TenderlineUK
Procurement Intelligence
Official OCDS
Find a Tender
complete
Official procurement procedure

Asset Delivery (AD) South West - Maintenance & Response Contract (MRC)

Construction work for highways
Electrical installation work
Engineering services
+3 more
UK
Published value
Not published
Submission deadline Not published
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: National Highways: "Asset Delivery (AD) South West - Maintenance & Response Contract (MRC)". Published status: complete. Published value: Value not published. 1 published lot. Submission deadline not published. See the official notice for participation instructions.
Contracting AuthorityNational HighwaysScope & CategoriesNot publishedSubmission Window
complete
No deadline published
Submission GatewayDirect notice routeLegal Basis & RegimeStandard procurementEstimated Value (exc. VAT)Not published
Bidder Intelligence · Authority Profile: National Highways
Market Analytics
View Authority Profile →
Derived from OCDS awards & bid statistics
Published history for National Highways. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Requires at least 5 comparable procedures
Competition Density
1Bids / Report
100% of reports have one bid
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate available
Payment Terms
Check noticePublished terms
Payment obligations depend on the applicable regime and contract. Consult the official documents.
Coverage: 10 active published awards; 1 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityNational Highways
Procedure methodNot published
Procurement categoryNot published
Statuscomplete
Framework / DPSNot published
CompetitionNot published
Above thresholdNot published
Legal basisNot published
Tender period startsNot published
Clarification deadlineNot published
Electronic submissionNot published
Submission languagesNot published
Published12 Aug 2025, 10:00 BST
Last source update12 Aug 2025, 10:00 BST
Recurring procurementNot published
ClassificationConstruction work for highways, Electrical installation work, Engineering services, Highway maintenance work, Road-maintenance works, Surface work for highways
Delivery area
UK
OCIDocds-h6vhtk-0585af
What is being bought
This VEAT Notice relates to a Deed of Variation to a National Highways' Maintenance and Response Contract. This Contract currently provides and undertakes all cyclical and reactive maintenance, incident response, defect rectification and severe weather delivery on the trunk roads and motorways within Somerset, North Somerset, South Gloucestershire, Bath & North East Somerset, Gloucestershire, Devon, Cornwall, Wiltshire, Western Dorset, Plymouth City and Bristol City (National Highways Area 1&2) (the "Contract”). Duties also include maintenance of roadside technology, the provision of traffic management for the contractor, maintenance and incident response activities, and traffic management for others who may be working on the network. The variation will add two sections of road into the Contract covering the A417/419 and the A30/35 which are currently maintained under Design Build Finance & Operate ("DBFO") contracts due to expire on 31 March 2026 and 30 September 2026. Consequently the total value of the Contract will increase by approximately 50%. It will extend the Contract which will have a new end date of 12th June 2028 instead of 30th June 2027 in order to align with the procurement process for the next Maintenance & Response contracts.
What changed
From the official release history
  1. Status changed to complete
    12 Aug 2025, 10:00 BST
  2. Official notice release published
    12 Aug 2025, 10:00 BST
  3. Buyer information updated
    12 Aug 2025, 10:00 BST
Lots and requirements (1)
Published by the contracting authority
  • Lot 1 · #1
    Individual lot title not published
    Status not published
    Published valueNot published
    The Design Build Finance Operate (DBFO) contract covers A417/419 and expires on 31st March 2026 and A30/35 expires on 30th September 2026. National Highways therefore must appoint an alternative maintenance contractor and it considers that the scope of these works is already included within this existing Maintenance and Response Contract. Therefore these roads will be incorporated into the existing Maintenance and Response (M&R) Contract for Area 1&2 of the Strategic Road Network following the award of the Deed of Variation. This together with the need for national alignment of the M&R contracts, ready for their next iteration, means that the term of the Area 1&2 M&R Contract will be extended and will have a new end date of 12th June 2028 instead of 30th June 2027. These changes will increase the awarded value from £ 269,610,482 to £ 405,510,000.
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
Timeline
  1. Procedure published
    12 Aug 2025, 10:00 BST
  2. Award active
    Not published · Not published
  3. Contract active
    Signed 26 Jul 2017, 00:00 BST · £405,510,000
Commercial outcome and competition
Awards
Ringway Infrastructure Services Limited
Not published · Not published · active
Contracts
Contract
£405,510,000 · signed 26 Jul 2017, 00:00 BST · active
Bid statisticsNo aggregate bid statistics published
Buyer and organisations in this procedure

National Highways

Contracting authority GB-FTS-139911
View buyer profile
  • National Highways
    buyer
    reviewBody

    Bridge House, Walnut Tree Close, Guildford, UK, GU1 4LZ
    +44 03001235000
  • Ringway Infrastructure Services Limited
    supplier

    Albion House, Springfield Road,, Horsham, UK, RH12 2RW
Documents (0)
Official links; attachments are not copied
No data
No linked documents are published
Related procedures (0)
No data
No related procedures published
Planning and rationale
Planning budgetNot published
No-engagement rationaleNot published
Procedure rationaleThe modifications to the Contract fall within the permissible grounds set out under Regulation 72(1)(e) of the Public Contracts Regulations 2015 in that the modifications are not substantial within the meaning of Regulation 72(8) of the Public Contracts Regulations 2015 because: The inclusion of Design Build Finance and Operate (DBFO) roads into the Contract and the extension of term does not render the Contract materially different compared to when it was originally procured. The type of work originally required of the Contract (i.e. maintenance and response) is the same as that which it will carry out on the previous DBFO stretches of the Strategic Road Network, it is just a case that the total lane coverage to be maintained under the Contract increases. The extension of term is to align all M&R Contracts to enable an efficient and consistent re-procurement of the programme. Adding the additional roads and the extension of term would not have changed the outcome of the original procurement in any way. The Contract will be fully operated in accordance with their current terms and pricing so scores would not have differed and any successful operator would be offered the extension to ensure alignment with the wider M&R procurement programme; As the current Contract will be operated for the new roads on the same terms and pricing, this does not alter the economic balance of the Contract in favour of the contractor. The additional works during the extended term will be on the same pricing; The change does not considerably alter the scope of the Contract as the works and services provided will remain unchanged and the roads have been included in this Contract because they are adjacent in terms of geographical scope also. This is not a change in contractor. The Deed of Variation ensures continuity of service on the Strategic Road Network and aligns with National Highways' wider asset delivery and procurement strategy, thereby safeguarding public value and network integrity. The Contract is being extended to better align with the re-procurement strategy for all Maintenance & Response contracts. It would provide significant technical difficulties and duplication of procurement costs for National Highways to procure a contractor simply for this short stretch of network given the current re-procurement strategy.