A9 Dualling: Pitlochry to Killiecrankie project
Buyer: Transport Scotland →
What is being bought
The Scope involves the dualling of approximately four miles (6.4km) of existing single carriageway on the A9 trunk road between Pitlochry and Killiecrankie. This consists of approximately 4km of online widening and approximately 2km of offline construction. The new/upgraded carriageway will be to Dual 2 lane All-purpose roads Sub-category c (D2APc) standard, in accordance with ‘CD 109 Highway Link Design’ within the UK Design Manual for Roads and Bridges. The project also includes (but is not limited to) construction of two grade separated junctions, construction of two left-in left-out junctions, construction of two major underbridges, demolition and replacement of three existing underbridges, an extension of one existing rail underbridge and construction of one new rail underbridge, provision of five other new underbridges/underpasses, six new retaining walls and fifteen culverts. Additionally, the project involves maintenance works at the existing Tummel underbridge, provision of traffic management, earthworks, road restraint systems, accommodation works, service diversions, fencing, signage, landscaping and environmental mitigation.
Categories
Comparable-procurement analytics
Benchmarked against retained Find a Tender procedures with CPV division 45. The category anchor is Construction work for highways, roads (45233100); this is a deliberately broad market comparator. The comparison is shown at several levels rather than pretending one company or region is always the best benchmark.
| Comparison set | Procedures | Reported bids per procedure | Named award suppliers | Price evidence |
|---|---|---|---|---|
| Market: CPV division 45 | 9,141 | 4 median · 25 average (2,065 of 9,141 with a bid count) | 3.7 average (2,271 of 9,141 with named award suppliers) | Not published |
| Same buyer | 1 | Not published | Not published | Not published |
“Reported bids” is an official aggregate, sometimes reported per lot; it is the closest available competition measure. “Named award suppliers” are winners, not all applicants.
Price-outcome signal
Not enough comparable procedures currently publish both a GBP tender value and a usable lowest-valid-bid value to calculate a responsible price-reduction benchmark. Tenderline deliberately does not infer a saving from named award suppliers or from missing award values.
Procurement strategy & market signals
Planning & early market engagement
No planning milestones published.
Related procurements
No linked framework, prior procurement or reprocurement published.
Documents & submission route
No documents are published in the current source record.
Source data inventory
Diagnostic view. “Not published” means this current release does not provide a value.
| OCID | ocds-h6vhtk-0509e3 |
|---|---|
| Latest release ID | 050073-2025 |
| Latest release timestamp | Wed Aug 20 2025 10:02:05 GMT+0000 (Coordinated Universal Time) |
| Source | find-a-tender |
| Official notice URL | Not published |
| Tender status | Not published |
| Procurement method | Not published |
| Procurement method details | Not published |
| Main procurement category | works |
| Above threshold | Not published |
| Legal basis | 32014L0024 |
| Tender period: start | Not published |
| Tender period: end | Not published |
| Expression of interest deadline | Not published |
| Enquiry deadline | Not published |
| Award period: start | Not published |
| Award period: end | Not published |
| Submission method details | Not published |
| Submission languages | Not published |
| Electronic catalogue policy | Not published |
| Total tender value | Not published |
| Tender lots in source | 0 |
| Tender items in source | 0 |
| Tender documents in source | 0 |
| Awards in latest release | 0 |
| Contracts in latest release | 0 |
| Parties in latest release | 1 |
Notice history
| Date | Event | Reference |
|---|---|---|
| 20 Aug 2025 | tenderUpdate | 050073-2025 |
| 24 Jul 2025 | tender | 042771-2025 |
| 30 Apr 2025 | planning | 017878-2025 |
All source data
Unmodified official OCDS data retained by Tenderline for this procurement process.
Complete current OCDS release JSON
{
"id": "050073-2025",
"tag": [
"tenderUpdate"
],
"date": "2025-08-20T11:02:05+01:00",
"ocid": "ocds-h6vhtk-0509e3",
"buyer": {
"id": "GB-FTS-147198",
"name": "Transport Scotland"
},
"links": [
{
"rel": "canonical",
"href": "https://api.publiccontractsscotland.gov.uk/v1/Notice?id=ocds-r6ebe6-0000804803"
}
],
"tender": {
"id": "TS/MP/WKS/2025/01",
"title": "A9 Dualling: Pitlochry to Killiecrankie project",
"amendments": [
{
"id": "1",
"description": "Noting the issues relating to staff and supplier availability during the holiday period, the period for submission will be extended by two weeks to Thursday, 18th September 2025.",
"unstructuredChanges": [
{
"where": {
"label": "Time limit",
"section": "IV.2.2"
},
"newValue": {
"date": "2025-09-18T12:00:00+01:00"
},
"oldValue": {
"date": "2025-09-04T12:00:00+01:00"
}
},
{
"where": {
"label": "Estimated date of dispatch of invitations",
"section": "IV.2.3"
},
"newValue": {
"date": "2025-11-03"
},
"oldValue": {
"date": "2025-10-20"
}
}
]
}
],
"legalBasis": {
"id": "32014L0024",
"scheme": "CELEX"
},
"description": "The Scope involves the dualling of approximately four miles (6.4km) of existing single carriageway on the A9 trunk road between Pitlochry and Killiecrankie. This consists of approximately 4km of online widening and approximately 2km of offline construction. The new/upgraded carriageway will be to Dual 2 lane All-purpose roads Sub-category c (D2APc) standard, in accordance with ‘CD 109 Highway Link Design’ within the UK Design Manual for Roads and Bridges. The project also includes (but is not limited to) construction of two grade separated junctions, construction of two left-in left-out junctions, construction of two major underbridges, demolition and replacement of three existing underbridges, an extension of one existing rail underbridge and construction of one new rail underbridge, provision of five other new underbridges/underpasses, six new retaining walls and fifteen culverts. Additionally, the project involves maintenance works at the existing Tummel underbridge, provision of traffic management, earthworks, road restraint systems, accommodation works, service diversions, fencing, signage, landscaping and environmental mitigation.",
