quality",
"description": "10.5"
},
{
"name": "Total Contract Price",
"type": "cost",
"description": "30"
}
]
},
"contractPeriod": {
"durationInDays": 360
},
"submissionTerms": {
"variantPolicy": "notAllowed"
}
}
],
"items": [
{
"id": "1",
"relatedLot": "1",
"deliveryAddresses": [
{
"region": "UKN"
}
],
"additionalClassifications": [
{
"id": "73220000",
"scheme": "CPV",
"description": "Development consultancy services"
},
{
"id": "73210000",
"scheme": "CPV",
"description": "Research consultancy services"
}
]
}
],
"title": "DfE - Renewable Electricity Team - Renewable Electricity Support Scheme Design",
"value": {
"amount": 200000,
"currency": "GBP"
},
"status": "active",
"coveredBy": [
"GPA"
],
"procedure": {
"isAccelerated": true,
"acceleratedRationale": "The Accelerated Open Procedure has been chosen as there is an urgent requirement for the service to be set up. The Executive’s new Energy Strategy - Path to Net Zero Energy was published in December 2021, followed by the Energy Strategy Action Plan in March 2023. Action point 7 of the plan commits the Department for the Economy to publishing the final design of renewable electricity support by the end of the year, In order to meet the target set by the 2023 Energy Strategy Action Plan the Renewable Electricity Team requires urgent consultancy support to be completed by December 2023 at the latest."
},
"bidOpening": {
"date": "2023-09-27T15:30:00+01:00"
},
"legalBasis": {
"id": "32014L0024",
"scheme": "CELEX"
},
"awardPeriod": {
"startDate": "2023-09-27T15:30:00+01:00"
},
"description": "DfE - Renewable Electricity Team wishes to appoint a “Contractor” who will be responsible for delivering the three key outcomes set out in the specification in order to support DfE in meeting its Energy Strategy Climate Change Act (Northern Ireland) 2022 ambitions. The 3 outcomes include developing a high-level support scheme design, Conducting quantitative modelling exercises and a financial impact assessment. It is anticipated this contract will commence early October 2023 and initially run for 12 months. The Accelerated Open Procedure has been chosen as there is an urgent requirement for the service to be set up. The Executive’s new Energy Strategy - Path to Net Zero Energy was published in December 2021, followed by the Energy Strategy Action Plan in March 2023. Action point 7 of the plan commits the Department for the Economy to publishing the final design of renewable electricity support by the end of the year, along with a pathway and timeline for the support being in place. Delivery of the support scheme design for Northern Ireland cannot occur without a solid evidence base to support policy decisions. There is therefore a need for timely and relevant expert advice in order to shape an incentive scheme to meet current and anticipated levels of demand in Northern Ireland in this new decade and beyond. In order to meet the target set by the 2023 Energy Strategy Action Plan the Renewable Electricity Team requires urgent consultancy support to be completed by early December 2023 at the latest.",
"tenderPeriod": {
"endDate": "2023-09-27T15:00:00+01:00"
},
"communication": {
"atypicalToolUrl": "https://etendersni.gov.uk/epps"
},
"contractTerms": {
"performanceTerms": "As detailed in the tender documents."
},
"hasRecurrence": false,
"reviewDetails": "CPD will comply with the Public Contracts Regulations 2015 (as amended). and, where appropriate, will incorporate a standstill period (i.e. a minimum of 10 calendar days) at the point information on the award. Of contract is communicated to tenderers. That notification will provide full information on the award decision. This provides time for the. Unsuccessful tenderers to challenge the award decision before the contract is entered into.",
"classification": {
"id": "73000000",
"scheme": "CPV",
"description": "Research and development services and related consultancy services"
},
"submissionTerms": {
"languages": [
"en"
],
"bidValidityPeriod": {
"endDate": "2023-12-26T23:59:59Z"
}
},
"submissionMethod": [
"electronicSubmission"
],
"procurementMethod": "open",
"selectionCriteria": {
"criteria": [
{
"type": "suitability",
"appliesTo": [
"supplier"
],
"description": "As detailed in the tender documents"
},
{
"type": "economic",
"appliesTo": [
"supplier"
],
"description": "As detailed in the tender documents"
},
{
"type": "technical",
"appliesTo": [
"supplier"
],
"description": "As detailed in the tender documents"
}
]
},
"mainProcurementCategory": "services",
"submissionMethodDetails": "https://etendersni.gov.uk/epps",
"procurementMethodDetails": "Open procedure"
},
"parties": [
{
"id": "GB-FTS-91925",
"name": "DfE: The Renewable Electricity Team RET",
"roles": [
"buyer",
"centralPurchasingBody"
],
"address": {
"region": "UK",
"locality": "BELFAST",
"postalCode": "BT2 8FD",
"countryName": "United Kingdom",
"streetAddress": "Adelaide House, 39-49 Adelaide Street"
},
"details": {
"url": "https://etendersni.gov.uk/epps",
"buyerProfile": "https://etendersni.gov.uk/epps",
"classifications": [
{
"id": "BODY_PUBLIC",
"scheme": "TED_CA_TYPE",
"description": "Body governed by public law"
},
{
"id": "01",
"scheme": "COFOG",
"description": "General public services"
}
]
},
"identifier": {
"legalName": "DfE: The Renewable Electricity Team RET"
},
"contactPoint": {
"url": "https://etendersni.gov.uk/epps",
"name": "SSDAdmin.CPDfinance-ni.gov.uk",
"email": "SSDAdmin@CPDfinance-ni.gov.uk"
}
},
{
"id": "GB-FTS-25435",
"name": "The UK does not have any such bodies with responsibility for appeal/mediation procedures. Instead; any challenges are dealt with by the High Court, Commercial Division, to which proceedings may be issued regarding alleged breaches of the PCR 2015 as amended",
"roles": [
"reviewBody"
],
"address": {
"locality": "Belfast",
"countryName": "United Kingdom"
},
"identifier": {
"legalName": "The UK does not have any such bodies with responsibility for appeal/mediation procedures. Instead; any challenges are dealt with by the High Court, Commercial Division, to which proceedings may be issued regarding alleged breaches of the PCR 2015 as amended"
}
}
],
"language": "en",
"description": "The successful contractor’s performance on the contract will be regularly monitored. Contractors not delivering.. On contract requirements is a serious matter. It means the public purse is not getting what it is paying for. If a contractor fails to reach.. Satisfactory levels of contract performance they will be given a specified time to improve. If, after the specified time, they still fail to reach.. Satisfactory levels of contract performance, the matter will be escalated to senior management in CPD for further action. If this occurs.. And their performance still does not improve to satisfactory levels within the specified period, it may be regarded as an act of grave.. Professional misconduct and they may be issued with a Certificate of Unsatisfactory Performance and the contract may be terminated.. The issue of a Certificate of Unsatisfactory Performance will result in the contractor being excluded from all procurement competitions.. Being undertaken by Centres of Procurement Expertise on behalf of bodies covered by the Northern Ireland Procurement Policy for a.. Period of twelve months from the date of issue of the certificate.",
"initiationType": "tender"
}