← Back to search results

AwardedFind a Tender · award

A9 Dualling: Tomatin to Moy project

Buyer: Transport Scotland →

BuyerTransport Scotland
StatusAwarded
DeadlineNot published
ValueValue not published
Published2 Sept 2024

What is being bought

Transport Scotland, on behalf of the Scottish Ministers, has identified the need to appoint a suitably experienced contractor for the design, construction, completion and maintenance of the proposed A9 Dualling: Tomatin to Moy project which involves widening of approximately 9.6km of existing A9 single and overtaking wide single 2+1 (WS2+1) road carriageway to Dual 2 lane All-purpose roads Sub-category c (D2APc) standard, in accordance with ‘CD 109 Highway Link Design’ within the UK Design Manual for Roads and Bridges, between the existing dual carriageway sections to the south of Tomatin and to the north of Moy.

Delivery location

UKM62

Categories

Excavating and earthmoving work 45112000Road bridge construction work 45221111Railway bridge construction work 45221112Culverts 45221220Road construction works 45233120Trunk road construction work 45233124Road junction construction work 45233125Grade-separated junction construction work 45233126Footpath construction work 45233161Cycle path construction work 45233162Paving and asphalting works 45233222Dual carriageway construction work 45233224Access road construction work 45233226Slip road construction work 45233227Erection of road-barriers 45233280Installation of road signs 45233290Environmental improvement works 45262640Restoration work 45454100Construction work for highways, roads 45233100

Lot details

Lot 1

Transport Scotland is an agency of the Scottish Government and contracts in the name of and on behalf of the Scottish Ministers. Transport Scotland has identified the requirement to appoint a suitably experienced Contractor to design & build a new dual carriageway between the village of Tomatin to the south and Moy to the north. The Contractor will be procured through a Competitive Dialogue procedure, in accordance with the Public Contracts (Scotland) Regulations 2015. Transport Scotland will manage the proposed procurement process for the A9 Dualling: Tomatin to Moy contract on behalf of the Scottish Ministers. In the event of a Contract award, the Contract will be entered into between the Scottish Ministers and the successful tenderer. The procurement process leading to the award of the Contract will comprise the following: 1. Prequalification (SPD) 2. Competitive Dialogue (approx. 16 weeks) 3. Tender (approx. 4 weeks) 4. Award Detailed information regarding the award process and award criteria for the tender phase will be supplied to economic operators who are invited to participate in dialogue. Transport Scotland shall notify Participants when the Competitive Dialogue phase has concluded and invite the Participants who have presented an acceptable solution to submit a final tender. Due to the project’s complexity, the Contract requires to be performed by a single entity and as such shall not be divided into lots. It is intended that the Contract will include the design and construction of the works which will last approximately 3 years, followed by a 5-year period of maintenance including defect correction and establishment of landscaping. The successful tenderer will not be required to carry out cyclic maintenance. The intended form of contract is to be an NEC4 Engineering and Construction Contract (ECC) Option A: priced contract with activity schedule with amendments. Contract documentation will be provided at ITPD stage to shortlisted participants, however the DRAFT conditions of contract will be made available for all economic operators to review within the Information Pack. Refer to Section VI.3) for further information on how to access to the Information Pack. Transport Scotland is providing a DRAFT of its conditions of contract to ensure prospective economic operators are informed as early as possible of the proposed contract. The DRAFT conditions of contract are subject to change and no obligation, liability, duty of care or responsibility to any party is created by or shall arise out of this. Selected Participants, following the Competitive Dialogue stage, shall be invited to submit a final tender on the same contract terms and conditions. To be considered for the prequalification stage, economic operators are required to complete and submit a Single Procurement Document (SPD) in accordance with this Contract Notice and the Supplementary Information Document (SID) which can be accessed via the Additional Documents located within the Additional Notice Options, this can be downloaded via the Public Contracts Scotland portal (www.publiccontractsscotland.gov.uk). Economic operators shall be evaluated in accordance with the Public Contracts (Scotland) Regulations 2015, on the basis of the information they have provided within the SPD. Additional information: Any economic operator who meets the selection criteria set out in the tender documents at the initial evaluation but subsequently, prior to contract award, fails to meet such criteria, shall be excluded from this procurement competition.

Statuscancelled

Award criteria
Criteria including approach to delivery&management, technical aspects, construction, commercial, risk and sustainability aspects of the project. Further detail will be issued to shortlisted bidders. — 50
Final tenders will be assessed against evaluation criteria to determine the most economically advantageous submission. Further information will be issued to shortlisted bidders. — 50

What is included

ItemCategoryQuantity
1Culverts, Road bridge construction work, Railway bridge construction work, Road construction works, Trunk road construction work, Road junction construction work, Grade-separated junction construction work, Footpath construction work, Cycle path construction work, Paving and asphalting works, Dual carriageway construction work, Access road construction work, Slip road construction work, Installation of road signs, Environmental improvement works, Erection of road-barriers, Excavating and earthmoving work, Restoration workNot published

Comparable-procurement analytics

Benchmarked against retained Find a Tender procedures with CPV division 45. The category anchor is Excavating and earthmoving work (45112000); this is a deliberately broad market comparator. The comparison is shown at several levels rather than pretending one company or region is always the best benchmark.

Comparison setProceduresReported bids per procedureNamed award suppliersPrice evidence
Market: CPV division 4517,1334 median · 30.3 average (5,651 of 17,133 with a bid count)3.8 average (6,250 of 17,133 with named award suppliers)Not published
Same buyer0Not publishedNot publishedNot published
Delivery region: UKM62514 median · 41.2 average (25 of 51 with a bid count)7.4 average (27 of 51 with named award suppliers)Not published

“Reported bids” is an official aggregate, sometimes reported per lot; it is the closest available competition measure. “Named award suppliers” are winners, not all applicants.

Price-outcome signal

Not enough comparable procedures currently publish both a GBP tender value and a usable lowest-valid-bid value to calculate a responsible price-reduction benchmark. Tenderline deliberately does not infer a saving from named award suppliers or from missing award values.

Procurement strategy & market signals

Framework agreementNot published
Dynamic purchasing systemNot published
Competitive procurementNot published
Recurring requirementNot published
Procurement method rationaleNot published
Rationale classificationsNot published
Special regimeNot published
Covered byGPA
Submission policyNot published
Selection criteriaNot published
Risk detailsNot published

Planning & early market engagement

BudgetNot published
No-engagement rationaleNot published
Planning documents0
Planning milestones0

No planning milestones published.

Related procurements

No linked framework, prior procurement or reprocurement published.

Awards

Contracts

028000-2024-1

Statusactive
Value£184,702,663

Documents & submission route

No documents are published in the current source record.

Source data inventory

Diagnostic view. “Not published” means this current release does not provide a value.

OCIDocds-h6vhtk-03fa2d
Latest release ID028000-2024
Latest release timestampMon Sep 02 2024 15:31:18 GMT+0000 (Coordinated Universal Time)
Sourcefind-a-tender
Official notice URLNot published
Tender statuscomplete
Procurement methodselective
Procurement method detailsCompetitive dialogue
Main procurement categoryworks
Above thresholdNot published
Legal basis32014L0024
Tender period: startNot published
Tender period: endNot published
Expression of interest deadlineNot published
Enquiry deadlineNot published
Award period: startNot published
Award period: endNot published
Submission method detailsNot published
Submission languagesNot published
Electronic catalogue policyNot published
Total tender valueNot published
Tender lots in source1
Tender items in source1
Tender documents in source0
Awards in latest release1
Contracts in latest release1
Parties in latest release3

Notice history

DateEventReference
2 Sept 2024award, contract028000-2024
5 Sept 2023tender026229-2023

All source data

Unmodified official OCDS data retained by Tenderline for this procurement process.

