Find a Tender
unsuccessful
Official procurement procedure
Design, Supply, Refurbishment and Installation of Town Dock Torquay
Construction work for floating docks
Floating dock
Harbour construction works
+2 more
Published value
Not published
Submission deadline Not published
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: Torbay Council: "Design, Supply, Refurbishment and Installation of Town Dock Torquay". Published status: unsuccessful. Published value: Value not published. 1 published lot. Submission deadline not published. See the official notice for participation instructions.
| Contracting Authority | Torbay Council | Scope & Categories | Not published | Submission Window | unsuccessful No deadline published |
|---|---|---|---|---|---|
| Submission Gateway | Direct notice route | Legal Basis & Regime | Standard procurement | Estimated Value (exc. VAT) | Not published |
Bidder Intelligence · Authority Profile: Torbay Council
Market Analytics
Derived from OCDS awards & bid statistics
Published history for Torbay Council. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Competition Density
3.8Bids / Report
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate availablePayment Terms
Check noticePublished terms
Coverage: 41 active published awards; 32 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityTorbay Council | Procedure methodNot published | Procurement categoryNot published |
Statusunsuccessful | Framework / DPSNot published | CompetitionNot published |
Above thresholdNot published | Legal basisNot published | Tender period startsNot published |
Clarification deadlineNot published | Electronic submissionNot published | Submission languagesNot published |
Published14 Jul 2021, 17:09 BST | Last source update14 Jul 2021, 17:09 BST | Recurring procurementNot published |
ClassificationConstruction work for floating docks, Floating dock, Harbour construction works, Marina construction work, Yacht harbour construction work | ||
Delivery area | ||
OCIDocds-h6vhtk-02aec6 | ||
What is being bought
Six of the existing pontoons that form the wave screen for the marina need to be rubberised as the joints have become worn. This will require them to be removed from site for shot blasting and metal works. While they are off site a temporary wave screen will need to be put in place to protect the marina.
The access bridge to the marina also needs to be refurbished, this will also need to be taken off site for blasting and minor metal works. Temporary access will need to be put in place while the bridge is being refurbished.
The back walkway pontoon and three legs of the marina, along with all the mooring fingers need to be removed and replaced with new products. The existing utility supplies (water & power) will be swapped onto the new infrastructure. In order to keep the marina operational we anticipate the works to be phased over a maximum of three years.
What changed
From the official release history
- tender value changed
14 Jul 2021, 17:09 BST - Status changed to unsuccessful
14 Jul 2021, 17:09 BST - Official notice release published
14 Jul 2021, 17:09 BST - Submission deadline changed to published date
14 Jul 2021, 17:09 BST - Published value updated to £1,000,000
10 May 2021, 09:22 BST - Status changed to active
10 May 2021, 09:22 BST - Official notice release published
10 May 2021, 09:22 BST - Submission deadline changed to 18 Jun 2021, 12:00 BST
10 May 2021, 09:22 BST - Buyer information updated
10 May 2021, 09:22 BST
Lots and requirements (1)
Published by the contracting authority
- Lot 1 · #1Individual lot title not publishedcancelledPublished valueNot publishedSix of the existing pontoons that form the wave screen for the marina need to be rubberised as the joints have become worn. This will require them to be removed from site for shot blasting and metal works. While they are off site a temporary wave screen will need to be put in place to protect the marina. The access bridge to the marina also needs to be refurbished, this will also need to be taken off site for blasting and minor metal works. Temporary access will need to be put in place while the bridge is being refurbished. The back walkway pontoon and three legs of the marina, along with all the mooring fingers need to be removed and replaced with new products. The existing utility supplies (water & power) will be swapped onto the new infrastructure. In order to keep the marina operational we anticipate the works to be phased over a maximum of three years.Contract periodNot publishedEligibilityNot publishedOptions / renewalNot published
Timeline
- Procedure published
14 Jul 2021, 17:09 BST - Award unsuccessful
Not published · Not published
Commercial outcome and competition
Awards Awarded supplier not published Not published · Not published · unsuccessful |
ContractsNo contract published |
Bid statisticsNo aggregate bid statistics published |
Buyer and organisations in this procedure
Torbay Council
Contracting authority GB-FTS-398Documents (0)
Official links; attachments are not copied
No linked documents are published
Related procedures (0)
No related procedures published