Retender radar: UK public contracts ending soon
Public contracts ending ahead, with the buyer, the incumbent and the value. Where a notice gives only a duration, the end is estimated and labelled. An end date can signal a new tender; it does not promise one.
Contracts ending in the next 12 months
Showing 7,271–7,280
- Ends · in 120 days
CSP26940 - PIP-II Titanium Posts
UK Research and Innovation · Central government · Nationwide (UK)
Incumbent: Triples Apparel Ltd T/A Oxton Engineering
Procurement Description ***** THIS IS A CONTRACT DETAILS NOTICE, NOT A CALL FOR COMPETITION ***** This procurement is being concluded following a limited competition procurement exercise. Brief Description of Requirement OMDL-114 - PIP-II T…
- Published value
- £37k
- Annual run-rate
- —term under 6 months
- Term
- 20 Oct 2026 → 20 Feb 2027 · 4 months
- Reference
ocds-h6vhtk-078caf
- Ends · in 120 days
CIS subscription
Leicester City Council · Local authority · East Midlands
Incumbent: Allium UK Holding Limited
Annual subscription to the Construction Information Service (CIS) for Planning and Transportation, Housing, Estates and Building Services - Hard FM and Capital Projects teams.
- Published value
- £27k
- Annual run-rate
- £27kpublished value ÷ term, exc. VAT
- Term
- 20 Feb 2026 → 20 Feb 2027 · 1 yr
- Reference
ocds-h6vhtk-06f4c1
- Ends · in 120 days
Backupify Subscription
The National Archives · Central government · Greater London, South East England
Incumbent: Kaseya
Backupify Subscription: Microsoft 365 backup product
- Published value
- US$17,388
- Annual run-rate
- —not a GBP value
- Term
- 21 Feb 2026 → 20 Feb 2027 · 1 yr
- Reference
ocds-h6vhtk-06643c
- Ends · in 120 days
The Wash and North Norfolk Coast SAC intertidal rock monitoring
NATURAL ENGLAND (Defra Network eTendering Portal) · Central government · East Midlands
Incumbent: Seastar Survey · Last contest: awarded at the estimate
NE intend on commissioning a survey to monitor the intertidal rock sub feature of the WNNC SAC against 5 of its attributes. This survey is intended to collect evidence on the intertidal rock sub-feature in order to fill current evidence gap…
- Published value
- £17k
- Annual run-rate
- £27kpublished value ÷ term, exc. VAT
- Term
- 10 Jul 2026 → 20 Feb 2027 · 7 months
- Reference
ocds-h6vhtk-06b27c
- Ends · in 120 days
GTI Target Connect Package Renewal
Office for National Statistics · Central government · Nationwide (UK)
Incumbent: GTI FUTURES LTD
12 month platform subscription for GTI Target Connect Package
- Published value
- £12k
- Annual run-rate
- £12kpublished value ÷ term, exc. VAT
- Term
- 21 Feb 2026 → 20 Feb 2027 · 1 yr
- Reference
ocds-h6vhtk-064b92
- Estimated end · in 120 daysCall-offPanel · 9 suppliers
South East England
Hampshire County Council · Local authority · East of England, Greater London, South East England, South West England
Panel: BOWMER AND KIRKLAND LIMITED, Galliford Try Construction Limited, ISG Construction Limited +6 more · Last contest: 16 bids (0 SME)
To establish a successor framework to the existing Southern Construction Framework (SCF). SCF has delivered construction capital projects to over 100 public sector clients across South West England, South East England, and London. The new S…
- Published value
- £1.5bnvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 21 Feb 2027 · start not published
- Reference
ocds-h6vhtk-033785
- Estimated end · in 120 daysCall-offPanel · 9 suppliers
London
Hampshire County Council · Local authority · East of England, Greater London, South East England, South West England
Panel: BOWMER AND KIRKLAND LIMITED, Galliford Try Construction Limited, ISG Construction Limited +6 more · Last contest: 17 bids (1 SME)
To establish a successor framework to the existing Southern Construction Framework (SCF). SCF has delivered construction capital projects to over 100 public sector clients across South West England, South East England, and London. The new S…
- Published value
- £1.5bnvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 21 Feb 2027 · start not published
- Reference
ocds-h6vhtk-033785
- Estimated end · in 120 daysCall-offPanel · 11 suppliers
South West England
Hampshire County Council · Local authority · East of England, Greater London, South East England, South West England
Panel: BAM CONSTRUCTION LIMITED, Bouygues UK, Galliford Try Construction Limited +8 more · Last contest: 11 bids (0 SME)
To establish a successor framework to the existing Southern Construction Framework (SCF). SCF has delivered construction capital projects to over 100 public sector clients across South West England, South East England, and London. The new S…
