← Back to search results

AwardedFind a Tender · award

Target Operational Model (TOM) Delivery Partner for CCG

Buyer: H M Revenue & Customs →

BuyerH M Revenue & Customs
StatusAwarded
DeadlineNot published
ValueValue not published
Published30 Jul 2024

What is being bought

Wave 1 of the CCG TOM Programme is now underway. Most of the projects have been in initiation and design but are due to move into implementation in FY 24/25 having completed a short project setting out a high-level approach to strategic prioritisation and having stood up a new Compliance Operations Directorate. We are now looking to bring in a Technical Delivery Partner to assist with completing the design and implementation of Wave 1, where the projects are at various stages of readiness for implementation, and to commence the design for Wave 2. The COD project has established the new cross-CCG Operations function that will consolidate and centralize various elements from different CCG Directorates to improve efficiency, effectiveness and customer experience. The formation of the COD Directorate sets the groundwork to achieve the critical success factors' intent. The project has created four main functions: (1) Professionalism and Capability, (2) Compliance Operational Process and Systems, (3) CCG Operational Planning, Performance, Evaluation and Resourcing, and (4) Compliance Design and Response. End to End Business Planning (E2E) is a key focus for this contract. The aim is to improve planning across CCG by designing a future state that prioritises CCG's key compliance risks and plans strategically over a multi-year timeframe enabling evolution to a "Push Model" whereby strategic direction dictates operational planning. - The E2E project has separated activities into 3 workstreams. - Under Workstream 1, a framework has been generated, that when implemented, will support prioritisation and multi-year planning. Lessons have been captured and where appropriate utilised in maturing FY24/25 thinking. - Under Workstream 2 (carried forward from 23/24) detailed process designs remain work in progress and when approved, will be taken forward for implementation aligned with the maturing implementation plan. - Via Workstream 3, the project team aim to execute year one of the multi-year implementation plan, resulting in a Minimum Viable Product version of the business planning process. Wave 2 activities and future projects have not been determined/agreed, and the delivery partner will support with developing the Concept, Discovery and Design phases of Wave 2. For context, a CCG TOM Programme with circa 51FTE has been established with a monthly Programme Board and monthly project boards (E2E, COD, S&C, TOM_CoR, MI). Multi-disciplinary project teams have been established for each Wave 1 project with access to an allocated Senior Responsible Officer, project manager, project support, business analysts, SMEs, change managers, comms managers, benefits managers and design support. The new Technical Delivery Partner will be providing Programme Director support, via the agreed outcomes. the expectation is that the delivery partner will be fully integrated with the rest of the TOM Programme team.

Delivery location

UK

Categories

Computer-related professional services 72590000

Lot details

Lot 1

Wave 1 of the CCG TOM Programme is now underway. Most of the projects have been in initiation and design but are due to move into implementation in FY 24/25 having completed a short project setting out a high-level approach to strategic prioritisation and having stood up a new Compliance Operations Directorate. We are now looking to bring in a Technical Delivery Partner to assist with completing the design and implementation of Wave 1, where the projects are at various stages of readiness for implementation, and to commence the design for Wave 2. The COD project has established the new cross-CCG Operations function that will consolidate and centralize various elements from different CCG Directorates to improve efficiency, effectiveness and customer experience. The formation of the COD Directorate sets the groundwork to achieve the critical success factors' intent. The project has created four main functions: (1) Professionalism and Capability, (2) Compliance Operational Process and Systems, (3) CCG Operational Planning, Performance, Evaluation and Resourcing, and (4) Compliance Design and Response. End to End Business Planning (E2E) is a key focus for this contract. The aim is to improve planning across CCG by designing a future state that prioritises CCG's key compliance risks and plans strategically over a multi-year timeframe enabling evolution to a "Push Model" whereby strategic direction dictates operational planning. - The E2E project has separated activities into 3 workstreams. - Under Workstream 1, a framework has been generated, that when implemented, will support prioritisation and multi-year planning. Lessons have been captured and where appropriate utilised in maturing FY24/25 thinking. - Under Workstream 2 (carried forward from 23/24) detailed process designs remain work in progress and when approved, will be taken forward for implementation aligned with the maturing implementation plan. - Via Workstream 3, the project team aim to execute year one of the multi-year implementation plan, resulting in a Minimum Viable Product version of the business planning process. Wave 2 activities and future projects have not been determined/agreed, and the delivery partner will support with developing the Concept, Discovery and Design phases of Wave 2. For context, a CCG TOM Programme with circa 51FTE has been established with a monthly Programme Board and monthly project boards (E2E, COD, S&C, TOM_CoR, MI). Multi-disciplinary project teams have been established for each Wave 1 project with access to an allocated Senior Responsible Officer, project manager, project support, business analysts, SMEs, change managers, comms managers, benefits managers and design support. The new Technical Delivery Partner will be providing Programme Director support, via the agreed outcomes. the expectation is that the delivery partner will be fully integrated with the rest of the TOM Programme team.