Complete current OCDS release JSON
{
  "id": "028000-2024",
  "tag": [
    "award",
    "contract"
  ],
  "bids": {
    "statistics": [
      {
        "id": "1",
        "value": 3,
        "measure": "bids",
        "relatedLot": "1"
      },
      {
        "id": "2",
        "value": 0,
        "measure": "smeBids",
        "relatedLot": "1"
      },
      {
        "id": "3",
        "value": 1,
        "measure": "foreignBidsFromEU",
        "relatedLot": "1"
      },
      {
        "id": "4",
        "value": 2,
        "measure": "foreignBidsFromNonEU",
        "relatedLot": "1"
      },
      {
        "id": "5",
        "value": 3,
        "measure": "electronicBids",
        "relatedLot": "1"
      }
    ]
  },
  "date": "2024-09-02T16:31:18+01:00",
  "ocid": "ocds-h6vhtk-03fa2d",
  "buyer": {
    "id": "GB-FTS-91872",
    "name": "Transport Scotland"
  },
  "links": [
    {
      "rel": "canonical",
      "href": "https://api.publiccontractsscotland.gov.uk/v1/Notice?id=ocds-r6ebe6-0000743273"
    }
  ],
  "awards": [
    {
      "id": "028000-2024-1",
      "status": "active",
      "suppliers": [
        {
          "id": "GB-FTS-74822",
          "name": "Balfour Beatty"
        }
      ],
      "relatedLots": [
        "1"
      ]
    }
  ],
  "tender": {
    "id": "TS/MP/WKS/2021/01",
    "lots": [
      {
        "id": "1",
        "status": "cancelled",
        "hasOptions": false,
        "description": "Transport Scotland is an agency of the Scottish Government and contracts in the name of and on behalf of the Scottish Ministers. Transport Scotland has identified the requirement to appoint a suitably experienced Contractor to design & build a new dual carriageway between the village of Tomatin to the south and Moy to the north.\nThe Contractor will be procured through a Competitive Dialogue procedure, in accordance with the Public Contracts (Scotland) Regulations 2015. Transport Scotland will manage the proposed procurement process for the A9 Dualling: Tomatin to Moy contract on behalf of the Scottish Ministers. In the event of a Contract award, the Contract will be entered into between the Scottish Ministers and the successful tenderer.\nThe procurement process leading to the award of the Contract will comprise the following:\n1. Prequalification (SPD)\n2. Competitive Dialogue (approx. 16 weeks)\n3. Tender (approx. 4 weeks)\n4. Award\nDetailed information regarding the award process and award criteria for the tender phase will be supplied to economic operators who are invited to participate in dialogue.\nTransport Scotland shall notify Participants when the Competitive Dialogue phase has concluded and invite the Participants who have presented an acceptable solution to submit a final tender.\nDue to the project’s complexity, the Contract requires to be performed by a single entity and as such shall not be divided into lots.\nIt is intended that the Contract will include the design and construction of the works which will last approximately 3 years, followed by a 5-year period of maintenance including defect correction and establishment of landscaping. The successful tenderer will not be required to carry out cyclic maintenance.\nThe intended form of contract is to be an NEC4 Engineering and Construction Contract (ECC) Option A: priced contract with activity schedule with amendments. Contract documentation will be provided at ITPD stage to shortlisted participants, however the DRAFT conditions of contract will be made available for all economic operators to review within the Information Pack. Refer to Section VI.3) for further information on how to access to the Information Pack.\nTransport Scotland is providing a DRAFT of its conditions of contract to ensure prospective economic operators are informed as early as possible of the proposed contract. The DRAFT conditions of contract are subject to change and no obligation, liability, duty of care or responsibility to any party is created by or shall arise out of this.\nSelected Participants, following the Competitive Dialogue stage, shall be invited to submit a final tender on the same contract terms and conditions.\nTo be considered for the prequalification stage, economic operators are required to complete and submit a Single Procurement Document (SPD) in accordance with this Contract Notice and the Supplementary Information Document (SID) which can be accessed via the Additional Documents located within the Additional Notice Options, this can be downloaded via the Public Contracts Scotland portal (www.publiccontractsscotland.gov.uk).\nEconomic operators shall be evaluated in accordance with the Public Contracts (Scotland) Regulations 2015, on the basis of the information they have provided within the SPD. Additional information: Any economic operator who meets the selection criteria set out in the tender documents at the initial evaluation but subsequently, prior to contract award, fails to meet such criteria, shall be excluded from this procurement competition.",
        "awardCriteria": {
          "criteria": [
            {
              "name": "Criteria including approach to delivery&management, technical aspects, construction, commercial, risk and sustainability aspects of the project. Further detail will be issued to shortlisted bidders.",
              "type": "quality",
              "description": "50"
            },
            {
              "name": "Final tenders will be assessed against evaluation criteria to determine the most economically advantageous submission. Further information will be issued to shortlisted bidders.",
              "type": "cost",
              "description": "50"
            }
          ]
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryLocation": {
          "description": "Highlands – Tomatin / Moy in the north of Scotland"
        },
        "deliveryAddresses": [
          {
            "region": "UKM62"
          }
        ],
        "additionalClassifications": [
          {
            "id": "45221220",
            "scheme": "CPV",
            "description": "Culverts"
          },
          {
            "id": "45221111",
            "scheme": "CPV",
            "description": "Road bridge construction work"
          },
          {
            "id": "45221112",
            "scheme": "CPV",
            "description": "Railway bridge construction work"
          },
          {
            "id": "45233120",
            "scheme": "CPV",
            "description": "Road construction works"
          },
          {
            "id": "45233124",
            "scheme": "CPV",
            "description": "Trunk road construction work"
          },
          {
            "id": "45233125",
            "scheme": "CPV",
            "description": "Road junction construction work"
          },
          {
            "id": "45233126",
            "scheme": "CPV",
            "description": "Grade-separated junction construction work"
          },
          {
            "id": "45233161",
            "scheme": "CPV",
            "description": "Footpath construction work"
          },
          {
            "id": "45233162",
            "scheme": "CPV",
            "description": "Cycle path construction work"
          },
          {
            "id": "45233222",
            "scheme": "CPV",
            "description": "Paving and asphalting works"
          },
          {
            "id": "45233224",
            "scheme": "CPV",
            "description": "Dual carriageway construction work"
          },
          {
            "id": "45233226",
            "scheme": "CPV",
            "description": "Access road construction work"
          },
          {
            "id": "45233227",
            "scheme": "CPV",
            "description": "Slip road construction work"
          },
          {
            "id": "45233290",
            "scheme": "CPV",
            "description": "Installation of road signs"
          },
          {
            "id": "45262640",
            "scheme": "CPV",
            "description": "Environmental improvement works"
          },
          {
            "id": "45233280",
            "scheme": "CPV",
            "description": "Erection of road-barriers"
          },
          {
            "id": "45112000",
            "scheme": "CPV",
            "description": "Excavating and earthmoving work"
          },
          {
            "id": "45454100",
            "scheme": "CPV",
            "description": "Restoration work"
          }
        ]
      }
    ],
    "title": "A9 Dualling: Tomatin to Moy project",
    "status": "complete",
    "coveredBy": [
      "GPA"
    ],
    "legalBasis": {
      "id": "32014L0024",
      "scheme": "CELEX"
    },
