complete
Official procurement procedure

DV4 Enterprise

Construction work for water projects
Engineering design services
Engineering works and construction works
Published value
Not published
Submission deadline Not published
Lots published2
Procurement Executive Summary
AI & Search Synopsis
Generated from official OCDS record
Tenderline Synopsis: Scottish Water: "DV4 Enterprise". Published status: complete. Published value: Value not published. 2 published lots. Submission deadline not published. See the official notice for participation instructions.
Contracting AuthorityScottish WaterScope & CategoriesNot publishedSubmission Window
complete
No deadline published
Submission GatewayDirect notice routeLegal Basis & RegimeStandard procurementEstimated Value (exc. VAT)Not published
Bidder Intelligence · Authority Profile: Scottish Water
Market Analytics
View Authority Profile →
Derived from OCDS awards & bid statistics
Published history for Scottish Water. These figures describe retained records, not a forecast of bids or a measure of buyer bias.
Published-to-award variance
Not availableInsufficient comparable data
Requires at least 5 comparable procedures
Competition Density
5.8Bids / Report
9.1% of reports have one bid
Supplier ConcentrationNo estimate
Insufficient attributable awardsNo concentration estimate available
Payment Terms
Check noticePublished terms
Payment obligations depend on the applicable regime and contract. Consult the official documents.
Coverage: 26 active published awards; 22 bid reports (which may be per lot). Supplier values exclude multi-supplier awards, frameworks and DPS, and use GBP only. They are published award values, not payments. Published-to-award variance compares single-lot, single-award, single-supplier GBP procedures with explicitly non-framework/non-DPS status; increases remain in the average. Unpublished data stays unknown. Awarded suppliers are winners, not all bidders.
Procedure terms
Contracting AuthorityScottish Water
Procedure methodNot published
Procurement categoryNot published
Statuscomplete
Framework / DPSFramework
CompetitionNot published
Above thresholdNot published
Legal basisNot published
Tender period startsNot published
Clarification deadlineNot published
Electronic submissionNot published
Submission languagesNot published
Published25 Mar 2026, 09:06 GMT
Last source update25 Mar 2026, 09:06 GMT
Recurring procurementNot published
ClassificationConstruction work for water projects, Engineering design services, Engineering works and construction works
Delivery area
OCIDocds-h6vhtk-04be95
What is being bought
Scottish Water is seeking to appoint suitably experienced Asset Delivery Partners and Primary Designer(s) and to deliver our SR27 and SR33 programme of capital works. SR27 is the regulatory period spanning from April 2027 until March 2033. SR33 is the regulatory period spanning from April 2033 until March 2039. Scottish Water aim to award this procurement by March 2026. It will run for a fixed period of seven years until March 2033 with an option to extend for a further six years until March 2039. <br/><br/>The Construction, Design and Management (CDM) 2015 Regulations will apply. Successful bidders will be required to utilise Scottish Waters Supply Chain and Specialist Frameworks. <br/><br/>To deliver the Capital Investment Programme SW is creating an Enterprise, an advanced partnering supply chain model which includes Asset Delivery Partners (ADP) and Primary Designer(s) (PD) working together in high performing integrated teams to deliver programmes of work. <br/><br/>The Enterprise model will have a dynamic outcome-based set of measures, with partners incentivised against service sub-programme and Enterprise outcomes and SW will have embedded resources within the Enterprise. There will also be minimum business performance thresholds in the form of KPI’s.<br/><br/>The Enterprise will incorporate enhanced partnering capabilities and a behavioural environment supporting closer resource integration, combined with a trading environment that also supports this approach. This will deliver affordability to support our investment targets, whilst also being adaptable and flexible enough to support changing requirements. <br/><br/>There will be collective focus on Beyond Zero Harm which helps us drive towards improving health, safety and wellbeing and partners will support Scottish Waters Beyond Net Zero ambitions.<br/><br/>This enterprise model procurement will be structured into two Lots: Lot 1 Primary Designer/s, Lot 2 Asset Delivery Partners
What changed
From the official release history
  1. tender value changed
    25 Mar 2026, 09:06 GMT
  2. Status changed to complete
    25 Mar 2026, 09:06 GMT
  3. Official notice release published
    25 Mar 2026, 09:06 GMT
  4. Submission deadline changed to published date
    25 Mar 2026, 09:06 GMT
  5. Published value updated to £9,000,000,000
    25 Nov 2024, 16:55 GMT
  6. Status changed to active
