Burnwood Community School Kitchen extension

Buyer: STOKE-ON-TRENT CITY COUNCIL →

BuyerSTOKE-ON-TRENT CITY COUNCIL
Statusplanned
DeadlineNot published
Value£450,000
Published30 Jul 2024

What is being bought

Stoke-on-Trent City Council has allocated funding for a kitchen extension at Burnwood Community School. The current kitchen is approximately 92 sqm in size and an extension is required to cater for increased intake. The Council intends to utilise a 2-stage Design and Build contract for this project. As such, the Council will be looking to appoint a contractor to undertake a Pre-Construction Services Agreement (PCSA). The contractor will be required to undertake all design work required to complete RIBA stages up to and including RIBA stage 4, with an approval process at the end of each RIBA stage. The City Council has allocated a total budget of £450,000 for the kitchen extension. This budget is to include all costs including the PCSA fee, any other fees, surveys or direct costs, construction and fit out. The deadline for the completion of the kitchen extension is the end of August 2025, in order that the kitchen is operational for the start of the school year in September 2025. This allows 6 weeks for construction during the school summer holidays, which is the preferred construction period. If construction is anticipated to take longer than 6 weeks, consideration will need to be given to the impact on the school's operation and meal provision during the term-time period.

Delivery location

UK

Categories

Construction work for school buildings 45214200Primary school construction work 45214210Secondary school construction work 45214220Construction work for college buildings 45214300Construction work 45000000

Lot details

Lot 1

Stoke-on-Trent City Council has allocated funding for a kitchen extension at Burnwood Community School. The current kitchen is approximately 92 sqm in size and an extension is required to cater for increased intake. There is currently a staff WC and changing room within the kitchen area which would need to be retained but could be re-located. There is also a boiler room, electricity cupboard and food store which again would need to be retained but could be re-located. The extension design is expected to comply with BB103 The successful consultant will be invited to an inception meeting at the school and further client engagement meetings as required with the school leadership to discuss the issues and requirements in more detail. The Council intends to utilise a 2-stage Design and Build contract for this project. As such, the Council will be looking to appoint a contractor to undertake a Pre-Construction Services Agreement (PCSA). The contractor will be required to undertake all design work required to complete RIBA stages up to and including RIBA stage 4, with an approval process at the end of each RIBA stage. The contractor will need to provide services in a number of fields including architectural design, mechanical, electrical, structural and civil engineering, building surveying, quantity surveying, and project management. Cost management and quantity surveying services will be required to ensure that the design that is being developed can be delivered for the allocated budget. These services can be provided either in-house or through sub-contracted specialists. The successful contractor will have and be able to demonstrate expert knowledge and recent experience of working with educational buildings. The City Council has allocated a total budget of £450,000 for the kitchen extension. This budget is to include all costs including the PCSA fee, any other fees, surveys or direct costs, construction and fit out. The deadline for the completion of the kitchen extension is the end of August 2025, in order that the kitchen is operational for the start of the school year in September 2025. This allows 6 weeks for construction during the school summer holidays, which is the preferred construction period. If construction is anticipated to take longer than 6 weeks, consideration will need to be given to the impact on the school's operation and meal provision during the term-time period. The contractor will be required to provide a construction programme and logistics plan for the construction period. At the end of the PCSA period, the contractor will provide their Contractors Proposals and the contract sum for the construction. The consultant will need to attend an inception meeting on site, and meetings to present the work to date at the end of each RIBA stage, with progress meetings throughout the work period arranged as necessary. These may be able to take the form of virtual meetings if appropriate.

Statusplanned

What is included

ItemCategoryQuantity
1Construction work for school buildings, Primary school construction work, Secondary school construction work, Construction work for college buildingsNot published

Comparable-procurement analytics

Benchmarked against retained Find a Tender procedures with CPV division 45. The category anchor is Construction work for school buildings (45214200); this is a deliberately broad market comparator. The comparison is shown at several levels rather than pretending one company or region is always the best benchmark.

Comparison setProceduresReported bids per procedureNamed award suppliersPrice evidence
Market: CPV division 4517,1274 median · 30.2 average (5,652 of 17,127 with a bid count)3.8 average (6,245 of 17,127 with named award suppliers)Not published
Same buyer4Not publishedNot publishedNot published
Delivery region: UK2,3826 median · 82.9 average (838 of 2,382 with a bid count)7.3 average (931 of 2,382 with named award suppliers)Not published
Similar published value (0.5×–2×)1,1184 median · 6 average (6 of 1,118 with a bid count)1.5 average (6 of 1,118 with named award suppliers)Not published

“Reported bids” is an official aggregate, sometimes reported per lot; it is the closest available competition measure. “Named award suppliers” are winners, not all applicants.