    "description": "Transport Scotland, on behalf of the Scottish Ministers, has identified the need to appoint a suitably experienced contractor for the design, construction, completion and maintenance of the proposed A9 Dualling: Tomatin to Moy project which involves widening of approximately 9.6km of existing A9 single and overtaking wide single 2+1 (WS2+1) road carriageway to Dual 2 lane All-purpose roads Sub-category c (D2APc) standard, in accordance with ‘CD 109 Highway Link Design’ within the UK Design Manual for Roads and Bridges, between the existing dual carriageway sections to the south of Tomatin and to the north of Moy.",
    "classification": {
      "id": "45233100",
      "scheme": "CPV",
      "description": "Construction work for highways, roads"
    },
    "procurementMethod": "selective",
    "mainProcurementCategory": "works",
    "procurementMethodDetails": "Competitive dialogue"
  },
  "parties": [
    {
      "id": "GB-FTS-91872",
      "name": "Transport Scotland",
      "roles": [
        "buyer",
        "centralPurchasingBody"
      ],
      "address": {
        "region": "UKM82",
        "locality": "Glasgow",
        "postalCode": "G1 2AD",
        "countryName": "United Kingdom",
        "streetAddress": "George House, 2nd Floor, 36 North Hanover Street"
      },
      "details": {
        "url": "http://www.transport.gov.scot",
        "buyerProfile": "https://www.publiccontractsscotland.gov.uk/search/Search_AuthProfile.aspx?ID=AA00099",
        "classifications": [
          {
            "id": "NATIONAL_AGENCY",
            "scheme": "TED_CA_TYPE",
            "description": "National or federal agency/office"
          },
          {
            "scheme": "COFOG",
            "description": "Construction (Road Infrastructure)"
          }
        ]
      },
      "identifier": {
        "legalName": "Transport Scotland"
      },
      "contactPoint": {
        "name": "Toby Millard",
        "email": "PDC@transport.gov.scot",
        "telephone": "+44 1412727100"
      }
    },
    {
      "id": "GB-FTS-74822",
      "name": "Balfour Beatty",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKM84",
        "locality": "London",
        "postalCode": "E14 5HU",
        "countryName": "United Kingdom",
        "streetAddress": "5 Churchill Place, Canary Wharf"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Balfour Beatty"
      },
      "contactPoint": {
        "telephone": "+44 1698647587"
      }
    },
    {
      "id": "GB-FTS-8771",
      "name": "Sheriff Clerk’s Office",
      "roles": [
        "reviewBody"
      ],
      "address": {
        "locality": "Glasgow",
        "countryName": "United Kingdom",
        "streetAddress": "PO Box 23, 1 Carlton Place"
      },
      "identifier": {
        "legalName": "Sheriff Clerk’s Office"
      },
      "contactPoint": {
        "email": "Glasgow@scotcourts.gov.uk"
      }
    }
  ],
  "language": "en",
  "contracts": [
    {
      "id": "028000-2024-1",
      "value": {
        "amount": 184702662.6,
        "currency": "GBP"
      },
      "status": "active",
      "awardID": "028000-2024-1",
      "dateSigned": "2024-07-30T00:00:00+01:00"
    }
  ],
  "description": "For additional information, refer to the Supplementary Information Document available via the Additional Documents, located within the Additional Notice Options of the Public Contracts Scotland portal.\nTo be considered for this procurement competition, economic operators should complete an SPD through the Public Contract Scotland portal and submit the completed SPD by no later than 12 noon BST on 11 October 2023. The deadline to submit questions relating to the submission is 12 noon BST on 29 September 2023\nTransport Scotland shall implement a Participation Costs reimbursement mechanism for Tenderers who submit a compliant Tender submission but are unsuccessful, up to a maximum cap of 200,000GBP. This capped reimbursement will be in respect of Participation Costs in the circumstances and on the terms set out in a dedicated Participation Agreement which will be issued to tenderers at Invitation to Participate in Dialogue stage.\nFor clarity, the term “Participation Costs” is anticipated to mean:\n1. the Tenderer’s actual incurred external costs (including in relation to technical due diligence, geotechnical investigation, design, design check and road safety audit consultants);\n2. the Tenderer’s disbursements (including travel and accommodation costs); and\n3. the Tenderer’s direct internal costs such as staff time (as recorded in time sheets by those staff working in respect of the Procurement Process);\nprovided that all of the above (i) have arisen directly from and during the Tenderer's involvement in the Procurement Process before the occurrence of one of the events set out in the relevant clauses within the Participation Agreement in Clause 3 or Clause 4 and (ii) in the reasonable opinion of the Scottish Ministers, have been reasonably, properly and demonstrably incurred by the Tenderer or which, in the reasonable opinion of the Scottish Ministers, are reasonably, properly and demonstrably due to be paid by the Tenderer. Head office overheads and head office management costs of the Tenderer, Member and/or its or their Associates, financing charges and profit (including any uplift or other profit sharing arrangement) shall not be Participation Costs.\nA project Information Pack will be made available to all prospective economic operators on 11 September 2023. Detail on the Information Pack will be in the Supplementary Information Document. This information is supplied without warranty and Transport Scotland shall be under no liability for any error, misstatement or omission of such information. To register to obtain access to this Information Pack on 11 September 2023, prospective economic operators are requested to contact PDC@transport.gov.scot.\n(SC Ref:776917)",
  "initiationType": "tender"
}
Complete JSON history (2 releases)
2 Sept 2024 · 028000-2024 · award, contract
{
  "id": "028000-2024",
  "tag": [
    "award",
    "contract"
  ],
  "bids": {
    "statistics": [
      {
        "id": "1",
        "value": 3,
        "measure": "bids",
        "relatedLot": "1"
      },
      {
        "id": "2",
        "value": 0,
        "measure": "smeBids",
        "relatedLot": "1"
      },
      {
        "id": "3",
        "value": 1,
        "measure": "foreignBidsFromEU",
        "relatedLot": "1"
      },
      {
        "id": "4",
        "value": 2,
        "measure": "foreignBidsFromNonEU",
        "relatedLot": "1"
      },
      {
        "id": "5",
        "value": 3,
        "measure": "electronicBids",
        "relatedLot": "1"
      }
    ]
  },
  "date": "2024-09-02T16:31:18+01:00",
  "ocid": "ocds-h6vhtk-03fa2d",
  "buyer": {
    "id": "GB-FTS-91872",
    "name": "Transport Scotland"
  },
  "links": [
    {
      "rel": "canonical",
      "href": "https://api.publiccontractsscotland.gov.uk/v1/Notice?id=ocds-r6ebe6-0000743273"
    }
  ],
  "awards": [
    {
      "id": "028000-2024-1",
      "status": "active",
      "suppliers": [
        {
          "id": "GB-FTS-74822",
          "name": "Balfour Beatty"
        }
      ],
      "relatedLots": [
        "1"
      ]
    }
  ],
  "tender": {
    "id": "TS/MP/WKS/2021/01",
    "lots": [
      {
        "id": "1",
        "status": "cancelled",
        "hasOptions": false,
        "description": "Transport Scotland is an agency of the Scottish Government and contracts in the name of and on behalf of the Scottish Ministers. Transport Scotland has identified the requirement to appoint a suitably experienced Contractor to design & build a new dual carriageway between the village of Tomatin to the south and Moy to the north.\nThe Contractor will be procured through a Competitive Dialogue procedure, in accordance with the Public Contracts (Scotland) Regulations 2015. Transport Scotland will manage the proposed procurement process for the A9 Dualling: Tomatin to Moy contract on behalf of the Scottish Ministers. In the event of a Contract award, the Contract will be entered into between the Scottish Ministers and the successful tenderer.\nThe procurement process leading to the award of the Contract will comprise the following:\n1. Prequalification (SPD)\n2. Competitive Dialogue (approx. 16 weeks)\n3. Tender (approx. 4 weeks)\n4. Award\nDetailed information regarding the award process and award criteria for the tender phase will be supplied to economic operators who are invited to participate in dialogue.\nTransport Scotland shall notify Participants when the Competitive Dialogue phase has concluded and invite the Participants who have presented an acceptable solution to submit a final tender.\nDue to the project’s complexity, the Contract requires to be performed by a single entity and as such shall not be divided into lots.\nIt is intended that the Contract will include the design and construction of the works which will last approximately 3 years, followed by a 5-year period of maintenance including defect correction and establishment of landscaping. The successful tenderer will not be required to carry out cyclic maintenance.