Contracts Finder notice
Lancaster University - Spine Duct Strategic Improvements project - 4- year Framework
Authority: Lancaster University
What is being bought
Published requirement descriptionLancaster University is seeking to appoint a Principle Contractor to undertake the Spine Duct Strategic Improvements Project. It is envisaged that this project will span approximately 4 years which includes a 12 months rectification period. The contract will be awarded as a Framework so the University can Call off packages of work. The first package of work will commence mid-February 2023 until April 2023 and there will be a second Call Off commencing July 2023, completing before the end of September 2023. Further phases will then be awarded in Summer 2024 and Summer 2025.
The project will target strategic and technical issues identified within the University Spine Duct, which is address Gas Detection and Heat Detection within the ducts in Phase 1 (February - April 2023). Phase 2 (July 2023-September 2023) will include Ventilation, Fire Stopping, Signage and Electrical Improvement Works to the South Spine Ducts. This includes an element of civils and buildings work at ground level. Phase 3 (July 2024 - September 2024) will include Ventilation, Fire Stopping, Signage and Electrical Improvement Works to the North Spine Ducts. This includes an element of civils and buildings work at ground level. The final phase (Phase 4) (July 2025 - September 2025) will include the installation of new gas pipework, gas isolation valves and bypass, making the existing Energy Centre circa 1965 gas pipework and duct redundant.
The estimated value of the project over the 4 phase Framework is £1.6 million net construction cost, excluding VAT.
Intended tender method: Design & Build - Single Stage - fixed lump sum for the first 2 Call Off packages of works (Phase 1 and Phase 2) on the basis of RIBA Stage 4 design information. Phases 3 and 4 will be lump sum at tender stage, with Open Book cost uplift for any costs increases, over and above the tender sum cost, negotiated and agreed with Cost Consultant and industry standard rates (BCIS) prior to award of each remaining Phase/Call Off package of work.
The location of the site is Bailrigg Campus, Lancaster, LA1 4YW.
This tender is not lotted. One contractor will be awarded to the Framework
The University will host accompanied site visits on Monday 24/10/22 & Tuesday 25/10/22. A maximum of two attendees per tenderer is permitted to attend. Please register your intention to attend via the In-Tend 'correspondence' function by 12 noon Thursday 20th October 2022 at the latest as you will be allocated a time slot and informed via In-tend by Friday afternoon.
University's e-tendering portal: In-Tend
in-tendhost.co.uk/lancaster/ ↗
DOCUMENTS MUST BE ACCESSED AND SUBMISSIONS MADE VIA THIS PORTAL.
Any clarifications on procedure, documentation or the project generally must be raised through the In-Tend 'correspondence' function.
In-Tend Support:
Phone: 0845 557 8079
E-mail: [email protected]
Published procurement details
- Procedure
- Open procedure (below threshold)
- Buyer reference
- SP/22/1252.
- Category
- Works
- Tender status
- Complete
- Award status
- Active
- Suitable for SMEs
- Yes
- Suitable for voluntary, community and social enterprises
- No
- Published tender value
- £1,600,000.00
- Tender deadline
- Communication: Future Notice Date
- Published
- Procurement method
- Open
- Tender contract period: Start date
- Tender contract period: End date
- Item 1: Delivery locations as published
- North West, United Kingdom
Key dates
Published dates- Notice published2 Sept 2022
- Award decision8 Feb 2023
- Contract starts8 Feb 2023
- Contract ends31 Dec 2026
Contracting authority & participating public bodies
- Lancaster UniversityContracting authority
- Identifier
- sid4gov.cabinetoffice.gov.uk/26vT5PSw · GB-SRS
Suppliers named on the notice
- Tilbury Douglas Engineering LimitedSupplier
- Identifier
- 03044398 · GB-COH
- Voluntary, community or social enterprise
- No
- Business size
- Large
Official documents & specifications (3)
Official links; attachments are not copiedNotices published for this procedure
Other published details
- Budget: Budget Breakdown 1: Reference
- 1
- Budget: Budget Breakdown 1: Amount
- £740,000.00
- Budget: Budget Breakdown 1: Period: Start date
- Budget: Budget Breakdown 1: Period: End date
- Budget: Budget Breakdown 1: Description
- 2022/2023
- Budget: Budget Breakdown 2: Reference
- 2
- Budget: Budget Breakdown 2: Amount
- £400,000.00
- Budget: Budget Breakdown 2: Period: Start date
- Budget: Budget Breakdown 2: Period: End date
- Budget: Budget Breakdown 2: Description
- 2023/2024
- Budget: Budget Breakdown 3: Reference
- 3
- Budget: Budget Breakdown 3: Amount
- £260,000.00
- Budget: Budget Breakdown 3: Period: Start date
- Budget: Budget Breakdown 3: Period: End date
- Budget: Budget Breakdown 3: Description
- 2024/2025
Source record
- Source
- Contracts Finder
- Notice language
- en
- Release reference
- ocds-b5fd17-34f7ca7f-2b0f-4a78-908c-453dbd925435-2023-02-09T16:02:21Z
- Published
- 2 Sept 2022
- Latest update
- 9 Feb 2023
- Procedure reference
- ocds-b5fd17-34f7ca7f-2b0f-4a78-908c-453dbd925435
- Contract reference
- ocds-b5fd17-34f7ca7f-2b0f-4a78-908c-453dbd925435-1