Statuscancelled

Award criteria
price

What is included

ItemCategoryQuantity
1Not publishedNot published

Comparable-procurement analytics

Benchmarked against retained Find a Tender procedures with CPV division 72. The category anchor is Computer-related professional services (72590000); this is a deliberately broad market comparator. The comparison is shown at several levels rather than pretending one company or region is always the best benchmark.

Comparison setProceduresReported bids per procedureNamed award suppliersPrice evidence
Market: CPV division 7210,5392 median · 15.4 average (4,161 of 10,539 with a bid count)2 average (5,053 of 10,539 with named award suppliers)Not published
Same buyer81 median · 2.7 average (3 of 8 with a bid count)1 average (3 of 8 with named award suppliers)Not published
Delivery region: UK3,3232 median · 33.9 average (1,171 of 3,323 with a bid count)2.8 average (1,501 of 3,323 with named award suppliers)Not published

“Reported bids” is an official aggregate, sometimes reported per lot; it is the closest available competition measure. “Named award suppliers” are winners, not all applicants.

Price-outcome signal

Not enough comparable procedures currently publish both a GBP tender value and a usable lowest-valid-bid value to calculate a responsible price-reduction benchmark. Tenderline deliberately does not infer a saving from named award suppliers or from missing award values.

Procurement strategy & market signals

Framework agreementNot published
Dynamic purchasing systemNot published
Competitive procurementNot published
Recurring requirementNot published
Procurement method rationaleThe call for competition was via an established Framework. All Providers on the Framework were invited to participate by expressing their interest.
Rationale classificationsThe procurement falls outside the scope of application of the directive
Special regimeNot published
Covered byGPA
Submission policyNot published
Selection criteriaNot published
Risk detailsNot published

Planning & early market engagement

BudgetNot published
No-engagement rationaleNot published
Planning documents0
Planning milestones0

No planning milestones published.

Related procurements

No linked framework, prior procurement or reprocurement published.

Awards

Contracts

023810-2024-1

Statusactive
Value£4,165,000

Documents & submission route

No documents are published in the current source record.

Source data inventory

Diagnostic view. “Not published” means this current release does not provide a value.

OCIDocds-h6vhtk-048602
Latest release ID023810-2024
Latest release timestampTue Jul 30 2024 14:53:01 GMT+0000 (Coordinated Universal Time)
Sourcefind-a-tender
Official notice URLNot published
Tender statuscomplete
Procurement methodlimited
Procurement method detailsAward procedure without prior publication of a call for competition
Main procurement categoryservices
Above thresholdNot published
Legal basis32014L0024
Tender period: startNot published
Tender period: endNot published
Expression of interest deadlineNot published
Enquiry deadlineNot published
Award period: startNot published
Award period: endNot published
Submission method detailsNot published
Submission languagesNot published
Electronic catalogue policyNot published
Total tender valueNot published
Tender lots in source1
Tender items in source1
Tender documents in source0
Awards in latest release1
Contracts in latest release1
Parties in latest release3

Notice history

DateEventReference
30 Jul 2024award, contract023810-2024

All source data

Unmodified official OCDS data retained by Tenderline for this procurement process.