\nThe intended form of contract is to be an NEC4 Engineering and Construction Contract (ECC) Option A: priced contract with activity schedule with amendments. Contract documentation will be provided at ITPD stage to shortlisted participants, however the DRAFT conditions of contract will be made available for all economic operators to review within the Information Pack. Refer to Section VI.3) for further information on how to access to the Information Pack.\nTransport Scotland is providing a DRAFT of its conditions of contract to ensure prospective economic operators are informed as early as possible of the proposed contract. The DRAFT conditions of contract are subject to change and no obligation, liability, duty of care or responsibility to any party is created by or shall arise out of this.\nSelected Participants, following the Competitive Dialogue stage, shall be invited to submit a final tender on the same contract terms and conditions.\nTo be considered for the prequalification stage, economic operators are required to complete and submit a Single Procurement Document (SPD) in accordance with this Contract Notice and the Supplementary Information Document (SID) which can be accessed via the Additional Documents located within the Additional Notice Options, this can be downloaded via the Public Contracts Scotland portal (www.publiccontractsscotland.gov.uk).\nEconomic operators shall be evaluated in accordance with the Public Contracts (Scotland) Regulations 2015, on the basis of the information they have provided within the SPD. Additional information: Any economic operator who meets the selection criteria set out in the tender documents at the initial evaluation but subsequently, prior to contract award, fails to meet such criteria, shall be excluded from this procurement competition.",
        "awardCriteria": {
          "criteria": [
            {
              "name": "Criteria including approach to delivery&management, technical aspects, construction, commercial, risk and sustainability aspects of the project. Further detail will be issued to shortlisted bidders.",
              "type": "quality",
              "description": "50"
            },
            {
              "name": "Final tenders will be assessed against evaluation criteria to determine the most economically advantageous submission. Further information will be issued to shortlisted bidders.",
              "type": "cost",
              "description": "50"
            }
          ]
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryLocation": {
          "description": "Highlands – Tomatin / Moy in the north of Scotland"
        },
        "deliveryAddresses": [
          {
            "region": "UKM62"
          }
        ],
        "additionalClassifications": [
          {
            "id": "45221220",
            "scheme": "CPV",
            "description": "Culverts"
          },
          {
            "id": "45221111",
            "scheme": "CPV",
            "description": "Road bridge construction work"
          },
          {
            "id": "45221112",
            "scheme": "CPV",
            "description": "Railway bridge construction work"
          },
          {
            "id": "45233120",
            "scheme": "CPV",
            "description": "Road construction works"
          },
          {
            "id": "45233124",
            "scheme": "CPV",
            "description": "Trunk road construction work"
          },
          {
            "id": "45233125",
            "scheme": "CPV",
            "description": "Road junction construction work"
          },
          {
            "id": "45233126",
            "scheme": "CPV",
            "description": "Grade-separated junction construction work"
          },
          {
            "id": "45233161",
            "scheme": "CPV",
            "description": "Footpath construction work"
          },
          {
            "id": "45233162",
            "scheme": "CPV",
            "description": "Cycle path construction work"
          },
          {
            "id": "45233222",
            "scheme": "CPV",
            "description": "Paving and asphalting works"
          },
          {
            "id": "45233224",
            "scheme": "CPV",
            "description": "Dual carriageway construction work"
          },
          {
            "id": "45233226",
            "scheme": "CPV",
            "description": "Access road construction work"
          },
          {
            "id": "45233227",
            "scheme": "CPV",
            "description": "Slip road construction work"
          },
          {
            "id": "45233290",
            "scheme": "CPV",
            "description": "Installation of road signs"
          },
          {
            "id": "45262640",
            "scheme": "CPV",
            "description": "Environmental improvement works"
          },
          {
            "id": "45233280",
            "scheme": "CPV",
            "description": "Erection of road-barriers"
          },
          {
            "id": "45112000",
            "scheme": "CPV",
            "description": "Excavating and earthmoving work"
          },
          {
            "id": "45454100",
            "scheme": "CPV",
            "description": "Restoration work"
          }
        ]
      }
    ],
    "title": "A9 Dualling: Tomatin to Moy project",
    "status": "complete",
    "coveredBy": [
      "GPA"
    ],
    "legalBasis": {
      "id": "32014L0024",
      "scheme": "CELEX"
    },
    "description": "Transport Scotland, on behalf of the Scottish Ministers, has identified the need to appoint a suitably experienced contractor for the design, construction, completion and maintenance of the proposed A9 Dualling: Tomatin to Moy project which involves widening of approximately 9.6km of existing A9 single and overtaking wide single 2+1 (WS2+1) road carriageway to Dual 2 lane All-purpose roads Sub-category c (D2APc) standard, in accordance with ‘CD 109 Highway Link Design’ within the UK Design Manual for Roads and Bridges, between the existing dual carriageway sections to the south of Tomatin and to the north of Moy.",
    "classification": {
      "id": "45233100",
      "scheme": "CPV",
      "description": "Construction work for highways, roads"
    },
    "procurementMethod": "selective",
    "mainProcurementCategory": "works",
    "procurementMethodDetails": "Competitive dialogue"
  },
  "parties": [
    {
      "id": "GB-FTS-91872",
      "name": "Transport Scotland",
      "roles": [
        "buyer",
        "centralPurchasingBody"
      ],
      "address": {
        "region": "UKM82",
        "locality": "Glasgow",
        "postalCode": "G1 2AD",
        "countryName": "United Kingdom",
        "streetAddress": "George House, 2nd Floor, 36 North Hanover Street"
      },
      "details": {
        "url": "http://www.transport.gov.scot",
        "buyerProfile": "https://www.publiccontractsscotland.gov.uk/search/Search_AuthProfile.aspx?ID=AA00099",
        "classifications": [
          {
            "id": "NATIONAL_AGENCY",
            "scheme": "TED_CA_TYPE",
            "description": "National or federal agency/office"
          },
          {
            "scheme": "COFOG",
            "description": "Construction (Road Infrastructure)"
          }
        ]
      },
      "identifier": {
        "legalName": "Transport Scotland"
      },
      "contactPoint": {
        "name": "Toby Millard",
        "email": "PDC@transport.gov.scot",
        "telephone": "+44 1412727100"
      }
    },
    {
      "id": "GB-FTS-74822",
      "name": "Balfour Beatty",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UKM84",
        "locality": "London",
        "postalCode": "E14 5HU",
        "countryName": "United Kingdom",
        "streetAddress": "5 Churchill Place, Canary Wharf"
      },
      "details": {
        "scale": "large"
      },
      "identifier": {
        "legalName": "Balfour Beatty"
      },
      "contactPoint": {
        "telephone": "+44 1698647587"
      }
    },
    {
      "id": "GB-FTS-8771",
      "name": "Sheriff Clerk’s Office",
      "roles": [
        "reviewBody"
      ],
      "address": {
        "locality": "Glasgow",
        "countryName": "United Kingdom",
        "streetAddress": "PO Box 23, 1 Carlton Place"
      },
      "identifier": {
        "legalName": "Sheriff Clerk’s Office"
      },
      "contactPoint": {
        "email": "Glasgow@scotcourts.gov.uk"
      }
    }
  ],
  "language": "en",
  "contracts": [
    {
      "id": "028000-2024-1",
      "value": {
        "amount": 184702662.6,
        "currency": "GBP"
      },
      "status": "active",
      "awardID": "028000-2024-1",
      "dateSigned": "2024-07-30T00:00:00+01:00"
    }
  ],
