TenderlineUK
Procurement Intelligence
Official OCDS
Find a Tender
complete
Official procurement procedure

Railway Systems Procurement for Control, Command, Signalling and Traffic Management (CCS and TM) systems

Railway signalling works
UK
Published value
Not published
Submission deadline Not published
Lots published1
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: HS2: "Railway Systems Procurement for Control, Command, Signalling and Traffic Management (CCS and TM) systems". Published status: complete. Published value: Value not published. 1 published lot. Submission deadline not published. See the official notice for participation instructions.
Contracting AuthorityHS2Scope & CategoriesNot publishedSubmission Window
complete
No deadline published
Submission GatewayDirect notice routeLegal Basis & RegimeStandard procurementEstimated Value (exc. VAT)Not published
Bidder Intelligence · Authority Profile: HS2
Market Analytics
View Authority Profile →
Derived from OCDS awards & bid statistics
Published history for HS2. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Average Price Reduction
Not availableInsufficient comparable data
Requires at least 5 comparable procedures
Competition Density
2.7Bids / Report
50% of reports have one bid
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate available
Payment Terms
Check noticePublished terms
Payment obligations depend on the applicable regime and contract. Consult the official documents.
Coverage: 22 active published awards; 20 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Price reduction compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityHS2
Procedure methodNot published
Procurement categoryNot published
Statuscomplete
Framework / DPSNot published
CompetitionNot published
Above thresholdNot published
Legal basisNot published
Tender period startsNot published
Clarification deadlineNot published
Electronic submissionNot published
Submission languagesNot published
Published20 Jan 2025, 17:36 GMT
Last source update20 Jan 2025, 17:36 GMT
Recurring procurementNot published
ClassificationRailway signalling works
Delivery area
UK
OCIDocds-h6vhtk-04d4de
What is being bought
The CCS and TM scope comprises (for a high speed railway): - traffic management system (TMS), - European Train Control System (ETCS) with all lineside equipment, - signalling equipment including interlocking and train detection equipment, - automatic train operation (ATO) Grade of Automation 2 over ETCS, - possession management system, - enterprise service bus, - weather monitoring system and adhesion management system. This includes without limitation the design, manufacture, supply, installation, supervision, inspection, safety authorisation, testing, commissioning and maintenance until handover to trial operations and ongoing technical support services of the CCS and TM Systems.
What changed
From the official release history
  1. Status changed to complete
    20 Jan 2025, 17:36 GMT
  2. Official notice release published
    20 Jan 2025, 17:36 GMT
  3. Buyer information updated
    20 Jan 2025, 17:36 GMT
Lots and requirements (1)
Published by the contracting authority
  • Lot 1 · #1
    Individual lot title not published
    cancelled
    Published valueNot published
    This package of work comprises the CCS and TM Systems. The controller workstations and centrally located equipment cubicles will be located at the Network Integrated Control Centre (NICC) at Washwood Heath. Other equipment will be located along the route, in stations and at the interfaces with depots and Network Rail infrastructure. The CCS and TM Systems will have the following minimum requirements. • The trackside ETCS will deliver level 2 functionality (without signals); ETCS will be provided on all open route, sidings, spurs, loops, tunnels and stations on HS2 infrastructure. • Automatic train operation (ATO) with Grade of Automation 2 will be available on all open route, sidings, spurs, loops, tunnels and stations on HS2 infrastructure and into Washwood Heath Rolling Stock Depot stabling roads and bypass road. • The main TMS functionality will include as a minimum automatic train supervision and regulation including plan/replan functionality, automatic platform re-allocation, reconfigurable control areas, interfaces to third party stock and crew systems and interfaces to third party support tools for automatic incident management. The TMS will provide timetable and contingency plan management, conflict identification and conflict decision support. The TMS will provide outputs for real-time passenger information • The possession management system will permit the safe reservation/occupation of sections of the track for personnel and trains. • The enterprise service bus will enable the NICC and other stakeholders’ systems to access and exchange common, real-time status information for all trains and HS2 CCS assets. • The weather monitoring system will provide information about wind, on specific locations of the HS2 infrastructure. Data shall be provided to the CCS & TMS systems to indicate areas where speed restrictions should be applied due to high winds. • The adhesion monitoring system will provide information about low adhesion areas. Uninterruptible power supplies will be provided where necessary to meet the required reliability and availability of the CCS and TM systems. All works to be undertaken under this procurement shall give due cognisance to and be compliant with the appropriate elements of the High Speed Rail (London — West Midlands) Act 2017. The route will be handed over to the track system contractors by the Main Works Civils Contractors in stages following the completion of works under their contracts. The track installation will be staged based upon multiple testing areas. Initially, the track system contractor will have exclusive access to enable their installation to be completed. Access will then be granted to the other railway systems contractors including the CCS and TM Contractor. The CCS and TM Contractor will mobilise to commence the works as each area becomes available. It is proposed that HS2 Ltd will take on the role of client and principal designer. The CCS and TM Contractor may be required to act as principal contractor for certain stages of the NICC systems installation or for remote locations. The employer will require the contractor to provide technical support services as part of a separate technical support contract. The technical support contract will be entered into at contract award but will only become effective upon successful completion of trial operations.
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
Timeline
  1. Procedure published
    20 Jan 2025, 17:36 GMT
  2. Award active
    Not published · Not published
  3. Contract active
    Signed 20 Dec 2024, 00:00 GMT · Not published
Commercial outcome and competition
Awards
Siemens Mobility Limited
Not published · Not published · active
Contracts
Contract
Not published · signed 20 Dec 2024, 00:00 GMT · active
Bid statistics
bids: 6 (lot 1)
electronicBids: 6 (lot 1)
Buyer and organisations in this procedure

HS2

Contracting authority GB-FTS-6976
View buyer profile
  • HS2
    buyer

    High Speed Two (HS2) Ltd, Two Snowhill, Queensway, Birmingham, UK, B4 6GA
    +44 2079443000
  • High Court
    reviewBody

    London, B4 6GA
  • High Court
    mediationBody

    London
  • Siemens Mobility Limited
    supplier

    Sixth Floor, The Lantern, 75 Hampstead Road, London, UK, NW1 2PL
Documents (0)
Official links; attachments are not copied
No data
No linked documents are published
Related procedures (0)
No data
No related procedures published