Complete current OCDS release JSON
{
  "id": "023810-2024",
  "tag": [
    "award",
    "contract"
  ],
  "bids": {
    "statistics": [
      {
        "id": "1",
        "value": 4,
        "measure": "bids",
        "relatedLot": "1"
      }
    ]
  },
  "date": "2024-07-30T15:53:01+01:00",
  "ocid": "ocds-h6vhtk-048602",
  "buyer": {
    "id": "GB-FTS-75846",
    "name": "H M Revenue & Customs"
  },
  "awards": [
    {
      "id": "023810-2024-1",
      "status": "active",
      "suppliers": [
        {
          "id": "GB-COH-OC303471",
          "name": "Baringa Partners LLP"
        }
      ],
      "relatedLots": [
        "1"
      ]
    }
  ],
  "tender": {
    "id": "SR1947492365",
    "lots": [
      {
        "id": "1",
        "status": "cancelled",
        "hasOptions": false,
        "description": "Wave 1 of the CCG TOM Programme is now underway. Most of the projects have been in initiation and design but are due to move into implementation in FY 24/25 having completed a short project setting out a high-level approach to strategic prioritisation and having stood up a new Compliance Operations Directorate. \nWe are now looking to bring in a Technical Delivery Partner to assist with completing the design and implementation of Wave 1, where the projects are at various stages of readiness for implementation, and to commence the design for Wave 2.\nThe COD project has established the new cross-CCG Operations function that will consolidate and centralize various elements from different CCG Directorates to improve efficiency, effectiveness and customer experience. The formation of the COD Directorate sets the groundwork to achieve the critical success factors' intent. The project has created four main functions: (1) Professionalism and Capability, (2) Compliance Operational Process and Systems, (3) CCG Operational Planning, Performance, Evaluation and Resourcing, and (4) Compliance Design and Response.\nEnd to End Business Planning (E2E) is a key focus for this contract. The aim is to improve planning across CCG by designing a future state that prioritises CCG's key compliance risks and plans strategically over a multi-year timeframe enabling evolution to a \"Push Model\" whereby strategic direction dictates operational planning. \n-\tThe E2E project has separated activities into 3 workstreams. \n-\tUnder Workstream 1, a framework has been generated, that when implemented, will support prioritisation and multi-year planning. Lessons have been captured and where appropriate utilised in maturing FY24/25 thinking. \n-\tUnder Workstream 2 (carried forward from 23/24) detailed process designs remain work in progress and when approved, will be taken forward for implementation aligned with the maturing implementation plan. \n-\tVia Workstream 3, the project team aim to execute year one of the multi-year implementation plan, resulting in a Minimum Viable Product version of the business planning process. \nWave 2 activities and future projects have not been determined/agreed, and the delivery partner will support with developing the Concept, Discovery and Design phases of Wave 2. \nFor context, a CCG TOM Programme with circa 51FTE has been established with a monthly Programme Board and monthly project boards (E2E, COD, S&C, TOM_CoR, MI). Multi-disciplinary project teams have been established for each Wave 1 project with access to an allocated Senior Responsible Officer, project manager, project support, business analysts, SMEs, change managers, comms managers, benefits managers and design support.  \nThe new Technical Delivery Partner will be providing Programme Director support, via the agreed outcomes. the expectation is that the delivery partner will be fully integrated with the rest of the TOM Programme team.",
        "awardCriteria": {
          "criteria": [
            {
              "type": "price"
            }
          ]
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UK"
          }
        ]
      }
    ],
    "title": "Target Operational Model (TOM) Delivery Partner for CCG",
    "status": "complete",
    "coveredBy": [
      "GPA"
    ],
    "legalBasis": {
      "id": "32014L0024",
      "scheme": "CELEX"
    },
    "description": "Wave 1 of the CCG TOM Programme is now underway. Most of the projects have been in initiation and design but are due to move into implementation in FY 24/25 having completed a short project setting out a high-level approach to strategic prioritisation and having stood up a new Compliance Operations Directorate. \nWe are now looking to bring in a Technical Delivery Partner to assist with completing the design and implementation of Wave 1, where the projects are at various stages of readiness for implementation, and to commence the design for Wave 2.