    25 Nov 2024, 16:55 GMT
  7. Official notice release published
    25 Nov 2024, 16:55 GMT
  8. Submission deadline changed to 6 Jan 2025, 12:00 GMT
    25 Nov 2024, 16:55 GMT
  9. Buyer information updated
    25 Nov 2024, 16:55 GMT
Lots and requirements (2)
Published by the contracting authority
  • Lot 1 · #1
    Lot 1 - Primary Designer(s)
    cancelled
    Published valueNot published
    Scottish Water is seeking to appoint a strategic partner(s) for the provision of Primary Designer services. This will provide assistance with the Strategic programme development, design and delivery of its Investment Programme and will cover improvement works associated with all Water and Wastewater assets across Scotland. This may include new assets, renewals, modification, maintenance, refurbishments, extensions and enhancements to existing assets. It is a requirement that bidders must be capable to act as the Principal Designer role under the Construction, Design and Management (CDM) 2015 Regulations, this includes pre construction responsibilities. <br/><br/>Estimated contract value across the framework for a 13 year period, expected to commence April 2026 is in the range of £600 million to £1.3bn. <br/>The Primary Designer will be engaged to provide strategic support, studies, design and technical services at pre, during and post construction, ensuring successful delivery of infrastructure and non-infrastructure programs. They will enhance and maintain a standard design and product library driving process engineering, Nature Based Solutions (NBS) and low carbon products and processes. The Primary Designer will maximise the use of repeatable designs and processes to deliver projects ensuring successful delivery of infrastructure and non-infrastructure programmes of work.<br/>The appointed primary designer(s) is expected to work with Scottish Water and Enterprise Partners over the duration of this agreement to develop effective collaboration, which may include the negotiation of incentive mechanisms, sharing of risk, co-location with multi-agency teams and secondment.<br/><br/>SW Primary designer will be required to support the Enterprises end to end processes, the Partner(s) that will provide Scottish Water’s Primary Designer services will support:<br/><br/>• Support Scottish Water Scottish Water Strategic Ambitions of; Service excellence, Beyond net zero emissions and Great value and financial sustainability.<br/>• The design and development of solutions for delivery by framework delivery partners or tendered contractors.<br/>• Create and develop design specifications, drawings, and technical documentation.<br/>• Collaborate with internal teams to align designs with operational and maintenance requirements.<br/>• Holds end to end accountability for project design.<br/>• Ensure compliance with SW requirements, relevant industry standards and regulations.<br/>• Manage Scottish Water’s standard products and design library whilst working with the wider SW supply chain.<br/>• Integration of Primary Designer outcomes with Common Data Environment (CDE) as required ensuring compliance with key areas e.g. file locations, file integrity, format etc<br/>• Drive standardisation in design and design management, low carbon products and processes and innovation across programmes and supply chains.<br/>• The study, investigation, data collection, modelling and identification of water and wastewater service related performance improvement requirements. <br/>• The provision of modelling support to inform the design and development of solutions.<br/>• The auditing and assessment of water and wastewater models developed by others.<br/>• Project management support and resources<br/>• The development and assessment of traditional and innovative asset and operational based solutions, feasibility studies, and investment appraisals to support decision making by the client.<br/>• Technical support<br/>• Provide expert technical advice and design support throughout the project lifecycle, from conception to completion providing buildability/delivery plan input and client design assurance. Develop outline plans and requirements to commission the projects being developed and how standard products will be commissioned - standard commissioning.<br/>• Provide expertise on an ‘as needed’ basis to ensure knowledge transfer and continuity of design support.<br/>• Provide digital handover packages and configure asset information, ensuring lessons learned are recorded.<br/>• Supply technically qualified professionals to be seconded to the water utility for defined periods to support in-house teams.<br/>• Undertake environmental impact assessments, studies, risk analyses, and technical evaluations as needed.<br/>• Evaluate alternative solutions for system upgrades or new infrastructure, providing recommendations based on cost, feasibility, and performance.