  "description": "For additional information, refer to the Supplementary Information Document available via the Additional Documents, located within the Additional Notice Options of the Public Contracts Scotland portal.\nTo be considered for this procurement competition, economic operators should complete an SPD through the Public Contract Scotland portal and submit the completed SPD by no later than 12 noon BST on 11 October 2023. The deadline to submit questions relating to the submission is 12 noon BST on 29 September 2023\nTransport Scotland shall implement a Participation Costs reimbursement mechanism for Tenderers who submit a compliant Tender submission but are unsuccessful, up to a maximum cap of 200,000GBP. This capped reimbursement will be in respect of Participation Costs in the circumstances and on the terms set out in a dedicated Participation Agreement which will be issued to tenderers at Invitation to Participate in Dialogue stage.\nFor clarity, the term “Participation Costs” is anticipated to mean:\n1. the Tenderer’s actual incurred external costs (including in relation to technical due diligence, geotechnical investigation, design, design check and road safety audit consultants);\n2. the Tenderer’s disbursements (including travel and accommodation costs); and\n3. the Tenderer’s direct internal costs such as staff time (as recorded in time sheets by those staff working in respect of the Procurement Process);\nprovided that all of the above (i) have arisen directly from and during the Tenderer's involvement in the Procurement Process before the occurrence of one of the events set out in the relevant clauses within the Participation Agreement in Clause 3 or Clause 4 and (ii) in the reasonable opinion of the Scottish Ministers, have been reasonably, properly and demonstrably incurred by the Tenderer or which, in the reasonable opinion of the Scottish Ministers, are reasonably, properly and demonstrably due to be paid by the Tenderer. Head office overheads and head office management costs of the Tenderer, Member and/or its or their Associates, financing charges and profit (including any uplift or other profit sharing arrangement) shall not be Participation Costs.\nA project Information Pack will be made available to all prospective economic operators on 11 September 2023. Detail on the Information Pack will be in the Supplementary Information Document. This information is supplied without warranty and Transport Scotland shall be under no liability for any error, misstatement or omission of such information. To register to obtain access to this Information Pack on 11 September 2023, prospective economic operators are requested to contact PDC@transport.gov.scot.\n(SC Ref:776917)",
  "initiationType": "tender"
}
5 Sept 2023 · 026229-2023 · tender
{
  "id": "026229-2023",
  "tag": [
    "tender"
  ],
  "date": "2023-09-05T15:57:12+01:00",
  "ocid": "ocds-h6vhtk-03fa2d",
  "buyer": {
    "id": "GB-FTS-91872",
    "name": "Transport Scotland"
  },
  "links": [
    {
      "rel": "canonical",
      "href": "https://api.publiccontractsscotland.gov.uk/v1/Notice?id=ocds-r6ebe6-0000743273"
    }
  ],
  "tender": {
    "id": "TS/MP/WKS/2021/01",
    "lots": [
      {
        "id": "1",
        "value": {
          "amount": 150000000,
          "currency": "GBP"
        },
        "status": "active",
        "hasOptions": false,
        "hasRenewal": false,
        "description": "Transport Scotland is an agency of the Scottish Government and contracts in the name of and on behalf of the Scottish Ministers. Transport Scotland has identified the requirement to appoint a suitably experienced Contractor to design & build a new dual carriageway between the village of Tomatin to the south and Moy to the north.\nThe Contractor will be procured through a Competitive Dialogue procedure, in accordance with the Public Contracts (Scotland) Regulations 2015. Transport Scotland will manage the proposed procurement process for the A9 Dualling: Tomatin to Moy contract on behalf of the Scottish Ministers. In the event of a Contract award, the Contract will be entered into between the Scottish Ministers and the successful tenderer.\nThe procurement process leading to the award of the Contract will comprise the following:\n1. Prequalification (SPD)\n2. Competitive Dialogue (approx. 16 weeks)\n3. Tender (approx. 4 weeks)\n4. Award\nDetailed information regarding the award process and award criteria for the tender phase will be supplied to economic operators who are invited to participate in dialogue.\nTransport Scotland shall notify Participants when the Competitive Dialogue phase has concluded and invite the Participants who have presented an acceptable solution to submit a final tender.\nDue to the project’s complexity, the Contract requires to be performed by a single entity and as such shall not be divided into lots.\nIt is intended that the Contract will include the design and construction of the works which will last approximately 3 years, followed by a 5-year period of maintenance including defect correction and establishment of landscaping. The successful tenderer will not be required to carry out cyclic maintenance.\nThe intended form of contract is to be an NEC4 Engineering and Construction Contract (ECC) Option A: priced contract with activity schedule with amendments. Contract documentation will be provided at ITPD stage to shortlisted participants, however the DRAFT conditions of contract will be made available for all economic operators to review within the Information Pack. Refer to Section VI.3) for further information on how to access to the Information Pack.\nTransport Scotland is providing a DRAFT of its conditions of contract to ensure prospective economic operators are informed as early as possible of the proposed contract. The DRAFT conditions of contract are subject to change and no obligation, liability, duty of care or responsibility to any party is created by or shall arise out of this.\nSelected Participants, following the Competitive Dialogue stage, shall be invited to submit a final tender on the same contract terms and conditions.\nTo be considered for the prequalification stage, economic operators are required to complete and submit a Single Procurement Document (SPD) in accordance with this Contract Notice and the Supplementary Information Document (SID) which can be accessed via the Additional Documents located within the Additional Notice Options, this can be downloaded via the Public Contracts Scotland portal (www.publiccontractsscotland.gov.uk).\nEconomic operators shall be evaluated in accordance with the Public Contracts (Scotland) Regulations 2015, on the basis of the information they have provided within the SPD. Additional information: Any economic operator who meets the selection criteria set out in the tender documents at the initial evaluation but subsequently, prior to contract award, fails to meet such criteria, shall be excluded from this procurement competition.",
        "secondStage": {
          "maximumCandidates": 3
        },
        "awardCriteria": {
          "criteria": [
            {
              "name": "Criteria including approach to delivery&management, technical aspects, construction, commercial, risk and sustainability aspects of the project. Further detail will be issued to shortlisted bidders.",
              "type": "quality",
              "description": "50"
            },
            {
              "name": "Final tenders will be assessed against evaluation criteria to determine the most economically advantageous submission. Further information will be issued to shortlisted bidders.",
              "type": "cost",
              "description": "50"
            }
          ]
        },
        "contractPeriod": {
          "durationInDays": 3000
        },
        "submissionTerms": {
          "variantPolicy": "allowed"
        },
        "selectionCriteria": {