\nThe COD project has established the new cross-CCG Operations function that will consolidate and centralize various elements from different CCG Directorates to improve efficiency, effectiveness and customer experience. The formation of the COD Directorate sets the groundwork to achieve the critical success factors' intent. The project has created four main functions: (1) Professionalism and Capability, (2) Compliance Operational Process and Systems, (3) CCG Operational Planning, Performance, Evaluation and Resourcing, and (4) Compliance Design and Response.\nEnd to End Business Planning (E2E) is a key focus for this contract. The aim is to improve planning across CCG by designing a future state that prioritises CCG's key compliance risks and plans strategically over a multi-year timeframe enabling evolution to a \"Push Model\" whereby strategic direction dictates operational planning. \n-\tThe E2E project has separated activities into 3 workstreams. \n-\tUnder Workstream 1, a framework has been generated, that when implemented, will support prioritisation and multi-year planning. Lessons have been captured and where appropriate utilised in maturing FY24/25 thinking. \n-\tUnder Workstream 2 (carried forward from 23/24) detailed process designs remain work in progress and when approved, will be taken forward for implementation aligned with the maturing implementation plan. \n-\tVia Workstream 3, the project team aim to execute year one of the multi-year implementation plan, resulting in a Minimum Viable Product version of the business planning process. \nWave 2 activities and future projects have not been determined/agreed, and the delivery partner will support with developing the Concept, Discovery and Design phases of Wave 2. \nFor context, a CCG TOM Programme with circa 51FTE has been established with a monthly Programme Board and monthly project boards (E2E, COD, S&C, TOM_CoR, MI). Multi-disciplinary project teams have been established for each Wave 1 project with access to an allocated Senior Responsible Officer, project manager, project support, business analysts, SMEs, change managers, comms managers, benefits managers and design support.  \nThe new Technical Delivery Partner will be providing Programme Director support, via the agreed outcomes. the expectation is that the delivery partner will be fully integrated with the rest of the TOM Programme team.",
    "classification": {
      "id": "72590000",
      "scheme": "CPV",
      "description": "Computer-related professional services"
    },
    "procurementMethod": "limited",
    "mainProcurementCategory": "services",
    "procurementMethodDetails": "Award procedure without prior publication of a call for competition",
    "procurementMethodRationale": "The call for competition was via an established Framework. All Providers on the Framework were invited to participate by expressing their interest.",
    "procurementMethodRationaleClassifications": [
      {
        "id": "D_OUTSIDE_SCOPE",
        "scheme": "TED_PT_AWARD_CONTRACT_WITHOUT_CALL",
        "description": "The procurement falls outside the scope of application of the directive"
      }
    ]
  },
  "parties": [
    {
      "id": "GB-FTS-75846",
      "name": "H M Revenue & Customs",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UK",
        "locality": "LONDON",
        "postalCode": "SW1A2BQ",
        "countryName": "United Kingdom",
        "streetAddress": "100 PARLIAMENT STREET"
      },
      "details": {
        "url": "https://www.gov.uk/government/organisations/hm-revenue-customs",
        "classifications": [
          {
            "id": "NATIONAL_AGENCY",
            "scheme": "TED_CA_TYPE",
            "description": "National or federal agency/office"
          },
          {
            "id": "01",
            "scheme": "COFOG",
            "description": "General public services"
          }
        ]
      },
      "identifier": {
        "legalName": "H M Revenue & Customs",
        "noIdentifierRationale": "notOnAnyRegister"
      },
      "contactPoint": {
        "name": "Emma Dearden",
        "email": "emma.dearden@hmrc.gov.uk",
        "telephone": "+44 7777777777"
      }
    },
    {
      "id": "GB-COH-OC303471",
      "name": "Baringa Partners LLP",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UK",
        "locality": "London",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "id": "OC303471",
        "scheme": "GB-COH",
        "legalName": "Baringa Partners LLP"
      }
    },
    {
      "id": "GB-FTS-120026",
      "name": "HMRC",
      "roles": [
        "reviewBody"
      ],
      "address": {
        "locality": "London",
        "postalCode": "SW1A 2BQ",
        "countryName": "United Kingdom",
        "streetAddress": "100 Parliament Street"
      },
      "identifier": {
        "legalName": "HMRC"
      }
    }
  ],
  "language": "en",
  "contracts": [
    {
      "id": "023810-2024-1",
      "value": {
        "amount": 4165000,
        "currency": "GBP"
      },
      "status": "active",
      "awardID": "023810-2024-1",
      "dateSigned": "2024-07-22T00:00:00+01:00"
    }
  ],
  "initiationType": "tender"
}
Complete JSON history (1 releases)
30 Jul 2024 · 023810-2024 · award, contract
{
  "id": "023810-2024",
  "tag": [
    "award",
    "contract"
