Official UK procurement notice
Concrete Roads Programme - Lifecycle Extension Works Framework
Authority: Highways England
What is being bought3 lots · detail below
Published requirement descriptionA multi lot specialist supplier framework to deliver focussed renewals, to maximise the life of the existing concrete pavement.
CPV: Highway maintenance work · Road-repair works · Surface work for highways
Lots and requirements (3)Procurement structure
3 lots · no lot values published · same evaluation weights on every lotLot #1Joint RepairsAwarded
Scheduled joint repair works to concrete road surfaces.
The work includes:
— the replacement of old joint material between slabs with new jointing;
— it also covers small patches and thin bond repair to cover faults, such as small to medium punch outs, spalled edges, failed patches less than ½ a slab, linear inline repairs up to 600 mm wide, by 150 mm deep, repair/replacement of ironwork and surrounds, previously repaired stud holes, kerb edging;
— repairs will use both flexible and rigid repair materials. The aim with the rigid repairs will be to use concrete to concrete repairs where possible;
— high performance joints between different materials, such as transitions and bridge decks;
— re-installation of loops or magnetometers;
— introduction and/or widening of construction joints.
The Lifecycle Extension Works contractors will be expected to provide:
Construction of chosen intervention;
Principal Contractor duties;
Traffic management;
Welfare facilities;
Early contractor involvement into design phase;
Small works for localised planned repair.
Provides contingency for other lots should the suppliers in those Lots be unable to deliver the works.
Lot #2Bay Replacement and Slab LevellingAwarded
Scheduled bay replacement and slab levelling works on concrete roads.
The work includes:
— full slab removal and replacement with early strength rapid set concrete materials;
— ½ bay or greater full depth replacement;
— this allows for pre-formed and precast slabs to be used for rapid repaid;
— replacement of dowels between joints;
— removal of depressions or heaves;
— removal of previous significant asphalt repairs for replacement of concrete slabs;
— re-installation of loops or magnetometers;
— repair to stabilise ground conditions found under the base;
— repairs to transitions (concrete);
— introduction of additional reinforcement beneath, in slab;
Slab levelling between joints use vacuum grouting, grout injection or resin injection.
— stabilisation of the slab to raise it to improve longitudinal ride profile;
— stabilise transitions between different materials;
— stabilisation of areas adjacent to the mainline, such as laybys, entry and exit slips, embankments associated with the edge of the road.
The Lifecycle Extension Works contractors will be expected to provide:
Construction of chosen intervention;
Principal contractor duties;
Traffic management;
Welfare facilities;
Early contractor involvement into design phase;
Small works for localised planned repair.
Provides contingency for other lots should the suppliers in those Lots be unable to deliver the works.
Lot #3Surface TreatmentsAwarded
Scheduled surface treatment works on concrete roads.
The work includes:
— white topping,
— thin surface course over asphalt,
— deeper overlays in asphalt above 50 mm to a depth of 250 mm,
— surface re-texturing,
— longitudinal grinding,
— surface milling,
— repairs to transitions (asphalt),
— repair to high friction systems.
The Lifecycle Extension Works contractors will be expected to provide:
Construction of chosen intervention;
Principal contractor duties;
Traffic management;
Welfare facilities;
Early contractor involvement into design phase;
Small works for localised planned repair.
Provides contingency for other lots should the suppliers in those Lots be unable to deliver the works.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published sub-criteria (3)
- Quality: 60
- Price: 40
- price: 40
Published award criteria (3)
- Quality: 60%
- Price: 40%
- Price: 40%
- Price carries 80 of 140 points: a 10% discount moves about 8 points. This one is won on the number: sharpen the price before polishing the prose.
- “Concrete Roads Programme - Lifecycle Extension Works Framework” is a framework: the contest is a place on its panel, not a single contract.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record- Procedure method
- Restricted procedure
- Legal basis
- CELEX · 32014L0024 Public Contracts Regulations 2015 (Directive 2014/24/EU)
- Procurement category
- Works
- Notice status
- Awarded
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- Unspecified in notice
- First published
- 15 Apr 2021, 22:54 BST
- Last source update
- 15 Apr 2021, 22:54 BST
- FTS notice number
2021/S 000-007984- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-02a6a1Find a Tender
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast6 suppliers are admitted to this framework without individual award values or dates, see the supplier list below.
Contracts
Concrete Roads Programme — Lifecycle Extension Works Framework Lot 3 - Surface Treatments
- Signed
- 8 Mar 2021
- Value
- £5,040,000
- Status
- active
Concrete Roads Programme — Lifecycle Extension Works Framework Lot 1 - Joint Repairs
- Signed
- 4 Mar 2021
- Value
- £10,440,000
- Status
- active
Concrete Roads Programme — Lifecycle Extension Works Framework Lot 1 - Joint Repairs
- Signed
- 4 Mar 2021
- Value
- £6,960,000
- Status
- active
Concrete Roads Programme — Lifecycle Extension Works Framework Lot 2 - Bay Replacement and Slab Levelling
- Signed
- 4 Mar 2021
- Value
- £22,320,000
- Status
- active
Concrete Roads Programme — Lifecycle Extension Works Framework Lot 2 - Bay Replacement and Slab Levelling
- Signed
- 4 Mar 2021
- Value
- £14,880,000
- Status
- active
Concrete Roads Programme — Lifecycle Extension Works Framework Lot 3 - Surface Treatments
- Signed
- 4 Mar 2021
- Value
- £7,560,000
- Status
- active
Bid statistics published by the authority
| Lot | Bids | SME | VCSE | Valid bid range |
|---|---|---|---|---|
| 1 · Joint Repairs | 6bids | — | — | — |
| 2 · Bay Replacement and Slab Levelling | 5bids | — | — | — |
| 3 · Surface Treatments | 4bids | — | — | — |
Contracting authority & participating public bodies
Framework contractors & participating bidders
4 commercial parties on the notice- Colas LtdFramework contractor
- Dyer & Butler LtdFramework contractor
- Tarmac Trading LtdFramework contractor
- Volkerfitzpatrick LtdFramework contractor
Official documents & specifications
Official links; attachments are not copiedNo document links were published on the notice.