          "description": "Objective criteria for choosing the limited number of candidates:\nIt is intended that 3 economic operators be taken forward to participate in dialogue. These economic operators shall be those who have:\n(i)\tsubmitted a compliant submission, comprising the completed SPD;\n(ii)\tsatisfied the relevant selection criteria under the exclusion grounds;\n(iii)\tmet the following criteria:\na)\tMinimum Standards of Eligibility – provided evidence of working on specified types of projects over a specified value;\nb)\tTechnical or Professional Ability – provided evidence demonstrating an acceptable level of technical or professional ability; and\nc)\tHuman Resources – possess the necessary educational and professional qualifications, qualified appropriately to perform the requirement.\n(iv)\tin place quality, environmental and health and safety management systems\n(v)\tin place appropriate sustainability measures attributing significantly to the requirement\n(vi)\tsatisfied minimum standards of economic and financial standing;\n(vii)\tappropriate experience in acting as the ‘Principal Contractor’ and ‘Principal Designer’ under the Construction (Design and Management) Regulations 2015 or equivalent;\n(viii)\tachieved the first, second, or third highest combined weighted scores in respect of technical or professional ability calculated in accordance with the responses to Statements (d) to (h) inclusive (refer to Section III.1.3).\nHowever, if any economic operator has not submitted a compliant submission as described in (i) above, failed in respect of either (ii), (iii), (iv), (v), (vi) or (vii) above, then that economic operator shall be excluded from the ranking scores described in (viii) as above.\nFollowing evaluation of SPD responses in accordance with the evaluation criteria set out in (i) to (viii) above, it is intended that the three economic operators with the highest scoring  compliant bids will be invited to participate in dialogue. The three economic operators with the highest scoring compliant bids will be required to confirm that they wish to participate in dialogue, prior to issue of the ITPD. Should one or more of such economic operators not provide such confirmation or no longer wish to participate in the process, then the next highest ranking economic operator may be invited to participate in dialogue.\nIn terms of the Public Contracts (Scotland) Regulations 2015, there will be a requirement on economic operators to provide proof of economic and financial standing and of technical and professional ability prior to proceeding to the next stage of the competition and contract award, and the tender documents will contain specific provisions requiring tenderers to inform Transport Scotland of any changes to their economic and financial standing or technical and professional ability during the procurement competition.\nFurther, Transport Scotland reserves the right to undertake further verification to ensure continuing compliance with the selection criteria at any time prior to proceeding to the next stage of the competition and contract award, including during any standstill period. If means of proof does not satisfy Transport Scotland’s selection criteria and/or if an economic operator no longer meets the requirements set out in the tender documents, it shall be excluded from this procurement competition. If this follows tender evaluation, including during any standstill period, the next ranked most economically advantageous tenderer shall be requested to provide proof of economic and financial standing and technical and professional ability with a view to contract award."
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryLocation": {
          "description": "Highlands – Tomatin / Moy in the north of Scotland"
        },
        "deliveryAddresses": [
          {
            "region": "UKM62"
          }
        ],
        "additionalClassifications": [
          {
            "id": "45221220",
            "scheme": "CPV",
            "description": "Culverts"
          },
          {
            "id": "45221111",
            "scheme": "CPV",
            "description": "Road bridge construction work"
          },
          {
            "id": "45221112",
            "scheme": "CPV",
            "description": "Railway bridge construction work"
          },
          {
            "id": "45233120",
            "scheme": "CPV",
            "description": "Road construction works"
          },
          {
            "id": "45233124",
            "scheme": "CPV",
            "description": "Trunk road construction work"
          },
          {
            "id": "45233125",
            "scheme": "CPV",
            "description": "Road junction construction work"
          },
          {
            "id": "45233126",
            "scheme": "CPV",
            "description": "Grade-separated junction construction work"
          },
          {
            "id": "45233161",
            "scheme": "CPV",
            "description": "Footpath construction work"
          },
          {
            "id": "45233162",
            "scheme": "CPV",
            "description": "Cycle path construction work"
          },
          {
            "id": "45233222",
            "scheme": "CPV",
            "description": "Paving and asphalting works"
          },
          {
            "id": "45233224",
            "scheme": "CPV",
            "description": "Dual carriageway construction work"
          },
          {
            "id": "45233226",
            "scheme": "CPV",
            "description": "Access road construction work"
          },
          {
            "id": "45233227",
            "scheme": "CPV",
            "description": "Slip road construction work"
          },
          {
            "id": "45233290",
            "scheme": "CPV",
            "description": "Installation of road signs"
          },
          {
            "id": "45262640",
            "scheme": "CPV",
            "description": "Environmental improvement works"
          },
          {
            "id": "45233280",
            "scheme": "CPV",
            "description": "Erection of road-barriers"
          },
          {
            "id": "45112000",
            "scheme": "CPV",
            "description": "Excavating and earthmoving work"
          },
          {
            "id": "45454100",
            "scheme": "CPV",
            "description": "Restoration work"
          }
        ]
      }
    ],
    "title": "A9 Dualling: Tomatin to Moy project",
    "value": {
      "amount": 150000000,
      "currency": "GBP"
    },
    "status": "active",
    "coveredBy": [
      "GPA"
    ],
    "legalBasis": {
      "id": "32014L0024",
      "scheme": "CELEX"
    },
    "description": "Transport Scotland, on behalf of the Scottish Ministers, has identified the need to appoint a suitably experienced contractor for the design, construction, completion and maintenance of the proposed A9 Dualling: Tomatin to Moy project which involves widening of approximately 9.6km of existing A9 single and overtaking wide single 2+1 (WS2+1) road carriageway to Dual 2 lane All-purpose roads Sub-category c (D2APc) standard, in accordance with ‘CD 109 Highway Link Design’ within the UK Design Manual for Roads and Bridges, between the existing dual carriageway sections to the south of Tomatin and to the north of Moy.",
    "secondStage": {
      "invitationDate": "2023-11-07T00:00:00Z"
    },
    "tenderPeriod": {
      "endDate": "2023-10-11T12:00:00+01:00"
    },
    "contractTerms": {
      "performanceTerms": "It is the Employer’s policy to measure the performance of the Contractor on a regular basis.\nIn the event that the Contractor’s performance falls below a satisfactory level, the Contractor will be invited to determine a means of rectifying the situation. Repeated or continual performance failures may result in suspension or termination of the contract.",
      "hasElectronicPayment": true,
      "hasElectronicOrdering": true,
      "electronicInvoicingPolicy": "allowed"
    },
    "hasRecurrence": false,
    "classification": {
      "id": "45233100",
      "scheme": "CPV",
      "description": "Construction work for highways, roads"
    },
    "submissionTerms": {
      "languages": [
        "en"
      ],
      "bidValidityPeriod": {
        "durationInDays": 90
      }
    },
    "submissionMethod": [
      "electronicSubmission"
    ],
    "otherRequirements": {
      "requiresStaffNamesAndQualifications": true
    },
    "procurementMethod": "selective",
    "selectionCriteria": {
      "criteria": [
        {
          "type": "suitability",
          "appliesTo": [
            "supplier"
          ],