"classification": {
"id": "45233100",
"scheme": "CPV",
"description": "Construction work for highways, roads"
},
"mainProcurementCategory": "works"
},
"parties": [
{
"id": "GB-FTS-147198",
"name": "Transport Scotland",
"roles": [
"buyer"
],
"address": {
"region": "UKM82",
"locality": "Glasgow",
"postalCode": "G2 7ER",
"countryName": "United Kingdom",
"streetAddress": "5th Floor, 177 Bothwell Street"
},
"details": {
"url": "http://www.transport.gov.scot",
"buyerProfile": "https://www.publiccontractsscotland.gov.uk/search/Search_AuthProfile.aspx?ID=AA00099"
},
"identifier": {
"legalName": "Transport Scotland"
},
"contactPoint": {
"name": "Joel Morrison",
"email": "A9Dualling@transport.gov.scot",
"telephone": "+44 1412727100"
}
}
],
"language": "en",
"initiationType": "tender"
}Complete JSON history (3 releases)
20 Aug 2025 · 050073-2025 · tenderUpdate
{
"id": "050073-2025",
"tag": [
"tenderUpdate"
],
"date": "2025-08-20T11:02:05+01:00",
"ocid": "ocds-h6vhtk-0509e3",
"buyer": {
"id": "GB-FTS-147198",
"name": "Transport Scotland"
},
"links": [
{
"rel": "canonical",
"href": "https://api.publiccontractsscotland.gov.uk/v1/Notice?id=ocds-r6ebe6-0000804803"
}
],
"tender": {
"id": "TS/MP/WKS/2025/01",
"title": "A9 Dualling: Pitlochry to Killiecrankie project",
"amendments": [
{
"id": "1",
"description": "Noting the issues relating to staff and supplier availability during the holiday period, the period for submission will be extended by two weeks to Thursday, 18th September 2025.",
"unstructuredChanges": [
{
"where": {
"label": "Time limit",
"section": "IV.2.2"
},
"newValue": {
"date": "2025-09-18T12:00:00+01:00"
},
"oldValue": {
"date": "2025-09-04T12:00:00+01:00"
}
},
{
"where": {
"label": "Estimated date of dispatch of invitations",
"section": "IV.2.3"
},
"newValue": {
"date": "2025-11-03"
},
"oldValue": {
"date": "2025-10-20"
}
}
]
}
],
"legalBasis": {
"id": "32014L0024",
"scheme": "CELEX"
},
"description": "The Scope involves the dualling of approximately four miles (6.4km) of existing single carriageway on the A9 trunk road between Pitlochry and Killiecrankie. This consists of approximately 4km of online widening and approximately 2km of offline construction. The new/upgraded carriageway will be to Dual 2 lane All-purpose roads Sub-category c (D2APc) standard, in accordance with ‘CD 109 Highway Link Design’ within the UK Design Manual for Roads and Bridges. The project also includes (but is not limited to) construction of two grade separated junctions, construction of two left-in left-out junctions, construction of two major underbridges, demolition and replacement of three existing underbridges, an extension of one existing rail underbridge and construction of one new rail underbridge, provision of five other new underbridges/underpasses, six new retaining walls and fifteen culverts. Additionally, the project involves maintenance works at the existing Tummel underbridge, provision of traffic management, earthworks, road restraint systems, accommodation works, service diversions, fencing, signage, landscaping and environmental mitigation.",
"classification": {
"id": "45233100",
"scheme": "CPV",
"description": "Construction work for highways, roads"
},
"mainProcurementCategory": "works"
},
"parties": [
{
"id": "GB-FTS-147198",
"name": "Transport Scotland",
"roles": [
"buyer"
],
"address": {
"region": "UKM82",
"locality": "Glasgow",
"postalCode": "G2 7ER",
"countryName": "United Kingdom",
"streetAddress": "5th Floor, 177 Bothwell Street"
},
"details": {
"url": "http://www.transport.gov.scot",
"buyerProfile": "https://www.publiccontractsscotland.gov.uk/search/Search_AuthProfile.aspx?ID=AA00099"
},
"identifier": {
"legalName": "Transport Scotland"
},
"contactPoint": {
"name": "Joel Morrison",
"email": "A9Dualling@transport.gov.scot",
"telephone": "+44 1412727100"
}
}
],
"language": "en",
"initiationType": "tender"
}24 Jul 2025 · 042771-2025 · tender
{
"id": "042771-2025",
"tag": [
"tender"
],
"date": "2025-07-24T13:42:50+01:00",
"ocid": "ocds-h6vhtk-0509e3",
"buyer": {
"id": "GB-FTS-147198",
"name": "Transport Scotland"
},
"links": [
{
"rel": "canonical",
"href": "https://api.publiccontractsscotland.gov.uk/v1/Notice?id=ocds-r6ebe6-0000804803"
}
],
"tender": {
"id": "TS/MP/WKS/2025/01",
"lots": [
{
"id": "1",
"value": {
"amount": 205000000,
"currency": "GBP"
},
"status": "active",
"hasOptions": false,
"hasRenewal": false,
"description": "Transport Scotland is an agency of the Scottish Government and contracts in the name of and on behalf of the Scottish Ministers. Transport Scotland has identified the requirement to appoint a suitably experienced Contractor to design & build a new dual carriageway from a point approximately 1km south of the existing Tummel underbridge near Pitlochry, to the southern end of the existing dual carriageway at the Pass of Killiecrankie.\nThe contract will include a 260 week period of maintenance after completion of the main works and a 260 week period of landscape establishment following completion of landscape planting. The Contractor will not be required to carry out cyclic maintenance, which shall be carried out by a third party appointed by the Scottish Ministers.\nThe Contractor will be procured through a Competitive Dialogue procedure, in accordance with the Public Contracts (Scotland) Regulations 2015. Transport Scotland will manage the proposed procurement process for the A9 Dualling Pitlochry to Killiecrankie Contract on behalf of the Scottish Ministers.\nIn the event of a Contract award, the Contract will be entered into between the Scottish Ministers and the successful tenderer.\nThe procurement process leading to the award of the Contract will comprise the following:\n1. Prequalification (SPD) (approx. 6 weeks)\n2. Competitive Dialogue (approx. 33 weeks)\n3. Tender (approx. 6 weeks)\n4. Award\nDetailed information regarding the award process and award criteria for the tender phase will be supplied to economic operators who are invited to participate in dialogue.\nTransport Scotland shall notify Participants when the Competitive Dialogue phase has concluded and invite the Participants who have presented an acceptable solution to submit a final tender.