- Published value
- £1.1bnvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 21 Feb 2027 · start not published
- Reference
ocds-h6vhtk-033785
- Estimated end · in 120 daysCall-offPanel · 7 suppliers
West Region of SW England
Hampshire County Council · Local authority · East of England, Greater London, South East England, South West England
Panel: AJC Developments (South) Ltd, Halsall Construction Ltd, Kier Construction Ltd +4 more · Last contest: 10 bids (6 SME)
To establish a successor framework to the existing Southern Construction Framework (SCF). SCF has delivered construction capital projects to over 100 public sector clients across South West England, South East England, and London. The new S…
- Published value
- £200mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 21 Feb 2027 · start not published
- Reference
ocds-h6vhtk-033785
- Estimated end · in 120 daysCall-offPanel · 6 suppliers
East Region of SW England
Hampshire County Council · Local authority · East of England, Greater London, South East England, South West England
Panel: E.W. Beard Limited, Halsall Construction Ltd, Kier Construction Ltd +3 more · Last contest: 12 bids (5 SME)
To establish a successor framework to the existing Southern Construction Framework (SCF). SCF has delivered construction capital projects to over 100 public sector clients across South West England, South East England, and London. The new S…
- Published value
- £200mvalue of a framework or DPS agreement; may be a ceiling
- Annual run-rate
- —panel, not one supplier
- Term
- Estimated end 21 Feb 2027 · start not published
- Reference
ocds-h6vhtk-033785
When contracts end i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
38,087 contracts and agreements end within 24 months, 60,556 in total · £43bn published GBP values end in the next 12 months, exc. VAT; framework and DPS values, concession values and other ceiling-like amounts are excluded, so this is not a spend forecast.
By sector, next 12 months i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
i
When contracts here run out.
Published contracts by their end date. No end date, not counted.
An end date does not confirm a new procurement.
CPV division of the procedure; a contract with several divisions counts in each.
85Health and social work services2,71879Business services: law, marketing, consulting67860Transport services (except waste transport)61950Repair and maintenance services60990Sewage, refuse, cleaning and environmental52645Construction work49872IT services: consulting, software, internet46571Architectural, construction, engineering387
How to read the radar
- End date is the contract period end the buyer published on the notice (or on the lot). Where the notice gives only a duration, the end is estimated as the signature date (or, without one, the publication date) plus that duration, and the row says so. Contracts with neither are not on the radar; neither are contracts the buyer cancelled or terminated early.
- List or panel totals. When one total is repeated on every provider of an approved list or panel, it is shown on the row but never added to the GBP totals or used for a run-rate.
- Extension option means the notice publishes a renewal or option clause; the buyer may extend. Hiding these rows shows contracts without a published option, but does not establish that the buyer will procure them again.
- Incumbent is the supplier named on the award behind the contract. A panel (several suppliers on one award) is shown as a panel; no single incumbent is invented.
- Annual run-rate = published GBP value ÷ published term for a single supplier and a term of six months or more. Values linked to a framework or DPS have no run-rate until we can tell whether they are a ceiling or a contract. The annual sort ranks comparable values excluding VAT first; gross-only values remain visible on their rows. This is not actual annual spend.
- Counts are exact for the time-horizon and sector filters. A parent framework or DPS counts once; call-offs published by other buyers count separately. Where the parent cannot be identified, agreements stay separate and are marked as linked to a framework or DPS; check the source notice before treating their date or value as a single contract fact. With other filters, a result above 1,000 rows shows as “1,000+”.
- Source. Official UK procurement notices, reused under the Open Government Licence v3.0; the radar is rebuilt nightly. How we count: methodology.