          "description": "Economic operators must be enrolled in the relevant professional or trade registers kept in the Member state of its establishment (as described in Schedule 5 of the Public Contracts (Scotland) Regulations 2015) (i.e., registered under Companies House). Economic operators should provide details under Question Ref. 4A.1.\nAccreditation\nEconomic operators or their appropriate subcontractors must be accredited under National Highway Sector Scheme (NHSS). The relevant NHSS accreditations are included within the section VI.3 of the Supplementary Information Document.\nEconomic operators who are not accredited shall not progress beyond the assessment selection stage.\nEconomic operators must provide confirmation of the required accreditations under Question Ref. 4D.1, in accordance with the requirements of this Contract Notice.\nStaff\nThe successful tenderer shall be required to comply with the CDM Regulations (2015) and to comply with all other relevant health and safety law. Additionally, all site staff are to be accredited under the Construction Skills Construction Safety Scheme (CSCS) or equivalent.\nStandards and Specification\nSubject to the other provisions of the Contract, the standards and specifications which the Contractor shall comply with include:\n-UK Department for Transport Standards for Highways, specifically:\n-Design Manual for Roads and Bridges (DMRB)\n-Manual of Contract Documents for Highway Works (MCHW)\n-Transport Scotland Interim Amendments (TSIA)\n-The Highland Council Roads and Transport Guidelines for New Developments\n-Eurocodes; specifically;\n-Eurocode 7 (including UK National Annex)\n-Eurocode 8 to the extent applicable in the UK\n-Other Eurocodes to the extent necessary for the understanding and implementation of Eurocodes 7 and 8\n-BS EN and BS EN ISO standards relating to geotechnical investigation and execution of geotechnical works including earthworks as well as installation of environmental barriers.\n-BS Codes of Practice relating to geotechnical investigation and the design and execution of geotechnical works including earthworks\n-Other Non-Conflicting Complementary Information (NCCI) relating to geotechnical investigation and the design and execution of geotechnical works including earthworks.\nIt is the intention that the completed scheme shall be BIM Level 2 compliant at the handover of the built asset. The handover of the built asset shall include the Level 2 BIM output along with the requisite ‘as constructed’ information, the Health & Safety File and the Operation & Maintenance manuals.\nThe BIM Level 2 requirements at the handover of the built asset will be in compliance with ISO 19650 as prescribed in the Scope  which will be provided upon commencement of the competitive dialogue process.\nQualifications and Experience\nIt is a requirement of the Contract that staff employed under the Contract shall have minimum levels of experience, education and professional qualifications. In particular, the Designer and the Designer’s site representative shall have staff who are Chartered professionals (or equivalent) who will perform the Design in accordance with the appropriate standards and specification and, coupled with the relevant experience of site supervision as a Designer’s Site Representative, supervise the design, construction, completion and maintenance process.\nConstruction (Design and Management) Regulations 2015 (CDM 2015)\nIt is intended that, the successful tenderer shall fulfil the duties of Principal Contractor and Principal Designer under CDM 2015. Therefore, economic operators shall be required to satisfy the Scottish Ministers as to their competence, resources and willingness to be appointed as Principal Contractor and Principal Designer and fulfil those duties in accordance with CDM 2015 (refer to III.1.3)."
        },
        {
          "type": "economic",
          "minimum": "Economic operators shall be required to satisfy minimum standards of economic and financial standing. These are described below:\nEvaluation Criteria Ratios (Question Ref. 4B.6)\nThe following nine evaluation criteria shall be scored, for each year of the last two years of trading, or for the period which is available if trading for less than two years:\n1.\tAcid Test Ratio\n2.\tCash Interest Cover Ratio\n3.\tReturn on Capital Employed\n4.\tOperating Profit Ratio\n5.\tNet Worth\n6.\tGearing\n7.\tAnnual Contract Value to Turnover\n8.\tFiled Accounts\n9.\tAudit Report\nThe scoring mechanism can be located within the Supplementary Information Document and downloaded via the Additional Documents, located within the Additional Notice Options of the Public Contracts Scotland portal (www.publiccontractsscotland.gov.uk). For the purpose of calculating the Annual Contract Value to Turnover ratio the estimated value in II.2.6 of this Contract Notice shall be adopted. Similarly, for the purposes of this ratio, the duration of the contract (construction phase) shall be approximately 3 years . This equates to an estimated value of [48,520,000.GBP] per annum for the initial construction phase, followed by an estimated value of [888,000GBP] per annum for the subsequent maintenance phase (60 months).\nThe nine evaluation criteria will be individually scored and given a total aggregated score, out of a possible 50 marks, for each year of trading. Subsequently, each year’s score will be weighted, with the most recent (“Year 1”) weighted at 2/3rds and the previous (“Year 2”) weighted at 1/3rd, and then aggregated to form an overall score for the two years out of 50 marks.\nIf the economic operator is trading for less than 2 years, their financial ratios for the most recent full year of trading will be weighted at 2/3rds scored out of the total 50 marks. If the economic operator is trading for less than 1 year the information provided under III.1.2) b), will be prorated up to 1 year to calculate financial ratios for the full year and this will be weighted at 2/3rds and scored out of the total 50 marks.\nA submission shall be marked as a FAIL and will not be considered further if the score achieved by an economic operator (either a single economic operator or a group of economic operators) is less than 25 marks, out of the potential total aggregated score of 50 marks.\nA submission shall be marked as a FAIL and will not be considered further if the economic operator is unable to provide appropriate information to enable the calculation of the financial ratios.\nWhere the submission has been submitted by a group of economic operators, the information submitted by each group member will be evaluated in the proportion of the percentage shareholdings or percentage equity/interest of each group member and a score determined for such group of economic operators on that basis.\nA “group of economic operators” is defined as an unincorporated consortium or joint venture.\nInsurance (Question Ref. 4B.5)\nIn response to Question Ref. 4B.5, economic operators must confirm they already have or can commit to obtain, prior to the commencement, the following levels of insurance:\nProfessional Indemnity Insurance = GBP 10 million\nPublic Liability Insurance = GBP 155 million\nEmployer’s (Compulsory) Liability Insurance = GBP 10 million\nIn responding to Question Ref. 4B.5, where the economic operator responds “No, and I cannot commit to obtain it” they shall be marked as FAIL and shall be excluded from this procurement competition.",
          "appliesTo": [
            "supplier"
          ],
          "description": "Economic operators shall be required to satisfy minimum standards of economic and financial standing. To determine these standards, economic operators shall:\na)\tin response to SPD, Question Ref. 4B1a provide the specified annual turnover for the last two years of trading, or for the period which is available if trading for less than two years;\nb)\tin response to SPD, Question Ref. 4B.6 provide the name, range and score of nine financial criteria for each year for the last two years of trading, or for the period which is available if trading for less than two years; and\nc)\tin response to SPD, Question Ref. 4B.5 confirm they already have or can commit to obtain, prior to commencement of the contract the required levels of insurance.\nIn addition to the information requested under (a) to (c), economic operators must provide a link / copies of the associated annual accounts as filed at Companies House (or equivalent if not a UK registered company). For the avoidance of doubt, if an economic operator fails to provide accounts relating to its last two full years of trading that are due to have been filed, that economic operator will be excluded from this procurement competition.\nWhere economic operators have not yet been trading for a full two year period, such that filed accounts are not yet due and available, and limited only to that circumstance, the required information to support (a) to (c) above may take the form of appropriate third party / statements setting out turnover, profit and loss, cashflow (current and forecast) and the economic operator’s credit facility position. Note there will, however, be a negative scoring implication as noted below and in the Additional Documents.\nThis information has been requested to enable Transport Scotland to perform their own assessment and confirm the financial ratios submitted. Ultimately, ensuring the correct score is allocated, and to ensure no misinterpretation. Where there exist differences in ratios, between those provided and those calculated by Transport Scotland, clarification will be sought."
        },
        {
          "type": "technical",