<br/>• Support the client through strategic consultancy advice, including digital engineering / assembly techniques opportunities e.g. digital twin, rehearsal.<br/>• Provide expertise to support the understanding of future climate impacts on Scottish Waters assets and environment to ensure that systems and services are resilient to climate change.<br/><br/>The Primary Designer is responsible for design and takes accountability for design across the project lifecycle working with the integrated high performing Enterprise team it is a part of. The Primary Designer assesses the most effective way to deliver outcomes i.e. prioritises no build, less build / alternative solutions, efficient build. The Primary Designer works with the supply chain to identify and develop standardisation and alternative low carbon opportunities and agree Asset Delivery Partner or supply chain led elements of the design. The Primary Designer supports Client with asset planning and asset strategy/policy and standards.
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
  • Lot 2 · #2
    Lot 2 - Asset Delivery Partners
    cancelled
    Published valueNot published
    Scottish Water is seeking to appoint Asset Delivery Partners (ADPs) which will be accountable for driving programme/project delivery, liaising with the Enterprise Primary Designer and Integrator functions to perform Design & Build activities, while adhering to standardised designs. The ADP manages day-to-day activities during construction and coordinates the works with Scottish Water Operations until the point of asset handover.<br/><br/>Scottish Water is seeking to appoint suitably experienced Civils, Infrastructure and MEICA (Including Process Engineering capability) Asset Delivery Partners to deliver our SR27 and SR33 programme of capital works under an outcome-based Enterprise model. Works may include new assets and renewals, surveys and inspections, modifications, complex maintenance, refurbishments, extensions, and enhancements to existing assets. More specifically, the programmes of work based on the SR27 forecast include:<br/><br/>Design and construction of complex and non-complex civil engineering, mechanical, electrical, hydraulic, telemetry, control, instrumentation, and commissioning as required. This support will include works associated with new assets, renewals, modification, maintenance, and refurbishment of water and wastewater networks including mains rehabilitation and lining, sewerage networks, pumping stations and process works including mechanical, electrical, instrumentation and commissioning. The programme pipeline in SR27 includes but is not limited to UID and Flooding Network Capital Maintenance, Waste Water Treatments Works (WWTW) Upgrades & Growth, WWTW Capital Maintenance, Water Networks and new and replacement Pipelines, cleaning and maintenance, Water Treatment Works (WTW) upgrades & Capital Maintenance, Treated Water Storage build and repair.<br/><br/>We are looking for bidders who are committed to working in a safe, collaborative, and flexible way, who will support our drive for increased cost, carbon, time and standardisation efficiencies and who hold the appropriate capability and resources to help us deliver our strategic ambitions of Beyond Net Zero, Service Excellence and Great Value and Financial Sustainability. Successful bidders must be able to safely carry out Principal Contractor responsibilities and will be required to evidence their experience and capabilities in design and build activities for large and complex projects as well as operational requirements such as but not limited to; major water bursts, major sewer collapses and leakage support. Bidders must only bid as single entities and not as joint ventures or consortium. <br/><br/>The framework will be awarded from 2026-2033, with extension options, at client discretion based on business requirements, up to 2039. The estimated net value range of this procurement is £4bn - £7.7bn. Ranges are based on 2024 pricing and as such, Scottish Water reserves the right to index these values over the duration of the procurement. Successful partners will get an allocated share of this work as part of the advanced partnering approach. <br/><br/>Scottish Water reserves the right to augment the supply chain during SR27 to support emerging SR33 needs. SR33 is the period from 1st April 2033 until 31st March 2039. To facilitate this, a mid-point review of the SR27 supply chain will be conducted in 2030 and the current supply chain capacity and capability will be assessed at this time to ensure business requirements will be met. Based on the outcome of the review, Scottish Water reserves the right to procure additional/alternative supply chain contractor partners, as required.<br/><br/>The scope of the ADP (Lot 2) will be further divided into three sub-lots:<br/>2a) Civils <br/>• indicative works include creation of above or below ground civil structures e.g. storm tanks and treated water storage tanks.