  ],
  "bids": {
    "statistics": [
      {
        "id": "1",
        "value": 4,
        "measure": "bids",
        "relatedLot": "1"
      }
    ]
  },
  "date": "2024-07-30T15:53:01+01:00",
  "ocid": "ocds-h6vhtk-048602",
  "buyer": {
    "id": "GB-FTS-75846",
    "name": "H M Revenue & Customs"
  },
  "awards": [
    {
      "id": "023810-2024-1",
      "status": "active",
      "suppliers": [
        {
          "id": "GB-COH-OC303471",
          "name": "Baringa Partners LLP"
        }
      ],
      "relatedLots": [
        "1"
      ]
    }
  ],
  "tender": {
    "id": "SR1947492365",
    "lots": [
      {
        "id": "1",
        "status": "cancelled",
        "hasOptions": false,
        "description": "Wave 1 of the CCG TOM Programme is now underway. Most of the projects have been in initiation and design but are due to move into implementation in FY 24/25 having completed a short project setting out a high-level approach to strategic prioritisation and having stood up a new Compliance Operations Directorate. \nWe are now looking to bring in a Technical Delivery Partner to assist with completing the design and implementation of Wave 1, where the projects are at various stages of readiness for implementation, and to commence the design for Wave 2.\nThe COD project has established the new cross-CCG Operations function that will consolidate and centralize various elements from different CCG Directorates to improve efficiency, effectiveness and customer experience. The formation of the COD Directorate sets the groundwork to achieve the critical success factors' intent. The project has created four main functions: (1) Professionalism and Capability, (2) Compliance Operational Process and Systems, (3) CCG Operational Planning, Performance, Evaluation and Resourcing, and (4) Compliance Design and Response.\nEnd to End Business Planning (E2E) is a key focus for this contract. The aim is to improve planning across CCG by designing a future state that prioritises CCG's key compliance risks and plans strategically over a multi-year timeframe enabling evolution to a \"Push Model\" whereby strategic direction dictates operational planning. \n-\tThe E2E project has separated activities into 3 workstreams. \n-\tUnder Workstream 1, a framework has been generated, that when implemented, will support prioritisation and multi-year planning. Lessons have been captured and where appropriate utilised in maturing FY24/25 thinking. \n-\tUnder Workstream 2 (carried forward from 23/24) detailed process designs remain work in progress and when approved, will be taken forward for implementation aligned with the maturing implementation plan. \n-\tVia Workstream 3, the project team aim to execute year one of the multi-year implementation plan, resulting in a Minimum Viable Product version of the business planning process. \nWave 2 activities and future projects have not been determined/agreed, and the delivery partner will support with developing the Concept, Discovery and Design phases of Wave 2. \nFor context, a CCG TOM Programme with circa 51FTE has been established with a monthly Programme Board and monthly project boards (E2E, COD, S&C, TOM_CoR, MI). Multi-disciplinary project teams have been established for each Wave 1 project with access to an allocated Senior Responsible Officer, project manager, project support, business analysts, SMEs, change managers, comms managers, benefits managers and design support.  \nThe new Technical Delivery Partner will be providing Programme Director support, via the agreed outcomes. the expectation is that the delivery partner will be fully integrated with the rest of the TOM Programme team.",
        "awardCriteria": {
          "criteria": [
            {
              "type": "price"
            }
          ]
        }
      }
    ],
    "items": [
      {
        "id": "1",
        "relatedLot": "1",
        "deliveryAddresses": [
          {
            "region": "UK"
          }
        ]
      }
    ],
    "title": "Target Operational Model (TOM) Delivery Partner for CCG",
    "status": "complete",
    "coveredBy": [
      "GPA"
    ],
    "legalBasis": {
      "id": "32014L0024",
      "scheme": "CELEX"
    },
    "description": "Wave 1 of the CCG TOM Programme is now underway. Most of the projects have been in initiation and design but are due to move into implementation in FY 24/25 having completed a short project setting out a high-level approach to strategic prioritisation and having stood up a new Compliance Operations Directorate. \nWe are now looking to bring in a Technical Delivery Partner to assist with completing the design and implementation of Wave 1, where the projects are at various stages of readiness for implementation, and to commence the design for Wave 2.