B39 ELga Mill machine maintenance / repairs DAR
Authority: Sellafield Limited (Public body)
What is being bought
Published requirement descriptionScope of the work includes: The contract will provide for 4 scheduled service visits a year, 3 quarterly, short, services and 1 annual, long, service as stipulated in 918-7120-0425s. This will also cover Q6855-0425s 12 Month Service and Preventive Maintenance Schedule- Any parts or faults for the above quoted separately. Q6844-0125s-Lifting of rotary table, Install Encoder, inspect Hydraulics leaks cause, Replacement of Clamp seals Q6857-0425s-Supply of Replacement Rotary Table Clamps Power pack. Q6846-0125s-New Vertical covers – Supply for Fitting with Ballscrew. Q6853-0425s-Stand-alone Guard interlock system. Q6859-0425s-Replacement of Perimeter hinged flask loading guard with internal Sliding interlocked guard. Q6860-0425s-Gate Access to floor plate. Q6861-0425s-Channel around the floor plates Q6856-0425s - X Axis Backlash Eliminator rebuild. Q6858-0425s -New Coolant system and Splash collection
The lotProcurement structure
single lot · no lot value publishedLot #1Awarded
Procedure terms & legal framework
From the official record- Procedure method
- Direct award
- Legal basis
- UKPGA · 2023/54 Procurement Act 2023
- Notice status
- Awarded without competition
- Procurement threshold
- Unspecified in notice
- Regulatory regime
- Standard
- Commercial structure
- Stand-alone contract (no framework)
- Competition type
- Direct award (no call for competition)
- GPA / WTO covered
- Unspecified in notice
- Recurring procurement
- Unspecified in notice
- First published
- 18 Jun 2025, 09:00 BST
- Last source update
- 18 Jun 2025, 09:00 BST
- FTS notice number
2025/S 000-033127- Latest notice
- Transparency notice (UK5)
- Delivery area
- Not published
- Official registry OCID
ocds-h6vhtk-054eb5Find a Tender
- Why no open competition
- Single Suppliers Technical Reasons; Additional Repeat Further Following Competitive Procedure
- Published justification
WithTo allow a direct award to Seymour Engineering for a continued Maintenance and repair of a milling machine that is a crucial machine to support the maintenance of Nuclear fuel flasks as stated in the Seymour quotes for this work. The B39 facility require this machine to be available for use at all times for machining operations that any of the fleet of fuel flasks may require in their maintenance process. The flasks have to be maintained within time periods stated within the licensing certification as directed by the regulator for the use of transporting Nuclear fuel to and from power stations within the UK. Seymour Engineering have in the past years been recognised by all B39 Management as the experts of this machine. An SL project around 15 years ago engaged the services of Seymour to extensively refurbish and modify by fitting a Heidenhein aid system for more accurate measurement of the machining process on this Milling Machine. This machine is a complexed and unique machine as recognised over the years with no other companies recognised to take on the maintence as with the added problem of it now being dated and sufferring obsolecense especially around the supply or repair of spare parts where Seymours have so far proven to be strong in this crucial area.Justification for the uplift is for Seymours to supply and deliver 2 x accumlators for the Elgamill to allow the machine to be fully operational which is crucial to the plant and flask maintenance programmes. This is for the annual service of the B39 Elgamill. The contract will provide for 4 scheduled service visits a year, 3 quarterly, short, services and 1 annual, long, service. This requirement has been outlined in Sellafield document SLF 1.08.08.01 (Issue 2). The aim is to carry out work at frequent intervals in smaller time frames, providing for the full annual service requirement whilst also providing the ability to impose a Total Preventative Maintenance (TPM) regime for the machine.
- Risks
none
Notice history
2 events · 1 release on Find a Tender · since 18 Jun 2025- Transparency notice published18 Jun 2025, 09:00 BSTUK5
- Contract signature expected30 Jun 2025, 23:59 BSTscheduled
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| supplier not published1 Jul 2025 – 31 Mar 2026 | £500,000 | — | Standstill |
Contracting authority & participating public bodies
Official documents & specifications (1)
Official links; attachments are not copiedNotices published for this procedure
- Transparency notice Transparency notice on Find a Tender