Official UK procurement notice
2024-133 RIIO-3 Independent Technical Adviser
Authority: Ofgem (Public body)
What is being bought
Published requirement descriptionOfgem is seeking to appoint up to three organisations to fulfil the role of Independent Technical Adviser (ITA) as part of a framework agreement. The ITA will be an independent body responsible for providing assurance to Ofgem on the design, procurement, cost and overall delivery of selected load‑related projects across all electricity Transmission Owners (TOs). The objective of ITA assurance is to support enhanced and accelerated regulatory decision‑making and processes.
CPV: Consultative engineering and construction services · Technical analysis or consultancy services
How this framework works
From the published notice- Type
- Closed framework
- Call-offs
- call-offs may be awarded directly or by further competition
- Places
- up to 3 suppliers · 10 bids received (3.3 per place) · 3 appointed (full)
- Framework period
5 yrs from 30 Jun 2026, Ofgem are looking to operate a Framework Agreement that will have a duration of five years as opposed to four, with the later typical under the Procurement Act 2023. Given the nature of the services required of the ITA means that a longer term is required. This is because aligning closely with the RIIO-3 price control term length (eg RIIO-3 April 2026-March 2031) offers practical benefits to the services being provided by the ITA, primarily, improved clarity to relevant stakeholders regarding what can be expected across the entire price control.
Published description of the framework
Ofgem may at any time during the Term require the ITA to provide a quotation for services under the Framework Scope to enable Ofgem to:
- enter into a Call-Off Contract with the ITA without further competition pursuant to clause 4 (a “Direct Call-Off”); or
- evaluate the ITA’s proposal alongside similar proposals from other Framework ITAs so as to ascertain the most advantageous tender for a Call-Off Contract on the basis of the Evaluation Criteria (a “Call-Off pursuant to Competitive Selection Process”), pursuant to clause 5.
Direct Award Ground 1: Where any Call-Off Contract will be awarded to the highest-ranking Framework ITA in the Tender Ranking following the outcome of the procurement process for this Framework Agreement (“Direct Award Ground 1”);
Direct Award Ground 2: If, having sought to award a Call-Off Contract to the highest-ranking Framework ITA for the applicable Call-Off Contract pursuant to Direct Award Ground 1, the highest-ranking Framework ITA is unable or unwilling to accept the award, Ofgem may award the Call-Off Contract to the Framework ITA ranked second (this shall continue in descending order). For the avoidance of doubt a Framework ITA will be deemed unable or unwilling to accept the award if:
- it does not have capacity to take on the work;
- it has a conflict of interest issue in respect of the work such that Ofgem considers (at its discretion but having reference to the Conflicts of Interest Policy) the work cannot be awarded to that Framework ITA;
- there has been a change in circumstance to the identity, control, financial standing, technical and professional ability or composition of the Framework ITA such that it is no longer able to meet the Minimum Standards set out in the Pre-Qualification Questionnaire for this Framework Agreement procurement; and/or
- Ofgem reasonably determines that a Framework ITA should not be awarded a Call-Off Contract based on its past performance while party to this Framework Agreement, including (but not limited to) performance against key performance indicators, cost performance, or time performance against Call-Off Contract contractual milestone dates
(“Direct Award Ground 2”)
Direct Award Ground 3: Where, having sought interest in writing from the Framework ITAs, there is only one Framework ITA who is able to provide the Call Off Services to the necessary standard and within the necessary time as required by Ofgem, including the relative financial or resource capacity of the relevant ITA compared to the other Framework ITAs (“Direct Award Ground 3”);
or
Direct Award Ground 4: Where a matter of extreme urgency arises (or had arisen prior to Ofgem’s Request), as a result of which Ofgem reasonably considers it inappropriate to conduct a Call-Off pursuant to Competitive Selection Process under clause 5 of this Framework Agreement (“Direct Award Ground 4”).
The lotProcurement structure
single lot · value publishedLot #1AwardedPublished value£20,833,333
- Economic & financial standing
Participation is open to economic operators that are legally constituted and able to enter into a legally binding contract with Ofgem. Suppliers must not be subject to any mandatory or discretionary exclusion grounds under applicable procurement legislation. Legal standing will be assessed via the Procurement Specific Questionnaire. Suppliers must demonstrate appropriate financial standing and economic capacity to deliver the services. Financial standing will be assessed as part of the Procurement Specific Questionnaire and may include financial and credit checks undertaken by Ofgem.
- Technical & professional ability
Suppliers must demonstrate appropriate technical capability and experience to deliver independent technical and cost assurance services for major electricity transmission infrastructure projects. This includes the ability to provide assurance across design, procurement, cost and delivery, and to resource work flexibly across multiple projects where required. Technical capability will be assessed as part of the Procurement Specific Questionnaire and the tender evaluation process.
What it takes to wini
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Evaluation split and conditions of participation as published; the tender pack may add morei
How this buyer will score bids.
The evaluation criteria and weights exactly as published on the notice, grouped by family (price, quality, social value and so on).