<br/>2b) Infrastructure<br/>• indicative works include installation of new pipework, replacement pipework, refurbished pipework or major repairs of water and sewer pipework, and water pipe lining.<br/>2c) Mechanical, Electrical, Instrumentation, Control and Automation (MEICA) - including Process Engineering, Commissioning Engineering and Smart Technology/Internet of Things (IoT).<br/>•Mechanical: This involves the design, installation and maintenance of mechanical systems including pumps, piping and treatment processes.<br/>• Electrical: This includes electrical site cabling, motor control centres (MCCs) and other electrical installations.<br/>• Instrumentation: This covers the devices and systems used to measure and control variables like flow, temperature, pressure and quality<br/>• Control: This includes operational technology, systems and software used to control and automate operational processes.<br/>• Automation: This refers to the integration of various systems to automate processes, improving efficiency and reliability including AI and data analytics.<br/>• Process Engineering: The includes the design, installation, integration and commissioning of process equipment to treat water and wastewater to the required standards for supply to customers or discharge to the environment.<br/>• Commissioning Engineering: Ensures that systems and components are designed, installed, tested, operated, and maintained according to the operational requirements of the client.<br/>• Smart Technology / IoT: Ability to design, install and commission smart technologies and IoT systems, including selecting appropriate technology, sensors, devices, and communication protocols. Ensuring these are integrated into site industrial control systems and connected to top-end communication and corporate data platforms.<br/><br/>These lots will be evaluated separately, and bidders are able to bid on one or multiple sub-lots. Bidders may be awarded more than one sub-lot.
    Contract periodNot published
    EligibilityNot published
    Options / renewalNot published
Timeline
  1. Procedure published
    25 Mar 2026, 09:06 GMT
  2. Award active
    Not published · Not published
  3. Award active
    Not published · Not published
  4. Award active
    Not published · Not published
  5. Award active
    Not published · Not published
  6. Award active
    Not published · Not published
  7. Award active
    Not published · Not published
  8. Award active
    Not published · Not published
  9. Contract active
    Signed 19 Mar 2026, 00:00 GMT · £650,000,000
  10. Contract active
    Signed 19 Mar 2026, 00:00 GMT · £650,000,000
  11. Contract active
    Signed 19 Mar 2026, 00:00 GMT · £1,540,000,000
  12. Contract active
    Signed 19 Mar 2026, 00:00 GMT · £1,540,000,000
  13. Contract active
    Signed 19 Mar 2026, 00:00 GMT · £1,540,000,000
  14. Contract active
    Signed 19 Mar 2026, 00:00 GMT · £1,540,000,000
  15. Contract active
    Signed 19 Mar 2026, 00:00 GMT · £1,540,000,000
Commercial outcome and competition
Awards
AECOM Limited
Not published · Not published · active
Stantec UK Ltd
Not published · Not published · active
WGM Engineering
Not published · Not published · active
Mott MacDonald Bentley Ltd
Not published · Not published · active
Farrans Limited
Not published · Not published · active
Ross-shire Engineering Limited (RSE)
Not published · Not published · active
M Group Water (Network Infrastructure) Ltd
Not published · Not published · active
Contracts
Lot 1 - Primary Designer(s)
£650,000,000 · signed 19 Mar 2026, 00:00 GMT · active
Lot 1 - Primary Designer(s)
£650,000,000 · signed 19 Mar 2026, 00:00 GMT · active
Lot 2 - Asset Delivery Partners
£1,540,000,000 · signed 19 Mar 2026, 00:00 GMT · active
Lot 2 - Asset Delivery Partners
£1,540,000,000 · signed 19 Mar 2026, 00:00 GMT · active
Lot 2 - Asset Delivery Partners
£1,540,000,000 · signed 19 Mar 2026, 00:00 GMT · active
Lot 2 - Asset Delivery Partners
£1,540,000,000 · signed 19 Mar 2026, 00:00 GMT · active
Lot 2 - Asset Delivery Partners
£1,540,000,000 · signed 19 Mar 2026, 00:00 GMT · active
Bid statistics
bids: 4 (lot 1)
bids: 4 (lot 1)
electronicBids: 4 (lot 1)
electronicBids: 4 (lot 1)
foreignBidsFromEU: 0 (lot 1)
foreignBidsFromEU: 0 (lot 1)
foreignBidsFromNonEU: 0 (lot 1)
foreignBidsFromNonEU: 0 (lot 1)
smeBids: 0 (lot 1)
smeBids: 0 (lot 1)
bids: 9 (lot 2)
bids: 9 (lot 2)
bids: 9 (lot 2)
bids: 9 (lot 2)
bids: 9 (lot 2)
electronicBids: 9 (lot 2)
electronicBids: 9 (lot 2)
electronicBids: 9 (lot 2)
electronicBids: 9 (lot 2)
electronicBids: 9 (lot 2)
foreignBidsFromEU: 0 (lot 2)
foreignBidsFromEU: 0 (lot 2)
foreignBidsFromEU: 0 (lot 2)
foreignBidsFromEU: 0 (lot 2)
foreignBidsFromEU: 0 (lot 2)
foreignBidsFromNonEU: 0 (lot 2)
foreignBidsFromNonEU: 0 (lot 2)
foreignBidsFromNonEU: 0 (lot 2)
foreignBidsFromNonEU: 0 (lot 2)
foreignBidsFromNonEU: 0 (lot 2)
smeBids: 0 (lot 2)
smeBids: 0 (lot 2)
smeBids: 0 (lot 2)
smeBids: 0 (lot 2)
smeBids: 0 (lot 2)
Buyer and organisations in this procedure