\nThe form of contract is to be an NEC4 Engineering and Construction Contract (ECC) Option A: priced contract with activity schedule with amendments. Additionally, there will be an employer’s design with a re-measurable bill of quantities for maintenance works associated with the existing Tummel Bridge.\nContract documentation will be provided at Invitation to Participate in Dialogue (ITPD) stage to shortlisted participants, however the DRAFT conditions of contract will be made available for all economic operators to review within the Information Pack. Refer to Section VI.3) for further information on how to access to the Information Pack.\nTransport Scotland is providing a DRAFT of its conditions of contract to ensure prospective economic operators are informed as early as possible of the contract. The DRAFT conditions of contract are subject to change and no obligation, liability, duty of care or responsibility to any party is created by or shall arise out of this.\nSelected Participants, following the Competitive Dialogue stage, shall be invited to submit a final tender on the same contract terms and conditions.\nTo be considered for the prequalification stage, economic operators are required to complete and submit a Single Procurement Document (SPD) in accordance with this Contract Notice and the Supplementary Information Document (SID) which can be accessed via the Additional Documents located within the Additional Notice Options, this can be downloaded via the Public Contracts Scotland portal (www.publiccontractsscotland.gov.uk).\nEconomic operators shall be evaluated in accordance with the Public Contracts (Scotland) Regulations 2015, on the basis of the information they have provided within the SPD.\nIt is intended that the Contract will include the design and construction of the works which will last approximately 195 weeks, followed by a 260 week period of maintenance including defect correction and establishment of landscaping. Additional information: Economic operators who initially meet but then subsequently fails to meet the objective criteria, prior to contract award, shall be excluded. Economic operators may be excluded from this competition if they are in any of the situations referred to in regulation 58 of the Public Contracts (Scotland) Regulations 2015.",
"secondStage": {
"maximumCandidates": 4,
"minimumCandidates": 4
},
"awardCriteria": {
"criteria": [
{
"name": "Including approach to delivery & management, technical aspects, construction, commercial, risk and sustainability aspects of the project.",
"type": "quality",
"description": "50"
},
{
"name": "Further information on scoring of the prices can be found in the Supplementary Information Document.",
"type": "cost",
"description": "50"
}
]
},
"contractPeriod": {
"durationInDays": 3150
},
"submissionTerms": {
"variantPolicy": "allowed"
},
"selectionCriteria": {
"description": "It is intended that a maximum of 4 economic operators be taken forward to participate in dialogue. These economic operators shall be those who have:\n(i) submitted a compliant submission, comprising the completed SPD;\n(ii) satisfied the relevant selection criteria under the exclusion grounds;\n(iii) met the following criteria:\na) Minimum Standards of Eligibility – provided evidence of working on specified types of projects over a specified value;\nb) Technical or Professional Ability – provided evidence demonstrating an acceptable level of technical or professional ability; and\nc) Educational and Professional Qualification – possess the necessary educational and professional qualifications to perform the requirement.\n(iv) in place quality, environmental and health and safety management systems;\n(v) in place appropriate sustainability measures attributing significantly to the requirement;\n(vi) satisfied minimum standards of economic and financial standing;\n(vii) appropriate experience in acting as the ‘Principal Contractor’ and ‘Principal Designer’ under the Construction (Design and Management) Regulations 2015 or equivalent; and\n(viii) achieved the first, second, third or fourth highest combined weighted scores in respect of technical or professional ability calculated in accordance with the responses to Statements (d) to (h) inclusive (refer to Section III.1.3).\nHowever, if any economic operator has not submitted a compliant submission as described in (i) above, failed in respect of either (ii), (iii), (iv), (v), (vi) or (vii) above, then that economic operator shall be excluded from the ranking of the scores described in (viii) as above.\nFollowing evaluation of the SPD responses in accordance with the evaluation criteria set out in (i) to (viii) above, it is intended that the four economic operators with the highest scoring compliant bids will be invited to participate in dialogue. The four economic operators with the highest scoring compliant bids will be required to confirm that they wish to participate in dialogue, prior to issue of the ITPD. Should one or more of such economic operators not provide such confirmation or no longer wish to participate in the process, then the next highest ranking economic operator(s) may be invited to participate in dialogue.\nIn terms of the Public Contracts (Scotland) Regulations 2015, there will be a requirement on economic operators to provide proof of economic and financial standing and of technical and professional ability prior to proceeding to the next stage of the competition and contract award, and the tender documents will contain specific provisions requiring tenderers to inform Transport Scotland of any changes to their economic and financial standing or technical and professional ability during the procurement competition.\nFurther, Transport Scotland reserves the right to undertake verification to ensure continuing compliance with the selection criteria at any time prior to proceeding to the next stage of the competition and contract award, including during any standstill period. If means of proof does not satisfy Transport Scotland’s selection criteria and/or if an economic operator no longer meets the requirements set out in the tender documents, it shall be excluded from this procurement competition. If this follows tender evaluation, including during any standstill period, the next ranked most economically advantageous tenderer shall be requested to provide proof of economic and financial standing and technical and professional ability with a view to contract award."
