Find a Tender
complete
Official procurement procedure
Campbeltown Flood Protection Scheme Works
Flood-prevention works
River regulation and flood control works
Published value
Not published
Submission deadline Not published
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: Argyll and Bute Council: "Campbeltown Flood Protection Scheme Works". Published status: complete. Published value: Value not published. 1 published lot. Submission deadline not published. See the official notice for participation instructions.
| Contracting Authority | Argyll and Bute Council | Scope & Categories | Not published | Submission Window | complete No deadline published |
|---|---|---|---|---|---|
| Submission Gateway | Direct notice route | Legal Basis & Regime | Standard procurement | Estimated Value (exc. VAT) | Not published |
Bidder Intelligence · Authority Profile: Argyll and Bute Council
Market Analytics
Derived from OCDS awards & bid statistics
Published history for Argyll and Bute Council. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Competition Density
3.7Bids / Report
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate availablePayment Terms
Check noticePublished terms
Coverage: 125 active published awards; 125 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityArgyll and Bute Council | Procedure methodNot published | Procurement categoryNot published |
Statuscomplete | Framework / DPSNot published | CompetitionNot published |
Above thresholdNot published | Legal basisNot published | Tender period startsNot published |
Clarification deadlineNot published | Electronic submissionNot published | Submission languagesNot published |
Published7 Jun 2022, 14:36 BST | Last source update7 Jun 2022, 14:36 BST | Recurring procurementNot published |
ClassificationFlood-prevention works, River regulation and flood control works | ||
Delivery area | ||
OCIDocds-h6vhtk-02a32f | ||
What is being bought
Argyll and Bute Councils’ aims and objectives for the Campbeltown Flood Protection Scheme Works are to:
- Reduce the risk of river flooding in Campbeltown
- Reduce the risk of surface water flooding in Campbeltown
The scope of the contract is:
- Millknowe Flood Storage Reservoir – Construction of an impounding structure across the river and floodplain, flow control culvert and spillway. Sheet pile flood walls will form part of the storage area to protect the industrial estate.
- Dalaruan Culvert Upgrade – Partial upgrade to increase capacity for the Millknowe and Balegreggan Burns. Upsize a 270m length from the Millknowe intake. Pipe diameters will be increased to between 675 – 1200mm.
- Surface Water Elements – Retrofit of Sustainable Urban Drainage Systems, within urban setting, to reduce load on the combined drainage network. Providing new drainage lines for existing road drains to disconnect from the combined network. Two detention basins and two filter drains are to be provided in above ground storage in the Meadows and below ground tank type storage at Burnside car park.
What changed
From the official release history
- Status changed to complete
7 Jun 2022, 14:36 BST - Official notice release published
7 Jun 2022, 14:36 BST - Submission deadline changed to published date
7 Jun 2022, 14:36 BST - Status changed to active
7 Apr 2021, 13:40 BST - Official notice release published
7 Apr 2021, 13:40 BST - Submission deadline changed to 10 May 2021, 12:00 BST
7 Apr 2021, 13:40 BST - Buyer information updated
7 Apr 2021, 13:40 BST
Lots and requirements (1)
Published by the contracting authority
- Lot 1 · #1Individual lot title not publishedcancelledPublished valueNot publishedScope of the Contract: - Millknowe Flood Storage Reservoir – Construction of an impounding structure across the river and floodplain, flow control culvert and spillway. Sheet pile flood walls will form part of the storage area to protect the industrial estate. - Dalaruan Culvert Upgrade – Partial upgrade to increase capacity for the Millknowe and Balegreggan Burns. Upsize a 270m length from the Millknowe intake. Pipe diameters will be increased to between 675 – 1200mm. - Surface Water Elements – Retrofit of Sustainable Urban Drainage Systems, within urban setting, to reduce load on the combined drainage network. Providing new drainage lines for existing road drains to disconnect from the combined network. Two detention basins and two filter drains are to be provided in above ground storage in the Meadows and below ground tank type storage at Burnside car park.Contract periodNot publishedEligibilityNot publishedOptions / renewalNot published
Timeline
- Procedure published
7 Jun 2022, 14:36 BST - Award active
Not published · Not published - Contract active
Signed 27 May 2022, 00:00 BST · £12,693,797
Commercial outcome and competition
Awards DAWSON-WAM Not published · Not published · active |
Contracts Contract £12,693,797 · signed 27 May 2022, 00:00 BST · active |
Bid statistics bids: 2 (lot 1) electronicBids: 2 (lot 1) foreignBidsFromEU: 0 (lot 1) foreignBidsFromNonEU: 2 (lot 1) smeBids: 2 (lot 1) |
Buyer and organisations in this procedure
Argyll and Bute Council
Contracting authority GB-FTS-3190Documents (0)
Official links; attachments are not copied
No linked documents are published
Related procedures (0)
No related procedures published