Price-outcome signal

Not enough comparable procedures currently publish both a GBP tender value and a usable lowest-valid-bid value to calculate a responsible price-reduction benchmark. Tenderline deliberately does not infer a saving from named award suppliers or from missing award values.

Procurement strategy & market signals

Framework agreementNot published
Dynamic purchasing systemNot published
Competitive procurementNot published
Recurring requirementNot published
Procurement method rationaleNot published
Rationale classificationsNot published
Special regimeNot published
Covered byGPA
Submission policyNot published
Selection criteriaNot published
Risk detailsNot published

Planning & early market engagement

BudgetNot published
No-engagement rationaleNot published
Planning documents0
Planning milestones0

No planning milestones published.

Related procurements

No linked framework, prior procurement or reprocurement published.

Documents & submission route

No documents are published in the current source record.

Source data inventory

Diagnostic view. “Not published” means this current release does not provide a value.

OCIDocds-h6vhtk-0485df
Latest release ID023741-2024
Latest release timestampTue Jul 30 2024 10:02:41 GMT+0000 (Coordinated Universal Time)
Sourcefind-a-tender
Official notice URLNot published
Tender statusplanned
Procurement methodNot published
Procurement method detailsNot published
Main procurement categoryworks
Above thresholdNot published
Legal basis32014L0024
Tender period: startNot published
Tender period: endNot published
Expression of interest deadlineNot published
Enquiry deadlineNot published
Award period: startNot published
Award period: endNot published
Submission method detailsNot published
Submission languagesNot published
Electronic catalogue policyNot published
Total tender value£450,000
Tender lots in source1
Tender items in source1
Tender documents in source0
Awards in latest release0
Contracts in latest release0
Parties in latest release1

Notice history

DateEventReference
30 Jul 2024planning023741-2024

All source data

Unmodified official OCDS data retained by Tenderline for this procurement process.