}
}
],
"items": [
{
"id": "1",
"relatedLot": "1",
"deliveryLocation": {
"description": "A9 trunk road from a point approximately 1km south of the existing Tummel underbridge, to the southern end of the existing dual carriageway at the Pass of Killiecrankie."
},
"deliveryAddresses": [
{
"region": "UKM77"
}
],
"additionalClassifications": [
{
"id": "45111000",
"scheme": "CPV",
"description": "Demolition, site preparation and clearance work"
},
{
"id": "45221220",
"scheme": "CPV",
"description": "Culverts"
},
{
"id": "45221111",
"scheme": "CPV",
"description": "Road bridge construction work"
},
{
"id": "45221112",
"scheme": "CPV",
"description": "Railway bridge construction work"
},
{
"id": "45233120",
"scheme": "CPV",
"description": "Road construction works"
},
{
"id": "45233124",
"scheme": "CPV",
"description": "Trunk road construction work"
},
{
"id": "45233125",
"scheme": "CPV",
"description": "Road junction construction work"
},
{
"id": "45233161",
"scheme": "CPV",
"description": "Footpath construction work"
},
{
"id": "45233162",
"scheme": "CPV",
"description": "Cycle path construction work"
},
{
"id": "45233224",
"scheme": "CPV",
"description": "Dual carriageway construction work"
},
{
"id": "45233226",
"scheme": "CPV",
"description": "Access road construction work"
},
{
"id": "45233290",
"scheme": "CPV",
"description": "Installation of road signs"
},
{
"id": "45262640",
"scheme": "CPV",
"description": "Environmental improvement works"
},
{
"id": "45233222",
"scheme": "CPV",
"description": "Paving and asphalting works"
},
{
"id": "45112000",
"scheme": "CPV",
"description": "Excavating and earthmoving work"
},
{
"id": "45112730",
"scheme": "CPV",
"description": "Landscaping work for roads and motorways"
},
{
"id": "45233128",
"scheme": "CPV",
"description": "Roundabout construction work"
},
{
"id": "45233280",
"scheme": "CPV",
"description": "Erection of road-barriers"
},
{
"id": "45246200",
"scheme": "CPV",
"description": "Riverbank protection works"
},
{
"id": "45316210",
"scheme": "CPV",
"description": "Installation of traffic monitoring equipment"
},
{
"id": "45454100",
"scheme": "CPV",
"description": "Restoration work"
},
{
"id": "50230000",
"scheme": "CPV",
"description": "Repair, maintenance and associated services related to roads and other equipment"
},
{
"id": "45316110",
"scheme": "CPV",
"description": "Installation of road lighting equipment"
}
]
}
],
"title": "A9 Dualling: Pitlochry to Killiecrankie project",
"value": {
"amount": 205000000,
"currency": "GBP"
},
"status": "active",
"coveredBy": [
"GPA"
],
"legalBasis": {
"id": "32014L0024",
"scheme": "CELEX"
},
"description": "The Scope involves the dualling of approximately four miles (6.4km) of existing single carriageway on the A9 trunk road between Pitlochry and Killiecrankie. This consists of approximately 4km of online widening and approximately 2km of offline construction. The new/upgraded carriageway will be to Dual 2 lane All-purpose roads Sub-category c (D2APc) standard, in accordance with ‘CD 109 Highway Link Design’ within the UK Design Manual for Roads and Bridges. The project also includes (but is not limited to) construction of two grade separated junctions, construction of two left-in left-out junctions, construction of two major underbridges, demolition and replacement of three existing underbridges, an extension of one existing rail underbridge and construction of one new rail underbridge, provision of five other new underbridges/underpasses, six new retaining walls and fifteen culverts. Additionally, the project involves maintenance works at the existing Tummel underbridge, provision of traffic management, earthworks, road restraint systems, accommodation works, service diversions, fencing, signage, landscaping and environmental mitigation.",
"secondStage": {
"invitationDate": "2025-10-20T00:00:00+01:00"
},
"tenderPeriod": {
"endDate": "2025-09-04T12:00:00+01:00"
},
"contractTerms": {
"performanceTerms": "It is the Client’s policy to measure the performance of the Contractor on a regular basis.\nIn the event that the Contractor’s performance falls below a satisfactory level, the Contractor will be invited to determine a means of rectifying the situation. Repeated or continual performance failures may result in suspension or termination of the contract.",
"hasElectronicPayment": true,
"hasElectronicOrdering": true,
"electronicInvoicingPolicy": "allowed"
},
"hasRecurrence": false,
"classification": {
"id": "45233100",
"scheme": "CPV",
"description": "Construction work for highways, roads"
},
"submissionTerms": {
"languages": [
"en"
],
"bidValidityPeriod": {
"durationInDays": 90
}
},
"submissionMethod": [
"electronicSubmission"
],
"otherRequirements": {
"requiresStaffNamesAndQualifications": true
},
"procurementMethod": "selective",
"selectionCriteria": {
"criteria": [
{
"type": "suitability",
"appliesTo": [
"supplier"
],
"description": "The relevant selection criteria will be included in the SPD Scotland module and Supplementary Information Document which can be found in the Additional Documents, within the Additional Notice Options of the Public Contracts Scotland portal (www.publiccontractsscotland.gov.uk)\nEconomic operators must be enrolled in the relevant professional or trade registers kept in the Member state of its establishment (as described in Schedule 5 of the Public Contracts (Scotland) Regulations 2015) (i.e., registered under Companies House). Economic operators should provide details under SPD Question Ref. 4A.1.\nAccreditation\nEconomic operators or their appropriate subcontractors must be accredited under National Highway Sector Scheme (NHSS). The relevant NHSS accreditations are included within the section VI.3 of the Supplementary Information Document.\nEconomic operators who are not accredited shall not progress beyond the assessment selection stage.\nEconomic operators must provide confirmation of the required accreditations under SPD Question Ref. 4D.1, in accordance with the requirements of this Contract Notice.\nStaff\nThe successful tenderer shall be required to comply with the CDM Regulations (2015) and to comply with all other relevant health and safety law. Additionally, all site staff are to be accredited under the Construction Skills Construction Safety Scheme (CSCS) or equivalent.\nStandards and Specification\nSubject to the other provisions of the Contract, the standards and specifications which the Contractor shall comply with include:\n- UK Department for Transport Standards for Highways, specifically:\n- Design Manual for Roads and Bridges (DMRB)\n- Manual of Contract Documents for Highway Works (MCHW)\n- Transport Scotland Interim Amendments (TSIA)\n- SCOTS National Roads Development Guide\n- Eurocodes along with UK National Annexes (NA)\n- BS EN and BS EN ISO standards relevant to the works\n- BS Code of Practices relevant to the works\n- Other Non-Conflicting Complementary Information (NCCI) relevant to the works\nIt is the intention that the completed scheme shall be BIM Level 2 compliant at the handover of the built asset. The handover of the built asset shall include the Level 2 BIM output along with the requisite ‘as constructed’ information, the Health & Safety File and the Operation & Maintenance manuals.