\nThe COD project has established the new cross-CCG Operations function that will consolidate and centralize various elements from different CCG Directorates to improve efficiency, effectiveness and customer experience. The formation of the COD Directorate sets the groundwork to achieve the critical success factors' intent. The project has created four main functions: (1) Professionalism and Capability, (2) Compliance Operational Process and Systems, (3) CCG Operational Planning, Performance, Evaluation and Resourcing, and (4) Compliance Design and Response.\nEnd to End Business Planning (E2E) is a key focus for this contract. The aim is to improve planning across CCG by designing a future state that prioritises CCG's key compliance risks and plans strategically over a multi-year timeframe enabling evolution to a \"Push Model\" whereby strategic direction dictates operational planning. \n-\tThe E2E project has separated activities into 3 workstreams. \n-\tUnder Workstream 1, a framework has been generated, that when implemented, will support prioritisation and multi-year planning. Lessons have been captured and where appropriate utilised in maturing FY24/25 thinking. \n-\tUnder Workstream 2 (carried forward from 23/24) detailed process designs remain work in progress and when approved, will be taken forward for implementation aligned with the maturing implementation plan. \n-\tVia Workstream 3, the project team aim to execute year one of the multi-year implementation plan, resulting in a Minimum Viable Product version of the business planning process. \nWave 2 activities and future projects have not been determined/agreed, and the delivery partner will support with developing the Concept, Discovery and Design phases of Wave 2. \nFor context, a CCG TOM Programme with circa 51FTE has been established with a monthly Programme Board and monthly project boards (E2E, COD, S&C, TOM_CoR, MI). Multi-disciplinary project teams have been established for each Wave 1 project with access to an allocated Senior Responsible Officer, project manager, project support, business analysts, SMEs, change managers, comms managers, benefits managers and design support.  \nThe new Technical Delivery Partner will be providing Programme Director support, via the agreed outcomes. the expectation is that the delivery partner will be fully integrated with the rest of the TOM Programme team.",
    "classification": {
      "id": "72590000",
      "scheme": "CPV",
      "description": "Computer-related professional services"
    },
    "procurementMethod": "limited",
    "mainProcurementCategory": "services",
    "procurementMethodDetails": "Award procedure without prior publication of a call for competition",
    "procurementMethodRationale": "The call for competition was via an established Framework. All Providers on the Framework were invited to participate by expressing their interest.",
    "procurementMethodRationaleClassifications": [
      {
        "id": "D_OUTSIDE_SCOPE",
        "scheme": "TED_PT_AWARD_CONTRACT_WITHOUT_CALL",
        "description": "The procurement falls outside the scope of application of the directive"
      }
    ]
  },
  "parties": [
    {
      "id": "GB-FTS-75846",
      "name": "H M Revenue & Customs",
      "roles": [
        "buyer"
      ],
      "address": {
        "region": "UK",
        "locality": "LONDON",
        "postalCode": "SW1A2BQ",
        "countryName": "United Kingdom",
        "streetAddress": "100 PARLIAMENT STREET"
      },
      "details": {
        "url": "https://www.gov.uk/government/organisations/hm-revenue-customs",
        "classifications": [
          {
            "id": "NATIONAL_AGENCY",
            "scheme": "TED_CA_TYPE",
            "description": "National or federal agency/office"
          },
          {
            "id": "01",
            "scheme": "COFOG",
            "description": "General public services"
          }
        ]
      },
      "identifier": {
        "legalName": "H M Revenue & Customs",
        "noIdentifierRationale": "notOnAnyRegister"
      },
      "contactPoint": {
        "name": "Emma Dearden",
        "email": "emma.dearden@hmrc.gov.uk",
        "telephone": "+44 7777777777"
      }
    },
    {
      "id": "GB-COH-OC303471",
      "name": "Baringa Partners LLP",
      "roles": [
        "supplier"
      ],
      "address": {
        "region": "UK",
        "locality": "London",
        "countryName": "United Kingdom"
      },
      "details": {
        "scale": "sme"
      },
      "identifier": {
        "id": "OC303471",
        "scheme": "GB-COH",
        "legalName": "Baringa Partners LLP"
      }
    },
    {
      "id": "GB-FTS-120026",
      "name": "HMRC",
      "roles": [
        "reviewBody"
      ],
      "address": {
        "locality": "London",
        "postalCode": "SW1A 2BQ",
        "countryName": "United Kingdom",
        "streetAddress": "100 Parliament Street"
      },
      "identifier": {
        "legalName": "HMRC"
      }
    }
  ],
  "language": "en",
  "contracts": [
    {
      "id": "023810-2024-1",
      "value": {
        "amount": 4165000,
        "currency": "GBP"
      },
      "status": "active",
      "awardID": "023810-2024-1",
      "dateSigned": "2024-07-22T00:00:00+01:00"
    }
  ],
  "initiationType": "tender"
}