Scottish Water

Contracting authority GB-FTS-130632
View buyer profile
  • Scottish Water
    buyer
    mediationBody

    The Bridge, 6 Buchanan Gate, Stepps, Glasgow, UKM, G33 6FB
    +44 1414830892
  • AECOM Limited
    supplier

    01846493
    1 Tanfield Edinburgh, EH3 5DA, Edinburgh, UKM, EH15 1NZ
  • Farrans Limited
    supplier

    NI004078
    101 Kingsway Dunmurry Belfast, Belfast, UKM, BT17 9NS
  • Glasgow Sheriff Court
    reviewBody

    1 Carlton Place, Glasgow, G5 9DA
  • M Group Water (Network Infrastructure) Ltd
    supplier

    04530602
    Abel Smith House, Gunnels Wood Road Stevenage Herts, Stevenage, UKM, SG1 2ST
  • Mott MacDonald Bentley Ltd
    supplier

    3827321
    Snaygill Industrial Estate, Keighley Road, Skipton, North Yorkshire, Skipton, UKM, BD232QR
  • Ross-shire Engineering Limited (RSE)
    supplier

    SC177939
    Mansefield House, Muir Of Ord Industrial Estate, Muir Of Ord, Ross-Shire, IV6 7UA, Ross-Shire, UKM, EH48 2UP
  • Stantec UK Ltd
    supplier

    01188070
    Kelburn Court, Birchwood, Birchwood, UKM, WA3 6UT
  • WGM Engineering
    supplier

    SC099834
    1 Albion Court,  157 Woodville St Glasgow, Glasgow, UKM, G51 2RQ
Documents (0)
Official links; attachments are not copied
No data
No linked documents are published
Related procedures (0)
No data
No related procedures published