\nThe BIM Level 2 requirements at the handover of the built asset will be in compliance with ISO 19650 as prescribed in the Scope which will be provided upon commencement of the competitive dialogue process.\nQualifications and Experience\nIt is a requirement of the Contract that staff employed under the Contract shall have minimum levels of experience, education and professional qualifications. In particular, the Designer and the Designer’s site representative shall have staff who are Chartered professionals (or equivalent) who will perform the Design in accordance with the appropriate standards and specification and, coupled with the relevant experience of site supervision as a Designer’s Site Representative, supervise the design, construction, completion and maintenance process.\nConstruction (Design and Management) Regulations 2015 (CDM 2015)\nIt is intended that, the successful tenderer shall fulfil the duties of Principal Contractor and Principal Designer under CDM 2015. Therefore, economic operators shall be required to satisfy the Scottish Ministers as to their competence, resources and willingness to be appointed as Principal Contractor and Principal Designer and fulfil those duties in accordance with CDM 2015 (refer to III.1.3)."
},
{
"type": "economic",
"minimum": "Economic operators shall be required to satisfy minimum standards of economic and financial standing. These are described below:\nEvaluation Criteria Ratios (SPD Question Ref. 4B.6)\nThe following nine evaluation criteria shall be scored, for each year of the last two years of trading, or for the period which is available if trading for less than two years:\n1. Acid Test Ratio\n2. Cash Interest Cover Ratio\n3. Return on Capital Employed\n4. Operating Profit Ratio\n5. Net Worth\n6. Gearing\n7. Annual Contract Value to Turnover\n8. Filed Accounts\n9. Audit Report\nThe scoring mechanism can be located within the Supplementary Information Document and downloaded via the Additional Documents, located within the Additional Notice Options of the Public Contracts Scotland portal (www.publiccontractsscotland.gov.uk). For the purpose of calculating the Annual Contract Value to Turnover ratio the estimated value in II.2.6 of this Contract Notice shall be adopted. Similarly, for the purposes of this ratio, the duration of the contract (construction phase) shall be approximately 4 years. This equates to an estimated value of 51,000,000 GBP per annum for the initial construction phase, followed by an estimated value of 200,000 GBP per annum for the subsequent maintenance phase (60 months).\nThe nine evaluation criteria will be individually scored and given a total aggregated score, out of a possible 50 marks, for each year of trading. Subsequently, each year’s score will be weighted, with the most recent (“Year 1”) weighted at 2/3rds and the previous (“Year 2”) weighted at 1/3rd, and then aggregated to form an overall score for the two years out of 50 marks.\nIf the economic operator is trading for less than 2 years, their financial ratios for the most recent full year of trading will be weighted at 2/3rds scored out of the total 50 marks. If the economic operator is trading for less than 1 year the information provided under III.1.2) b), will be prorated up to 1 year to calculate financial ratios for the full year and this will be weighted at 2/3rds and scored out of the total 50 marks.\nA submission shall be marked as a FAIL and will not be considered further if the score achieved by an economic operator (either a single economic operator or a group of economic operators) is less than 25 marks, out of the potential total aggregated score of 50 marks.\nA submission shall be marked as a FAIL and will not be considered further if the economic operator is unable to provide appropriate information to enable the calculation of the financial ratios.\nWhere the submission has been submitted by a group of economic operators, the information submitted by each group member will be evaluated in the proportion of the percentage shareholdings or percentage equity/interest of each group member and a score determined for such group of economic operators on that basis.\nA “group of economic operators” is defined as an unincorporated consortium or joint venture.\nInsurance (SPD Question Ref. 4B.5)\nIn response to SPD Question Ref. 4B.5, economic operators must confirm they already have or can commit to obtain, prior to the commencement, the following levels of insurance:\nProfessional Indemnity Insurance = GBP 10 million\nPublic Liability Insurance = GBP 155 million\nEmployer’s (Compulsory) Liability Insurance = GBP 10 million\nIn responding to SPD Question Ref. 4B.5, where the economic operator responds “No, and I cannot commit to obtain it” they shall be marked as FAIL and shall be excluded from this procurement competition.",
"appliesTo": [
"supplier"
],
"description": "Economic operators shall be required to satisfy minimum standards of economic and financial standing. To determine these standards, economic operators shall:\na) in response to SPD Question Ref. 4B1a, provide the specified annual turnover for the last two years of trading, or for the period which is available if trading for less than two years;\nb) in response to SPD Question Ref. 4B.6, provide the name, range and score of nine financial criteria for each year for the last two years of trading, or for the period which is available if trading for less than two years; and\nc) in response to SPD Question Ref. 4B.5, confirm they already have or can commit to obtain, prior to commencement of the contract, the required levels of insurance.\nIn addition to the information requested under (a) to (c), economic operators must provide a link / copies of the associated annual accounts as filed at Companies House (or equivalent if not a UK registered company). For the avoidance of doubt, if an economic operator fails to provide accounts relating to its last two full years of trading that are due to have been filed, that economic operator will be excluded from this procurement competition.\nWhere economic operators have not yet been trading for a full two year period, such that filed accounts are not yet due and available, and limited only to that circumstance, the required information to support (a) to (c) above may take the form of appropriate third party / statements setting out turnover, profit and loss, cashflow (current and forecast) and the economic operator’s credit facility position. Note there will, however, be a negative scoring implication as noted below and in the Additional Documents.\nThis information has been requested to enable Transport Scotland to perform their own assessment and confirm the financial ratios submitted. Ultimately, ensuring the correct score is allocated, and to ensure no misinterpretation. Where there exist differences in ratios, between those provided and those calculated by Transport Scotland, clarification will be sought."