Published sub-criteria (2)
- Technical: 70%
- Commercial: 30%
Published award criteria (2)
- Technical: Assessment of the quality of the tender response in accordance with the evaluation methodology set out in the tender documentation.
- Commercial: Assessment of price in accordance with the commercial evaluation methodology set out in the tender documentation.
- Economic & financial standing
Participation is open to economic operators that are legally constituted and able to enter into a legally binding contract with Ofgem. Suppliers must not be subject to any mandatory or discretionary exclusion grounds under applicable procurement legislation. Legal standing will be assessed via the Procurement Specific Questionnaire. Suppliers must demonstrate appropriate financial standing and economic capacity to deliver the services. Financial standing will be assessed as part of the Procurement Specific Questionnaire and may include financial and credit checks undertaken by Ofgem.
- Technical & professional ability
Suppliers must demonstrate appropriate technical capability and experience to deliver independent technical and cost assurance services for major electricity transmission infrastructure projects. This includes the ability to provide assurance across design, procurement, cost and delivery, and to resource work flexibly across multiple projects where required. Technical capability will be assessed as part of the Procurement Specific Questionnaire and the tender evaluation process.
- Price carries 30 of 100 points: a 10% discount moves about 3 points. The method statement decides this lot, not the discount.
- “2024-133 RIIO-3 Independent Technical Adviser” is a framework: the contest is a place on its panel, up to 3 suppliers, not a single contract: call-offs may be direct or by further competition.
Price arithmetic assumes straight proportional scoring; the tender pack may use another formula.
Procedure terms & legal framework
From the official record- Procedure method
- Open procedure
- Legal basis
- UKPGA · 2023/54 Procurement Act 2023
- Procurement category
- Services
- Notice status
- Awarded
- Procurement threshold
- Above threshold (FTS publication)
- Regulatory regime
- Standard
- Commercial structure
- Framework agreement
- Who may use this agreement
- Not stated in the notice; call-off rights may be limited to the establishing authority
- Competition type
- Competitive procedure
- GPA / WTO covered
- Yes (GPA)
- Recurring procurement
- Unspecified in notice
- First published
- 20 Jun 2025, 13:02 BST
- Last source update
- 20 Oct 2026, 14:26 BST
- Award evaluation window
- Submission end – 28 May 2026
- Authority reference
2024-133A-C- FTS notice number
2026/S 000-017065- Latest notice
- Contract details notice (UK7)
- Classification (CPV)
- Delivery area
- Official registry OCID
ocds-h6vhtk-0550e3Find a Tender- Contract terms summary
Payment will be made in accordance with the framework agreement and applicable call‑off contracts. Charges shall be based on the agreed daily rates submitted by the supplier at tender stage and applied in line with the requirements of the relevant call‑off.
Payment will be subject to the satisfactory delivery of services and submission of valid invoices in accordance with the contract terms. Further details of invoicing, payment timing and any reporting requirements are set out in the framework and call‑off contract documentation.
- Risks
Key risks to the successful delivery of the contract include:
- Availability and retention of suitably skilled and experienced resources over the contract period;
- Conflicts of interest arising from suppliers' wider market activities and relationships with Transmission Owners or their supply chains;
- The variable and evolving nature of the scope of work across RIIO‑3, including changes in project eligibility, volume and timing;
- Dependence on timely provision of information and cooperation from third parties, including Transmission Owners; and
- The complexity and scale of electricity transmission projects, which may impact delivery timelines and assurance activities.
These risks will be managed through contractual controls, governance arrangements, reporting requirements and performance management mechanisms as set out in the framework and call‑off contracts.