          "minimum": "Statements (a) to (h) as summarised below and set out in full in the ‘Technical and professional ability questions’ document available in the Additional Documents, within the Additional Notice Options of the Public Contracts Scotland portal (www.publiccontractsscotland.gov.uk)\nMinimum level(s) of standards required:\nStatement (a) – Reference projects – Contractor\nStatement (b) – Reference projects – Designer\nStatement (c) – CDM Regulations 2015\nStatement (d) – Programme Management\nStatement (e) – Commercial Management\nStatement (f) – Public Utilities\nStatement (g) – Sustainability\nStatement (h) – Traffic Management\nUnder SPD, Question Ref. 4C.7 economic operators shall be required to provide details of the environmental management measures which they will be able to use when performing the Contract.  In addition, economic operators are also required to complete the \"Priority Contract\" Climate Change Plan Template which can be found in the additional documents section of the Contract Notice. The response shall be assessed on the basis of PASS or FAIL. Economic Operators will obtain a PASS where the production and submission of a Bidder Climate Change Plan that has been reviewed and signed off by the board of directors (or equivalent management body). Economic operators who fail to provide the information required shall be excluded from the procurement competition.",
          "appliesTo": [
            "supplier"
          ],
          "description": "For 4C.1.1 economic operators shall be required to insert suitable responses to Statements (a) to (h) as summarised below and set out in full in the ‘Technical and professional ability questions’ within the Supplementary Information Document, available in the Additional Documents, within the Additional Notice Options of the Public Contracts Scotland portal (www.publiccontractsscotland.gov.uk), demonstrating that they have the required minimum standards of eligibility and technical and professional ability. Answers to these statements shall be provided by single economic operators and by groups of economic operators (group members should not respond individually).\nResponses to Statements (a) to (c) shall be assessed on the basis of PASS or FAIL. Economic operators who fail to satisfy these minimum standards (either they answer ‘No’ or fail to provide an acceptable answer) shall be excluded from the procurement competition.\nResponses to Statements (d) to (h) inclusive shall be assessed on the basis of a score from 0-5, with a minimum threshold. The scoring criteria and full statements can be downloaded via the Additional Documents, located within the Additional Notice Options of the Public Contracts Scotland portal (www.publiccontractsscotland.gov.uk).\nA response shall be marked as a FAIL and will not be considered further if the score achieved for any statement is less than 2. Where a response is 2 or greater it shall be weighted in accordance with the following weightings: Statement (d) = 20%; Statement (e) = 25%; Statement (f) = 15%; Statement (g) = 25%; Statement (h) = 15%. The weighted scores shall be aggregated to calculate a score out of 100 for the 5 statements. Words or pages in excess of the maximum limit for each statement will neither be considered nor scored.\nResponses to Statements (d) to (h) shall be marked as a FAIL if they include projects which are not contained as part of the \"reference projects\" provided within Statements (a) and (b)."
        }
      ]
    },
    "mainProcurementCategory": "works",
    "submissionMethodDetails": "http://www.publiccontractsscotland.gov.uk",
    "procurementMethodDetails": "Competitive dialogue"
  },
  "parties": [
    {
      "id": "GB-FTS-91872",
      "name": "Transport Scotland",
      "roles": [
        "buyer",
        "centralPurchasingBody"
      ],
      "address": {
        "region": "UKM82",
        "locality": "Glasgow",
        "postalCode": "G1 2AD",
        "countryName": "United Kingdom",
        "streetAddress": "George House, 2nd Floor, 36 North Hanover Street"
      },
      "details": {
        "url": "http://www.transport.gov.scot",
        "buyerProfile": "https://www.publiccontractsscotland.gov.uk/search/Search_AuthProfile.aspx?ID=AA00099",
        "classifications": [
          {
            "id": "NATIONAL_AGENCY",
            "scheme": "TED_CA_TYPE",
            "description": "National or federal agency/office"
          },
          {
            "scheme": "COFOG",
            "description": "Construction (Road Infrastructure)"
          }
        ]
      },
      "identifier": {
        "legalName": "Transport Scotland"
      },
      "contactPoint": {
        "url": "http://www.publiccontractsscotland.gov.uk",
        "name": "Toby Millard",
        "email": "PDC@transport.gov.scot",
        "telephone": "+44 1412727100"
      }
    },
    {
      "id": "GB-FTS-8771",
      "name": "Sheriff Clerk’s Office",
      "roles": [
        "reviewBody"
      ],
      "address": {
        "locality": "Glasgow",
        "countryName": "United Kingdom",
        "streetAddress": "PO Box 23, 1 Carlton Place"
      },
      "identifier": {
        "legalName": "Sheriff Clerk’s Office"
      },
      "contactPoint": {
        "email": "Glasgow@scotcourts.gov.uk"
      }
    }
  ],
  "language": "en",
  "description": "For additional information, refer to the Supplementary Information Document available via the Additional Documents, located within the Additional Notice Options of the Public Contracts Scotland portal.\nTo be considered for this procurement competition, economic operators should complete an SPD through the Public Contract Scotland portal and submit the completed SPD by no later than 12 noon BST on 11 October 2023. The deadline to submit questions relating to the submission is 12 noon BST on 29 September 2023\nTransport Scotland shall implement a Participation Costs reimbursement mechanism for Tenderers who submit a compliant Tender submission but are unsuccessful, up to a maximum cap of 200,000GBP. This capped reimbursement will be in respect of Participation Costs in the circumstances and on the terms set out in a dedicated Participation Agreement which will be issued to tenderers at Invitation to Participate in Dialogue stage.\nFor clarity, the term “Participation Costs” is anticipated to mean:\n1. the Tenderer’s actual incurred external costs (including in relation to technical due diligence, geotechnical investigation, design, design check and road safety audit consultants);\n2. the Tenderer’s disbursements (including travel and accommodation costs); and\n3. the Tenderer’s direct internal costs such as staff time (as recorded in time sheets by those staff working in respect of the Procurement Process);\nprovided that all of the above (i) have arisen directly from and during the Tenderer's involvement in the Procurement Process before the occurrence of one of the events set out in the relevant clauses within the Participation Agreement in Clause 3 or Clause 4 and (ii) in the reasonable opinion of the Scottish Ministers, have been reasonably, properly and demonstrably incurred by the Tenderer or which, in the reasonable opinion of the Scottish Ministers, are reasonably, properly and demonstrably due to be paid by the Tenderer. Head office overheads and head office management costs of the Tenderer, Member and/or its or their Associates, financing charges and profit (including any uplift or other profit sharing arrangement) shall not be Participation Costs.\nA project Information Pack will be made available to all prospective economic operators on 11 September 2023. Detail on the Information Pack will be in the Supplementary Information Document. This information is supplied without warranty and Transport Scotland shall be under no liability for any error, misstatement or omission of such information. To register to obtain access to this Information Pack on 11 September 2023, prospective economic operators are requested to contact PDC@transport.gov.scot.\nNOTE: To register your interest in this notice and obtain any additional information please visit the Public Contracts Scotland Web Site at https://www.publiccontractsscotland.gov.uk/Search/Search_Switch.aspx?ID=743273.\nThe buyer has indicated that it will accept electronic responses to this notice via the Postbox facility. A user guide is available at https://www.publiccontractsscotland.gov.uk/sitehelp/help_guides.aspx.\nSuppliers are advised to allow adequate time for uploading documents and to dispatch the electronic response well in advance of the closing time to avoid any last minute problems.\nA sub-contract clause has been included in this contract. For more information see: http://www.publiccontractsscotland.gov.uk/info/InfoCentre.aspx?ID=2363\nCommunity benefits are included in this requirement. For more information see: https://www.gov.scot/policies/public-sector-procurement/community-benefits-in-procurement/\nA summary of the expected community benefits has been provided as follows:\nDetails of community benefit provisions are included within the Supplementary Information Document.\n(SC Ref:743273)\nDownload the ESPD document here: https://www.publiccontractsscotland.gov.uk/ESPD/ESPD_Download.aspx?id=743273",
  "initiationType": "tender"
}