},
{
"type": "technical",
"appliesTo": [
"supplier"
],
"description": "The relevant selection criteria will be included in the SPD Scotland module and Supplementary Information Document which can be found\nin the Additional Documents, within the Additional Notice Options of the Public Contracts Scotland portal (www.publiccontractsscotland.gov.uk)"
}
]
},
"mainProcurementCategory": "works",
"submissionMethodDetails": "http://www.publiccontractsscotland.gov.uk",
"procurementMethodDetails": "Competitive dialogue"
},
"parties": [
{
"id": "GB-FTS-147198",
"name": "Transport Scotland",
"roles": [
"buyer",
"centralPurchasingBody"
],
"address": {
"region": "UKM82",
"locality": "Glasgow",
"postalCode": "G2 7ER",
"countryName": "United Kingdom",
"streetAddress": "5th Floor, 177 Bothwell Street"
},
"details": {
"url": "http://www.transport.gov.scot",
"buyerProfile": "https://www.publiccontractsscotland.gov.uk/search/Search_AuthProfile.aspx?ID=AA00099",
"classifications": [
{
"id": "NATIONAL_AGENCY",
"scheme": "TED_CA_TYPE",
"description": "National or federal agency/office"
},
{
"scheme": "COFOG",
"description": "Transport "
}
]
},
"identifier": {
"legalName": "Transport Scotland"
},
"contactPoint": {
"url": "http://www.publiccontractsscotland.gov.uk",
"name": "Joel Morrison",
"email": "A9Dualling@transport.gov.scot",
"telephone": "+44 1412727100"
}
},
{
"id": "GB-FTS-8771",
"name": "Sheriff Clerk’s Office",
"roles": [
"reviewBody"
],
"address": {
"locality": "Glasgow",
"countryName": "United Kingdom",
"streetAddress": "PO Box 23, 1 Carlton Place"
},
"identifier": {
"legalName": "Sheriff Clerk’s Office"
},
"contactPoint": {
"email": "Glasgow@scotcourts.gov.uk",
"telephone": "+44 1414298888"
}
}
],
"language": "en",
"description": "To be considered for this procurement competition, Economic Operators should complete an SPD through the Public Contract Scotland portal and submit the completed SPD in accordance with the timescales specified in this notice.\nPlease note there are minimum requirements concerning Cyber Security for this contract. If successful, it is expected that the Economic Operators will commit to holding a valid Cyber Essentials certificate, if not already held.\nEconomic operators will be asked to confirm that they will pay staff based in the UK that are involved in the delivery of this Contract at least the real Living Wage.\nA project Information Pack will be made available to all prospective economic operators who have requested access on 31 July 2025.\nDetail on the Information Pack is contained in the Supplementary Information Document. This information is supplied without warranty and Transport Scotland shall be under no liability for any error, misstatement or omission of such information. To register to obtain access to this Information Pack Prospective economic operators are requested to contact A9Dualling@transport.gov.scot.\nPlease refer to the Supplementary Information Document for full additional information.\nDetails of community benefit provisions will be made available at ITPD stage to shortlisted participants.\nNOTE: To register your interest in this notice and obtain any additional information please visit the Public Contracts Scotland Web Site at https://www.publiccontractsscotland.gov.uk/Search/Search_Switch.aspx?ID=804803.\nThe buyer has indicated that it will accept electronic responses to this notice via the Postbox facility. A user guide is available at https://www.publiccontractsscotland.gov.uk/sitehelp/help_guides.aspx.\nSuppliers are advised to allow adequate time for uploading documents and to dispatch the electronic response well in advance of the closing time to avoid any last minute problems.\nA sub-contract clause has been included in this contract. For more information see: http://www.publiccontractsscotland.gov.uk/info/InfoCentre.aspx?ID=2363\nCommunity benefits are included in this requirement. For more information see: https://www.gov.scot/policies/public-sector-procurement/community-benefits-in-procurement/\nA summary of the expected community benefits has been provided as follows:\nThe appointed Contractor will be required to deliver Community Benefits in support of the authority’s economic, social and environmental objectives. The project aims to facilitate the involvement of Small and Medium sized Enterprises (SMEs), third sector bodies and supported businesses, as well as offering employment and training opportunities, and promoting innovation in line with our sustainable procurement duty under the Procurement Reform (Scotland) Act 2014. The project will encourage good quality and fair work and a Contractors approach to fair work practices will be assessed as part of this procurement and monitored under the contract.\n(SC Ref:804803)\nDownload the ESPD document here: https://www.publiccontractsscotland.gov.uk/ESPD/ESPD_Download.aspx?id=804803",
"initiationType": "tender"
}30 Apr 2025 · 017878-2025 · planning
{
"id": "017878-2025",
"tag": [
"planning"
],
"date": "2025-04-30T10:56:16+01:00",
"ocid": "ocds-h6vhtk-0509e3",
"buyer": {
"id": "GB-FTS-145640",
"name": "Transport Scotland"
},
"links": [
{
"rel": "canonical",
"href": "https://api.publiccontractsscotland.gov.uk/v1/Notice?id=ocds-r6ebe6-0000797491"
}
],
"tender": {
"id": "TS/MP/WKS/2025/01",
"lots": [
{
"id": "1",
"status": "planned",