How it was run
Official notice- Appointment period ends
- 20 Apr 2026, 12:00 BST
- Clarification deadline
- 20 Mar 2026, 12:00 GMT
- Electronic submission
- Allowed
- Accepted languages
- en
Timeline
20 Jun 2025 → 20 Oct 2026 · 10 dates- Planning notice published20 Jun 2025, 13:02 BST
- Next notice expected28 Aug 2025, 23:59 BST
- Tender notice published238 days ago25 Feb 2026, 16:12 GMT
- Clarification questions by216 days ago20 Mar 2026, 12:00 GMT
- Admission / appointment period ends185 days ago · period end, not a bid countdown20 Apr 2026, 12:00 BST
- Award decision expected by146 days ago28 May 2026, 23:59 BST
- Contract starts114 days ago30 Jun 2026, 00:00 BST
- Assessment summaries sent112 days ago2 Jul 2026, 00:00 BST
- Standstill ends98 days ago15 Jul 2026, 23:59 BST
- Latest notice published2 days ago20 Oct 2026, 14:26 BST
Notice history
15 events · 7 releases on Find a Tender · since 20 Jun 2025- Pipeline notice published20 Jun 2025, 13:02 BSTUK1
- Tender notice published25 Feb 2026, 16:12 GMTUK4
- Published value published: £20,833,33325 Feb 2026, 16:12 GMT
- Status changed to active25 Feb 2026, 16:12 GMT
- Procurement method changed25 Feb 2026, 16:12 GMT
- Deadline published: 7 Apr 2026, 12:00 BST25 Feb 2026, 16:12 GMT
- Tender notice published27 Mar 2026, 15:42 GMTUK4
- Deadline moved to 14 Apr 2026, 12:00 BST27 Mar 2026, 15:42 GMT+7 days · was 7 Apr 2026, 12:00 BST
- Tender notice published9 Apr 2026, 16:50 BSTUK4
- Deadline moved to 20 Apr 2026, 12:00 BST9 Apr 2026, 16:50 BST+6 days · was 14 Apr 2026, 12:00 BST
- Tender notice published15 Apr 2026, 15:23 BSTUK4
- Contract award notice published3 Jul 2026, 14:38 BSTUK6
- Status changed to complete3 Jul 2026, 14:38 BST
- Contract signature expected17 Jul 2026, 23:59 BSTscheduled
- Contract details notice published20 Oct 2026, 14:26 BSTUK7
Published amendments (3)
Change to the tender submission date from 07 April 2026 at 12 noon to 14 April 2026 at 12 noon
Due to issues with the mytender system, uploaded documents added to the notice are not showing. Mytenders are aware and looking in to this. Thererfore, to allow time for bidders to review these documents, the closing date is being pushed back a week with the view that the system has been fixed by Monday to allow the document to show. To note for bidders, the changes to the terms are minimal and…
Additional supporting documents now uploaded
Routine re-releases (7)
- 2026-04: 1 release · 9 Apr 2026
- 2026-03: 1 release · 27 Mar 2026
- 2026-02: 1 release · 25 Feb 2026
- 2025-06: 1 release · 20 Jun 2025
Commercial outcome & contract awards
Published awards, contracts and bid statistics, not a forecast| Awarded to | Value | Date | Status |
|---|---|---|---|
| Atkins Limited, Kelvin Construction Company Limited, RRL Group Limited22 Jul 2026 – 21 Jul 2031 | £20,833,333 | 25 Jun 2026 | Awarded |
Contracts
2024-133 RIIO-ET3 Independent Technical Adviser · Atkins Limited, Kelvin Construction Company Limited, RRL Group Limited
- Signed
- 15 Oct 2026
- Value
- £18,750,000
- Period
- 15 Oct 2026 – 31 Aug 2031
- Status
- active
Bid statistics published by the authority
| Bids | SME | VCSE | Valid bid range |
|---|---|---|---|
| 10final-stage tenders | 6 | 0 | — |
Who bid
- wonKelvin Construction Company Limited · East Midlands
- wonAtkinsRealis UK Limited · South East England
- wonRRL Group Limited · Greater London
- did not winBlake Clough Consulting Limited · Yorkshire and the Humber
- did not winGrant Thornton UK Advisory and Tax LLP · Greater London
- did not winLong O Donnell Associates LimitedSME · North West England
- did not winModern Tech Limited · Greater London
- did not winSystra Limited · Greater London
- did not winNatural Power Consultants Limited · Scotland
- did not winGutteridge, Haskins & Davey · Greater London
Bidders as named on the Procurement Act 2023 award notice. “Won” means the bidder holds an award on this notice.
Contracting authority & participating public bodies
Framework contractors & participating bidders
10 commercial parties on the notice · 3 awarded- AtkinsRéalis UK LimitedFramework contractor
- Blake Clough Consulting LimitedBidder / tenderer
- Grant Thornton UK Advisory and Tax LLPBidder / tenderer
- Gutteridge, Haskins & DaveyBidder / tenderer
- Kelvin Construction Company LimitedFramework contractor
- Long O Donnell Associates Limited Bidder / tenderer
- Modern Tech Limited Bidder / tenderer
- Natural Power Consultants Limited Bidder / tenderer
- RRL Group LimitedFramework contractor
- Systra Limited Bidder / tenderer
Official documents & specifications (13)
Official links; attachments are not copiedTender pack and attachments
- Bidding documents and specifications 2024-133 - Final - Ofgem - ITA Call-off [TRACKED VERSION] (30 March 2026)
- Bidding documents and specifications Invitation to Tender
- Bidding documents and specifications 2024-133 Schedule 7 - Call-off Contract supporting document - KPIs
- Bidding documents and specifications Invitation to Tender
- Bidding documents and specifications 2024-133 - Final - Ofgem - ITA Framework Agreement [TRACKED VERSION] (30 March 2026)
- Bidding documents and specifications 2024-133 Review of Responses to Legal Commentary Process (30 March 2026)
Notices published for this procedure
- Contract details notice Contract details notice on Find a Tender
- Contract award notice Contract award notice on Find a Tender
- Tender notice Tender notice on Find a Tender
- Tender notice Tender notice on Find a Tender
- Tender notice Tender notice on Find a Tender
- Tender notice Tender notice on Find a Tender
- Pipeline notice Pipeline notice on Find a Tender