Complete current OCDS release JSON
{
  "id": "023741-2024",
  "tag": [
    "planning"
  ],
  "date": "2024-07-30T11:02:41+01:00",
  "ocid": "ocds-h6vhtk-0485df",
  "buyer": {
    "id": "GB-FTS-114488",
    "name": "STOKE-ON-TRENT CITY COUNCIL"
  },
  "tender": {
    "id": "ocds-h6vhtk-0485df",
    "lots": [
      {
        "id": "1",
        "status": "planned",
        "description": "Stoke-on-Trent City Council has allocated funding for a kitchen extension at Burnwood Community School. The current kitchen is approximately 92 sqm in size and an extension is required to cater for increased intake. \nThere is currently a staff WC and changing room within the kitchen area which would need to be retained but could be re-located. There is also a boiler room, electricity cupboard and food store which again would need to be retained but could be re-located. The extension design is expected to comply with BB103\nThe successful consultant will be invited to an inception meeting at the school and further client engagement meetings as required with the school leadership to discuss the issues and requirements in more detail.\nThe Council intends to utilise a 2-stage Design and Build contract for this project.  As such, the Council will be looking to appoint a contractor to undertake a Pre-Construction Services Agreement (PCSA).  The contractor will be required to undertake all design work required to complete RIBA stages up to and including RIBA stage 4, with an approval process at the end of each RIBA stage.\nThe contractor will need to provide services in a number of fields including architectural design, mechanical, electrical, structural and civil engineering, building surveying, quantity surveying, and project management.  Cost management and quantity surveying services will be required to ensure that the design that is being developed can be delivered for the allocated budget.   These services can be provided either in-house or through sub-contracted specialists.  The successful contractor will have and be able to demonstrate expert knowledge and recent experience of working with educational buildings. \nThe City Council has allocated a total budget of £450,000 for the kitchen extension.  This budget is to include all costs including the PCSA fee, any other fees, surveys or direct costs, construction and fit out.\nThe deadline for the completion of the kitchen extension is the end of August 2025, in order that the kitchen is operational for the start of the school year in September 2025.  This allows 6 weeks for construction during the school summer holidays, which is the preferred construction period.  If construction is anticipated to take longer than 6 weeks, consideration will need to be given to the impact on the school's operation and meal provision during the term-time period. The contractor will be required to provide a construction programme and logistics plan for the construction period.  \nAt the end of the PCSA period, the contractor will provide their Contractors Proposals and the contract sum for the construction. \nThe consultant will need to attend an inception meeting on site, and meetings to present the work to date at the end of each RIBA stage, with progress meetings throughout the work period arranged as necessary.  These may be able to take the form of virtual meetings if appropriate."
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UK"
          }
        ],
        "additionalClassifications": [
          {
            "id": "45214200",
            "scheme": "CPV",
            "description": "Construction work for school buildings"
          },
          {
            "id": "45214210",
            "scheme": "CPV",
            "description": "Primary school construction work"
          },
          {
            "id": "45214220",
            "scheme": "CPV",
            "description": "Secondary school construction work"
          },
          {
            "id": "45214300",
            "scheme": "CPV",
            "description": "Construction work for college buildings"
          }
        ]
      }
    ],
    "title": "Burnwood Community School  Kitchen extension",
    "value": {
      "amount": 450000,
      "currency": "GBP"
    },
    "status": "planned",
    "coveredBy": [
      "GPA"
    ],
    "legalBasis": {
      "id": "32014L0024",
      "scheme": "CELEX"
    },
    "description": "Stoke-on-Trent City Council has allocated funding for a kitchen extension at Burnwood Community School. The current kitchen is approximately 92 sqm in size and an extension is required to cater for increased intake. \nThe Council intends to utilise a 2-stage Design and Build contract for this project.  As such, the Council will be looking to appoint a contractor to undertake a Pre-Construction Services Agreement (PCSA).  The contractor will be required to undertake all design work required to complete RIBA stages up to and including RIBA stage 4, with an approval process at the end of each RIBA stage.\nThe City Council has allocated a total budget of £450,000 for the kitchen extension.  This budget is to include all costs including the PCSA fee, any other fees, surveys or direct costs, construction and fit out.\nThe deadline for the completion of the kitchen extension is the end of August 2025, in order that the kitchen is operational for the start of the school year in September 2025.  This allows 6 weeks for construction during the school summer holidays, which is the preferred construction period.  If construction is anticipated to take longer than 6 weeks, consideration will need to be given to the impact on the school's operation and meal provision during the term-time period.",
    "communication": {
      "futureNoticeDate": "2024-09-20T00:00:00+01:00"
    },
    "classification": {
      "id": "45000000",
      "scheme": "CPV",
      "description": "Construction work"
    },
    "mainProcurementCategory": "works"
  },
  "parties": [
    {
      "id": "GB-FTS-114488",
      "name": "STOKE-ON-TRENT CITY COUNCIL",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UKG23",
        "locality": "STOKE-ON-TRENT",
        "postalCode": "ST41HH",
        "countryName": "United Kingdom",
        "streetAddress": "Civic Centre,Glebe Street"
      },
      "details": {
        "url": "https://www.stoke.gov.uk/",
        "classifications": [
          {
            "id": "REGIONAL_AUTHORITY",
            "scheme": "TED_CA_TYPE",
            "description": "Regional or local authority"
          },
          {
            "id": "01",
            "scheme": "COFOG",
            "description": "General public services"
          }
        ]
      },
      "identifier": {
        "legalName": "STOKE-ON-TRENT CITY COUNCIL",
        "noIdentifierRationale": "notOnAnyRegister"
      },
      "contactPoint": {
        "name": "william stuart",
        "email": "william.stuart@stoke.gov.uk",
        "telephone": "+44 7913354238"
      }
    }
  ],
  "language": "en",
  "initiationType": "tender"
}
Complete JSON history (1 releases)