"description": "Transport Scotland is an agency of the Scottish Government and contracts in the name of and on behalf of the Scottish Ministers. Transport Scotland has identified the requirement to appoint a suitably experienced Contractor to design and build a new dual carriageway from a point approximately 1km south of the existing Tummel underbridge, to the southern end of the existing dual carriageway at the Pass of Killiecrankie.\nTransport Scotland will conduct the proposed procurement process on behalf of the Scottish Ministers in accordance with the Public Contract (Scotland) Regulations 2015. In the event of a contract award, the contract will be entered into between the Scottish Ministers and the successful tenderer. The contract will include a 260 week period of defects and maintenance after completion of the main works and a 260 week period of landscape establishment following completion of landscape planting. The successful tenderer will not be required to carry out cyclic maintenance, which shall be carried out by a third party appointed by the Scottish Ministers. In the event of a contract award, the appointed contractor and the applicable subcontractors shall be required to enter into a Project Bank Account Trust Agreement. The Project Bank Account will be used by Transport Scotland to make payments. Further guidance can be obtained via the following link: http://www.gov.scot/Topics/Government/Procurement/policy/ReviewProcConst/projectbankaccounts\nIn line with the National Transport Strategy in Scotland, the project aims to build a lasting legacy and encourage economic growth by offering a significant opportunity to improve the social, environmental and economic wellbeing of the area in which it operates, with a particular focus on reducing inequality. The appointed Contractor will be required to deliver Community Benefits in support of the authority’s economic, social and environmental objectives. The project aims to facilitate the involvement of Small and Medium sized Enterprises (SMEs), third sector bodies and supported businesses, as well as offering employment and training opportunities, and promoting innovation in line with our sustainable procurement duty under the Procurement Reform (Scotland) Act 2014. The project will encourage good quality and fair work and a Contractors approach to fair work practices will be assessed as part of this procurement and monitored under the contract. Additional information: The Contractor will be procured through a competitive dialogue procedure, in accordance with the Public Contracts (Scotland) Regulations 2015. Economic operators may be excluded from this competition if they are in any of the situations referred to in regulation 58 of the Public Contracts (Scotland) Regulations 2015."
}
],
"items": [
{
"id": "1",
"relatedLot": "1",
"deliveryLocation": {
"description": "A9 trunk road from a point approximately 1km south of the existing Tummel underbridge, to the southern end of the existing dual carriageway at the Pass of Killiecrankie."
},
"deliveryAddresses": [
{
"region": "UKM77"
}
],
"additionalClassifications": [
{
"id": "45111000",
"scheme": "CPV",
"description": "Demolition, site preparation and clearance work"
},
{
"id": "45221220",
"scheme": "CPV",
"description": "Culverts"
},
{
"id": "45221111",
"scheme": "CPV",
"description": "Road bridge construction work"
},
{
"id": "45221112",
"scheme": "CPV",
"description": "Railway bridge construction work"
},
{
"id": "45233120",
"scheme": "CPV",
"description": "Road construction works"
},
{
"id": "45233124",
"scheme": "CPV",
"description": "Trunk road construction work"
},
{
"id": "45233125",
"scheme": "CPV",
"description": "Road junction construction work"
},
{
"id": "45233161",
"scheme": "CPV",
"description": "Footpath construction work"
},
{
"id": "45233162",
"scheme": "CPV",
"description": "Cycle path construction work"
},
{
"id": "45233224",
"scheme": "CPV",
"description": "Dual carriageway construction work"
},
{
"id": "45233226",
"scheme": "CPV",
"description": "Access road construction work"
},
{
"id": "45233290",
"scheme": "CPV",
"description": "Installation of road signs"
},
{
"id": "45262640",
"scheme": "CPV",
"description": "Environmental improvement works"
},
{
"id": "45233222",
"scheme": "CPV",
"description": "Paving and asphalting works"
},
{
"id": "45112000",
"scheme": "CPV",
"description": "Excavating and earthmoving work"
},
{
"id": "45112730",
"scheme": "CPV",
"description": "Landscaping work for roads and motorways"
},
{
"id": "45233128",
"scheme": "CPV",
"description": "Roundabout construction work"
},
{
"id": "45233280",
"scheme": "CPV",
"description": "Erection of road-barriers"
},
{
"id": "45246200",
"scheme": "CPV",
"description": "Riverbank protection works"
},
{
"id": "45316210",
"scheme": "CPV",
"description": "Installation of traffic monitoring equipment"
},
{
"id": "45454100",
"scheme": "CPV",
"description": "Restoration work"
},
{
"id": "45316110",
"scheme": "CPV",
"description": "Installation of road lighting equipment"
}
]
}
],
"title": "A9 Dualling: Pitlochry to Killiecrankie",
"value": {
"amount": 205000000,
"currency": "GBP"
},
"status": "planned",
"coveredBy": [
"GPA"
],
"legalBasis": {
"id": "32014L0024",
"scheme": "CELEX"
},
"description": "The Scope involves the design, construction, completion and landscape maintenance of the proposed A9 Dualling: Pitlochry to Killiecrankie project.\nThe project will be the fifth section of the A9 Dualling Programme to be constructed, which aims to improve the operational performance of the A9, improve safety for motorised and non-motorised users, facilitate active travel within the corridor, and improve integration with Public Transport Facilities. The objectives are to be met whilst avoiding and/or reducing environmental impacts, enhancing the environment and improving sustainability where possible.\nThe Project involves the dualling of approximately four miles (6.4km) of existing single carriageway. This consists of approximately 4km of online widening and approximately 2km of offline construction. The project commences approximately 1km south of the existing Tummel underbridge and ends at the existing dual carriageway at the Pass of Killiecrankie. This section of the A9 is located in a rural area within close proximity to a number of designated environmental sites, such as the River Tay Special Area of Conservation (SAC) including the River Tummel and Loch Faskally, which are crossed by the existing A9.\nIn particular, the project involves, but is not limited to:\n-\tWidening of existing A9 single carriageway to Dual 2 lane All-purpose roads Sub-category c (D2APc) standard, in accordance with ‘CD 109 Highway Link Design’ within the UK Design Manual for Roads and Bridges.\n-\tUpgrades to the existing Pitlochry South Junction and Pitlochry North at-grade Junction to fully grade separated junctions.\n-\tConstruction of two left-in left-out junctions at C452 Foss Road and C452 Clunie-Foss Road.\n-\tUpgrade to side roads including resurfacing or realignment and other improvements.\n-\tConstruction of access roads to rural properties and businesses, including a further two left-in/left-out junctions onto the A9 with one at Pitlochry Estate and one at Kennel Cottage.\n-\tA Type-A Lay-by, which will provide physical segregation between the main carriageway and the lay-by, located on the northbound side of the A9, near the Tummel underbridge.\n-\tDemolition and replacement of three existing underbridges; Clunie-Foss Bridge, Foss Road Bridge and Craighulan Bridge.\n-\tA new underbridge at the River Tummel (Tummel underbridge) to accommodate the proposed A9 northbound carriageway.\n-\tA new underbridge at Loch Faskally (Clunie underbridge) to accommodate the proposed A9 southbound carriageway.\n-\tAn extension of one existing rail underbridge and one new rail underbridge.\n-\tProvision of five other new underbridges/underpasses, six new retaining walls and 15 culverts.\n-\tBearing replacement and concrete repairs to piers at the existing Tummel underbridge.\n-\tEarthworks, including excavation of rock.\n-\tReplacement and/or upgrade to a number of existing structures including culverts and Sustainable Drainage Systems (SuDS) developed in consultation with Scottish Environment Protection Agency (SEPA).\n-\tProvision of traffic management, road restraint systems, accommodation works, service diversions, fencing, signage, landscaping and environmental mitigation.",
"communication": {
"futureNoticeDate": "2025-07-14T00:00:00+01:00"
},
"classification": {
"id": "45233100",
"scheme": "CPV",
"description": "Construction work for highways, roads"
},
"mainProcurementCategory": "works"
},
"parties": [
{
"id": "GB-FTS-145640",
"name": "Transport Scotland",
"roles": [
"buyer",
"centralPurchasingBody"
],
"address": {
"region": "UKM82",
"locality": "Glasgow",
"postalCode": "G2 7EQ",
"countryName": "United Kingdom",
"streetAddress": "5th Floor, 177 Bothwell Street"
},
"details": {
"url": "http://www.transport.gov.scot",
"buyerProfile": "https://www.publiccontractsscotland.gov.uk/search/Search_AuthProfile.aspx?ID=AA00099",
"classifications": [
{
"id": "NATIONAL_AGENCY",
"scheme": "TED_CA_TYPE",
"description": "National or federal agency/office"
},
{
"scheme": "COFOG",
"description": "Transport"
}
]
},
"identifier": {
"legalName": "Transport Scotland"
},
"contactPoint": {
"email": "pdc@transport.gov.scot",
"telephone": "+44 1412727100"
}
}
],
"language": "en",
"description": "Transport Scotland will contact interested contractors to participate in pre-procurement market consultation questionnaire at the beginning of May, ahead of the procurement exercise commencing.\nTransport Scotland expects to hold a ‘virtual industry event’ in June 2025 which will provide interested parties with an opportunity to better understand the scope of the contract and the procurement ahead of the process commencing. Further details including the format and date of the virtual industry event will be provided when available on http://www.publiccontractsscotland.gov.uk/ .\nTransport Scotland and the Scottish Ministers shall have no liability for any costs however incurred by those attending the virtual industry event, attendance at subsequent meetings, or involvement in the procurement competition.\nDirect or indirect canvassing of any Transport Scotland official concerning this procurement, or any attempt to procure information from any Transport Scotland official concerning this Prior Information Notice (PIN) outside of the formal process described in this document may result in the disqualification of the supplier from this procurement, and consideration in any future procurement activity. No information contained in this document or in any communication made between Transport Scotland and any supplier in connection with this document shall be relied upon as constituting a contract, agreement or representation that any contract shall be offered in accordance with this document.\nNOTE: To register your interest in this notice and obtain any additional information please visit the Public Contracts Scotland Web Site at https://www.publiccontractsscotland.gov.uk/Search/Search_Switch.aspx?ID=797491.\n(SC Ref:797491)",
"initiationType": "tender"
}