30 Jul 2024 · 023741-2024 · planning
{
  "id": "023741-2024",
  "tag": [
    "planning"
  ],
  "date": "2024-07-30T11:02:41+01:00",
  "ocid": "ocds-h6vhtk-0485df",
  "buyer": {
    "id": "GB-FTS-114488",
    "name": "STOKE-ON-TRENT CITY COUNCIL"
  },
  "tender": {
    "id": "ocds-h6vhtk-0485df",
    "lots": [
      {
        "id": "1",
        "status": "planned",
        "description": "Stoke-on-Trent City Council has allocated funding for a kitchen extension at Burnwood Community School. The current kitchen is approximately 92 sqm in size and an extension is required to cater for increased intake. \nThere is currently a staff WC and changing room within the kitchen area which would need to be retained but could be re-located. There is also a boiler room, electricity cupboard and food store which again would need to be retained but could be re-located. The extension design is expected to comply with BB103\nThe successful consultant will be invited to an inception meeting at the school and further client engagement meetings as required with the school leadership to discuss the issues and requirements in more detail.\nThe Council intends to utilise a 2-stage Design and Build contract for this project.  As such, the Council will be looking to appoint a contractor to undertake a Pre-Construction Services Agreement (PCSA).  The contractor will be required to undertake all design work required to complete RIBA stages up to and including RIBA stage 4, with an approval process at the end of each RIBA stage.\nThe contractor will need to provide services in a number of fields including architectural design, mechanical, electrical, structural and civil engineering, building surveying, quantity surveying, and project management.  Cost management and quantity surveying services will be required to ensure that the design that is being developed can be delivered for the allocated budget.   These services can be provided either in-house or through sub-contracted specialists.  The successful contractor will have and be able to demonstrate expert knowledge and recent experience of working with educational buildings. \nThe City Council has allocated a total budget of £450,000 for the kitchen extension.  This budget is to include all costs including the PCSA fee, any other fees, surveys or direct costs, construction and fit out.\nThe deadline for the completion of the kitchen extension is the end of August 2025, in order that the kitchen is operational for the start of the school year in September 2025.  This allows 6 weeks for construction during the school summer holidays, which is the preferred construction period.  If construction is anticipated to take longer than 6 weeks, consideration will need to be given to the impact on the school's operation and meal provision during the term-time period. The contractor will be required to provide a construction programme and logistics plan for the construction period.  \nAt the end of the PCSA period, the contractor will provide their Contractors Proposals and the contract sum for the construction. \nThe consultant will need to attend an inception meeting on site, and meetings to present the work to date at the end of each RIBA stage, with progress meetings throughout the work period arranged as necessary.  These may be able to take the form of virtual meetings if appropriate."
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UK"
          }
        ],
        "additionalClassifications": [
          {
            "id": "45214200",
            "scheme": "CPV",
            "description": "Construction work for school buildings"
          },
          {
            "id": "45214210",
            "scheme": "CPV",
            "description": "Primary school construction work"
          },
          {
            "id": "45214220",
            "scheme": "CPV",
            "description": "Secondary school construction work"
          },
          {
            "id": "45214300",
            "scheme": "CPV",
            "description": "Construction work for college buildings"
          }
        ]
      }
    ],
    "title": "Burnwood Community School  Kitchen extension",
    "value": {
      "amount": 450000,
      "currency": "GBP"
    },
    "status": "planned",
    "coveredBy": [
      "GPA"
    ],
    "legalBasis": {
      "id": "32014L0024",
      "scheme": "CELEX"
    },
    "description": "Stoke-on-Trent City Council has allocated funding for a kitchen extension at Burnwood Community School. The current kitchen is approximately 92 sqm in size and an extension is required to cater for increased intake. \nThe Council intends to utilise a 2-stage Design and Build contract for this project.  As such, the Council will be looking to appoint a contractor to undertake a Pre-Construction Services Agreement (PCSA).  The contractor will be required to undertake all design work required to complete RIBA stages up to and including RIBA stage 4, with an approval process at the end of each RIBA stage.\nThe City Council has allocated a total budget of £450,000 for the kitchen extension.  This budget is to include all costs including the PCSA fee, any other fees, surveys or direct costs, construction and fit out.\nThe deadline for the completion of the kitchen extension is the end of August 2025, in order that the kitchen is operational for the start of the school year in September 2025.  This allows 6 weeks for construction during the school summer holidays, which is the preferred construction period.  If construction is anticipated to take longer than 6 weeks, consideration will need to be given to the impact on the school's operation and meal provision during the term-time period.",
    "communication": {
      "futureNoticeDate": "2024-09-20T00:00:00+01:00"
    },
    "classification": {
      "id": "45000000",
      "scheme": "CPV",
      "description": "Construction work"
    },
    "mainProcurementCategory": "works"
  },
  "parties": [
    {
      "id": "GB-FTS-114488",
      "name": "STOKE-ON-TRENT CITY COUNCIL",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UKG23",
        "locality": "STOKE-ON-TRENT",
        "postalCode": "ST41HH",
        "countryName": "United Kingdom",
        "streetAddress": "Civic Centre,Glebe Street"
      },
      "details": {
        "url": "https://www.stoke.gov.uk/",
        "classifications": [
          {
            "id": "REGIONAL_AUTHORITY",
            "scheme": "TED_CA_TYPE",
            "description": "Regional or local authority"
          },
          {
            "id": "01",
            "scheme": "COFOG",
            "description": "General public services"
          }
        ]
      },
      "identifier": {
        "legalName": "STOKE-ON-TRENT CITY COUNCIL",
        "noIdentifierRationale": "notOnAnyRegister"
      },
      "contactPoint": {
        "name": "william stuart",
        "email": "william.stuart@stoke.gov.uk",
        "telephone": "+44 7913354238"
      }
    }
  ],
  "language": "en",
  "initiationType": "tender"
}